Question

A Plant Manager who has worked for a manufacturing facility for 32 years operates the plant...

A Plant Manager who has worked for a manufacturing facility for 32 years operates the plant as follows:

•Two eight (8) hour shifts per day

•Two 10-minute breaks per shift

•10 minute clean-up allowed each shift

•Unpaid 30 minute lunch

•10,000 pieces of inventory

•95,000 packages are shipped 20 days per month

•2 day lead time for all material

•5 minute clean up before lunch

•5 minute lag after Lunch

•15 minute meeting at start of each shift

Help this Plant manager to figure out “What is the Takt time for this facility”?

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A Plant Manager who has worked for a manufacturing facility for 32 years operates the plant...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Describe and compute the takt time based on the information below. Operating Time: The plant worked...

    Describe and compute the takt time based on the information below. Operating Time: The plant worked one shift of eight hours, with two 15 minute breaks and one 15 minute stand up department meeting. Customer Demand: Part A Quantity 40, Part B Quantity 20, Part C Quantity 50, and Part D Quantity 30

  • 38. Calculate the pieces per hour and the hours per unit for the following: Hours per 1,000 Piece...

    38. Calculate the pieces per hour and the hours per unit for the following: Hours per 1,000 Pieces Time StandardPieces per Hours per Piece Pieces per 8 Hours Minute 1.000 0.500 0.167 2.500 0.650 0.050 Hour Page 8 of 13 39. For the following data calculate the takt time. Length of shift: 8.5 hours, production requirements: 3,300 units, overall efficiency is 85%, non-production time: breaks 20 minutes; clean-up 10minutes; meeting 10 minutes, and lunch 30 minutes. 38. Calculate the pieces...

  • QUESTION 23 3 points Save Answer A small manufacturing company has a daily demand for product...

    QUESTION 23 3 points Save Answer A small manufacturing company has a daily demand for product at 4000 units/day. The plant operates for 1 shift/day of 480 minutes. Workers have two 15 minute breaks and 30 minute lunch - machines are idle during these breaks. Calculate the Takt Time (cycle time) for this company. TT T Arial 3 (12pt) T-5 E-Seis Path: p Words:0

  • The plant works one eight hours shift each day. Each day there are two 15-minute breaks and a ove hrour meeting The p...

    The plant works one eight hours shift each day. Each day there are two 15-minute breaks and a ove hrour meeting The part has a cycle time of 26 minutes. The customer needs 30 parts per day parts are delivered in a box of 15 parts each. how many people are need for this cell ? 1 2 3 4

  • Help with question b. please! The manager at Ormonde Inc. collected the value stream mapping data...

    Help with question b. please! The manager at Ormonde Inc. collected the value stream mapping data from the plant's most problematic manufacturing cell that fabricates parts for washing machines. This data is shown in Table 1. Using this data, calculate the current state performance of the cell and answer the following questions. Click the icon to view Table 1. a. What is the cell's current inventory level? The cell's current inventory level is 2050 parts. (Enter your response as a...

  • The manager at FunQ, Inc collected the value stream mapping data from one of t manufacturing...

    The manager at FunQ, Inc collected the value stream mapping data from one of t manufacturing cell. This produces The data is shown in the below table. ll produces a special steel part that is widely used in automotive industries Average demand:180 units/day Batch size: 30 units Number of shifts per day: 1 Availability: 8-hours shift with including two 30 min breaks (60 min break time in total), 7 hours net available time Basic cell information Cycle time 140 sec...

  • Goode Perk Company The Goode Perk Company produces several models of coffee makers. There is little...

    Goode Perk Company The Goode Perk Company produces several models of coffee makers. There is little difference in the production time required for the various model coffee machines. The plant is designed to produce 160 coffee machines per eight-hour shift, and there are two shifts per working day. However, the plant does not operate for the full eight hours: the employees take two 12-minute breaks in each shift, one in the first four hours and one in the second four...

  • Case Study: Acme Manufacturing Company Steve Arnold is a production manager at Acme Manufacturing Company in...

    Case Study: Acme Manufacturing Company Steve Arnold is a production manager at Acme Manufacturing Company in New Jersey. When Steve drove into the parking lot at the plant on Tuesday morning at 8:35, he was already 35 minutes late for work. Steve had overslept that morning because the night before he had stayed up late to finish the monthly production report for his department. He parked his car and entered the rear of the plant building. Passing through the shipping...

  • Building a Balanced Scorecard Hit-n-Run Inc. owns and operates 10 food trucks (mobile kitchens) throughout metropolitan...

    Building a Balanced Scorecard Hit-n-Run Inc. owns and operates 10 food trucks (mobile kitchens) throughout metropolitan Los Angeles. Each food truck has a different food theme, such as Irish-Mexican fusion, traditional Mexican street food, Ethiopian cuisine, and Lebanese-Italian fusion. The company was founded three years ago by Juanita O’Brien when she opened a single food truck with a unique menu. As her business has grown, she has become concerned about her ability to manage and control the business. O’Brien describes...

  • Please help with this assignment. There are 3 questions. I would require each answer of 1...

    Please help with this assignment. There are 3 questions. I would require each answer of 1 page long (total 3 pages). Any help would be appreciated. Case Study: ARBRECORP LTÉE Steven L. McShane, The University of Western Australia, and David Lebeter ArbreCorp Ltée is a sawmill operation in Québec, Canada, that is owned by a major forest products company, but operates independently of the parent company. It was built 30 years ago, and completely updated with new machinery five years...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT