In project estimation we need to calculate for example PRED(0.20) . how to find this value PRED(0.20) = 0.80 ?
Solution:
In project estimation we estimate Predictive Performance of Models.
The criterion used to evaluate the predictive quality of an estimation model was PRED (l) = k/n, where k is the number of projects in a specific sample of size n for which MRE <= l.
PRED (0.20) = 0.80 means 80% of the samples should have MRE values less than or equal to 0.20. While an MRE error level in 80% of the population less than 0.20 is the expectation of this criterion, multi-organiza- tional data such as in ISBSG data exhibit large MRE for 80% of the population.
In project estimation we need to calculate for example PRED(0.20) . how to find this v...
how can we calculate IRR of project? please give an example and solve it with typing the formula
true or false We were unable to transcribe this imageWhen the B/C ratio of each project is unknown then, we always need to ratio of each individual project before ranking and performing the incremental B f each project is unknown then, we always need to calculate the value of B/c True False When the B/C ratio of each project is unknown then, we always need to ratio of each individual project before ranking and performing the incremental B f each...
Calculate the final volume needed to prepare 0.20%(w/v) Kif we start with 10.0 ml. of 2.0 %(w/v) KI. Vf - Inome How many equivalents of calcium ions are present in 25.0 ml blood serum with a calcium ion concentration of 5.2 mEq/L? olutions, Osmosis, and Dialysis Lab dabce - page 10
how to do you find an estimation of a error instrument how do you find the smallest increment on a school ruler with inches and centimeters to find the error ?
Sometimes we need to find out how long it will take money to grow to some particular amount. For example, if a company's sales are growing at 10% per year, how long will it takes sales to triple? This answer is 11.53 ***The answer I need help with is as followers. If you want the investment to double in 8 years, what interest rate must it earn?
Please use C# For this project, we will see what it's like to write a simple windows application program that we can perform easily in our heads. You'll find that writing programs is similar to explaining things to a 5-year-old. You are to make this program "user friendly". In other words, make sure valid data has been entered. You are to create a simple change program. The user enters the amount due and the amount tendered. You are to calculate...
Hello, where do we find / how do we calculate the value of "Gains on asset sales" (value in 2010 equals 70) to reformulated the income statement? thank you. (P&G Case, reformulated income statement)
If we want to use the Richardson method to calculate the second order derivative symmetrically at the zero point of a function, how many points do we need at least? Give an example of these points we need. For this case, find the formula for the second derivative.
Calculate the beta of a company. a. What data do we need to collect and what calculations we need to do? b. Draw the graph show how to find the beta, please label the axes.
How do you find I when using Van't Hoff factor. For example I need it to solve the following problem but am struggling to find where the I comes from Calculate the freezing point and boiling point in each solution, assuming complete dissociation of the solute. Calculate the freezing point of a solution containing 14.2 g FeCl3 in 155 g water.