Question

Benson ProSystems needs a new signal conditioner module for a large process control system it is...

Benson ProSystems needs a new signal conditioner module for a large process control system it is designing. Current market conditions will support annual sales of 1,000 systems. Engineers estimate the following unit manufacturing costs for the module:

Direct materials $25
Direct labor 18
Variable manufacturing overhead 7
$50


Engineers estimate that 25 weeks of development work will be needed to develop, test, and verify the new design. Engineering resources (personnel and lab) to complete the development will cost $3,000 per week. If the engineers don’t work on this project, they will be assigned to another.

Longan Devices has a module that is quite similar to the one Benson needs. Longan can modify the device to suit Benson in just four weeks, and has offered to supply it to Benson at a price of $60 per unit.

(a)

Should Benson go forward with its design of the new module, or should it accept Longan’s offer?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Cost incurred for developing the module internally is $75000 (25 weeks x $3000 per week) and time involved is 25 weeks whereas if purchased from Logan then the cost is $60000 (1000 units x $60 per unit) and time involved is 4 weeks. Based on the cost and time involved it is advisable for the Benson ProSystems to accept the Longan's offer and should not go forward with its design of the new module.

Add a comment
Know the answer?
Add Answer to:
Benson ProSystems needs a new signal conditioner module for a large process control system it is...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Consider the proposal. Should SCF accept or reject ACL’s request? If you were the project manager,...

    Consider the proposal. Should SCF accept or reject ACL’s request? If you were the project manager, which option would you select? What risks are involved with your choice and with ACL’s request? Shell Case Fabricators BACKGROUND Shell Case Fabricators (SCF) designs and builds shell casings that enclose electronic products such as calculators, cell phones, modems. Typically the cases are plastic or plastic compounds. SCF has six different production lines that cover different types of product. For example, the largest high...

  • A computerized data-management system that supports several activities—such as order entry, result retrieval, documentation, and decision-support...

    A computerized data-management system that supports several activities—such as order entry, result retrieval, documentation, and decision-support across locations—would MOST accurately be considered a(n) ________. Group of answer choices clinical information system administrative information system hospital information system database To design a nursing system that will enhance usability by the nurse user requires that ________. Group of answer choices the design be developed with the patient in mind knowledge of systems from other industries be used the technology use of the...

  • 1. Establish a buyer's negotiating position and plan using the information in the case (It is...

    1. Establish a buyer's negotiating position and plan using the information in the case (It is suggested you answer questions 2 to 5 before preparing your plan), and include: a. Negotiation objectives. b. Identify two (2) or three (3) key issues to be negotiated and define the minimum, maximum and target positions for each. c. Identify important facts from buyer's point of view. d. Identify buyer's and seller's strengths and weaknesses. e. Identify buyer's and seller's needs. f. List other...

  • Matching Identify the document needed to support each of the following activities in a manufacturing organization...

    Matching Identify the document needed to support each of the following activities in a manufacturing organization a. Receiving direct materials at the dock b. Billing a customer for a completed order c. Recording the costs of a specific job requiring direct materials, direct labor, and overhead d. Issuing direct materials into production e. Recording direct labor time at the beginning and end of each work shift f. Placing an order for direct materials with a supplier 1. Purchase order 2....

  • A new version of the operating system is being planned for installation into your department’s production...

    A new version of the operating system is being planned for installation into your department’s production environment. What sort of testing would you recommend is done before your department goes live with the new version? Identify each type of testing and describe what is tested. Explain the rationale for performing each type of testing. [ your answer goes here ] Would the amount of testing and types of testing to be done be different if you were installing a security...

  • Attached is the memo that was covered briefly in the lecture video from this week. Open...

    Attached is the memo that was covered briefly in the lecture video from this week. Open the attachment and read the memo. Then, write a better memo, using the principles you learned from the chapter and video (you may completely write a new memo, using information found in the memo.). Hint: a better memo would be MUCH shorter than the original. The key to writing a good memo in this case is to keep in mind how you would want...

  • Problem 14-46 Introducing a New Product (LO 14-4, 14-5) [The following information applies to the questions...

    Problem 14-46 Introducing a New Product (LO 14-4, 14-5) [The following information applies to the questions displayed below.) Johnson and Gomez, Inc., is a small firm involved in the production and sale of electronic business products. The company is well known for its attention to quality and innovation During the past 15 months, a new product has been under development that allows users improved access to e-mail and video images. Johnson and Gomez code named the product the Wireless Wizard...

  • Blues Traveler Company sells electric razors. The company’s home office is in Princeton, New Jers...

    Blues Traveler Company sells electric razors. The company’s home office is in Princeton, New Jersey. The company was founded in 2005 when John Popper invested $300,000 for 30,000 shares and Chan Kinchla invested $200,000 for 20,000 shares of common stock. The only other financing activities relate to a $500,000 bank loan from 1st National Bank that accrues interest at six percent per year payable on January 1 each year that has an unpaid balance of $400,000. The loan is due...

  • Read the Janes' Electronics, Inc. case at the end of the exam and answer the following...

    Read the Janes' Electronics, Inc. case at the end of the exam and answer the following questions. Assume that you are preparing to bid on the audit and are working on your client acceptance issues. Develop a checklist of five areas or issues that you would want to research before you accepted this firm as an audit client. For each area or issue, explain why you would want to research it and give an example of where you might go...

  • Zando Pharmaceuticals is an affiliate of the German-based Heisenberg Corporation, which employs 40,000 worldwide. Zando’s St....

    Zando Pharmaceuticals is an affiliate of the German-based Heisenberg Corporation, which employs 40,000 worldwide. Zando’s St. Louis facility houses the U.S. corporate headquarters and Research and Development (R&D). It produces 30 products, using 28 different batch processes. The facility has 2,000 employees on-site. In recent years, Zando’s profitability has suffered, which can be attributed to increased competition, customer dissatisfaction, and regulatory pressures. Luis Alvarado, president of Zando, called a meeting to consider ways to improve profitability. He labeled the meeting...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT