Question

This project aims to develop an online bookstore system that acts as a central database containing...

This project aims to develop an online bookstore system that acts as a central database containing various books in stock along with their title, author’s name, published date, and cost. This project, basically a website, will get a large amount of online visitors. The system should be hosted on a cloud platform in order to avoid site crash. The project can be developed using Java (front end support) and SQL (back end support). The online bookstore stores various book related details. Microsoft Azure can be used for cloud based infrastructure.

Q-I: For the project, create work breakdown structure (WBS) that shows all the tasks, their estimated duration, and predecessor tasks using a Gantt chart and a PERT chart.

Q-II: Identify the task patterns, including complex patterns, and calculate the critical path. Show the task patterns and critical path using a diagram.

Q-III: Use a Microsoft Excel XY chart type to display a risk matrix that shows risk probability and potential impact for MSS project.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

answer

Interaction diagram

Interaction diagram

Sequence diagram

thank you

Add a comment
Know the answer?
Add Answer to:
This project aims to develop an online bookstore system that acts as a central database containing...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please help me with this. Create at least 10 interaction diagrams (5 sequence diagrams and 5...

    Please help me with this. Create at least 10 interaction diagrams (5 sequence diagrams and 5 communication diagrams) for the operation contracts created in Assignment 2. (Points 10*5=100). COMP 410 Assignment 3 Online Bookstore System on a Cloud Platform This project aims to develop an online bookstore system that acts as a central database containing various books in stock along with their title, author's name, published date, and cost. This project, basically a website, will get a large amount of...

  • Microsoft Project Assignment Description A system development project has been defined to contain the following list of...

    Microsoft Project Assignment Description A system development project has been defined to contain the following list of activities along with their estimated times for completion. The project will start on 5/1/2019. Project Data Provided: Activity ID Activity Name Days Predecessors Optimistic(O) Realistic(R) Pessimistic(P) 1 Gather Requirement 1 2 3 2 Analyze processes 1 2 6 1 3 Define DFDs 0.5 1 1.5 2 4 Design Processes 2 7 12 2 5 Design database 4 7 22 3 6 Design UI...

  • Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal a spoke plastics forming machine at a local manufacturing site. At this pre-project ph...

    Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal a spoke plastics forming machine at a local manufacturing site. At this pre-project phase, it has sembled a project planning team and is undertaking discussions with the client to produce a mgheve pct plan. A range of key tasks have been identified and a logical network diagram for high-level the project has been developed. Project task information is provided in the following table (Table...

  • Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal...

    Question 2 XYZ Industrial Machines has initiated a large client project to design, manufacture and instal a spoke plastics forming machine at a local manufacturing site. At this pre-project phase, it has sembled a project planning team and is undertaking discussions with the client to produce a mgheve pct plan. A range of key tasks have been identified and a logical network diagram for high-level the project has been developed. Project task information is provided in the following table (Table...

  • !!!Only Project 2 need to be answered!!! Project Report 1 Once the business case has been approved, you need to make a...

    !!!Only Project 2 need to be answered!!! Project Report 1 Once the business case has been approved, you need to make a project plan showing each task. Assume you are a project manager to lead your team to acquire an additional delivery van for the company. Please find the details below. The current month is January. Activity (What is to be done?) Objective (Why will we do it?) Resources (Where will it be done?) Procedures (How will it be done?)...

  • Performance Improvement programs and effective project management require an understanding of the four phases of the...

    Performance Improvement programs and effective project management require an understanding of the four phases of the project life-cycle: initiation, planning, execution/implementation, and closure. It is important to have each phase of the project mapped on a timeline and to be sure the project team has the appropriate members with the right skills to ensure a successful program. Using a case study from the text, students will demonstrate their ability to review and evaluate a performance improvement program by arranging the...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • I have this case study to solve. i want to ask which type of case study...

    I have this case study to solve. i want to ask which type of case study in this like problem, evaluation or decision? if its decision then what are the criterias and all? Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT