Question

PROBLEM Authorities of the Atherton Tablelands in North Queensland proposes a glass covered 3m long walkway scenic lookout toQuestions () Draw the plan view of the facility and the structure (2) Check the effective width of the flange of the beam as

PROBLEM Authorities of the Atherton Tablelands in North Queensland proposes a glass covered 3m long walkway scenic lookout to cater for tourists. The glass panels are to be attached to an aluminium frame attached to a reinforced concrete beam. You are required to design the reinforced concrete beam Gla Safety post up Thick glas SIDE VIEW FRONT VIEW Figure 1. Schematic View of the Walkway Structure To hold the aluminium frame/glass panels and to allow the tourists to walk in line, rest and enjoy the sceneries, a supporting reinforced concrete cantilever beam is conceived. Initial trials have provided the best possible dimensions for the RC beam as shown in Figure 2 L00 195 250 150 Figure 2. RC beam The loading on this cantilever structure was calculated as below Loading imposed by the glass panels and aluminium frame-11.6 kN/m .Loading imposed by tiles on slab and web of the beam-1.33 kN/m Loading imposed by the tourists- 16 kN/m Loading imposed by the safety reflector post at tip of the structure- 2 kN Loading imposed by the maintenance crew at tip of structure- 10 kN It was decided to use 40mm clear cover and 40MPa grade concrete (unit weight 25 kN/m
Questions () Draw the plan view of the facility and the structure (2) Check the effective width of the flange of the beam as per CI. 8.8.2, AS3700(2018) (3) Determine self-weight in kN/m (4) Determine the magnitude of the uniformly distributed G load (5) Determine the magnitude of the uniformly distributed ultimate design load w (6) Determine ultimate point load at tip of the beam P mine design ing momen (8) Determine short term bending momentMo (9 Determine long term bending moment M (10) Determine direct and flexural tensile strengths of concrete () Determine the area of steel required for the calculated M 12 Arrange the steel bars appropriately and determine the e/e distance between bars (13 Determine the gross second moment of area of the cross-section I (14) Determine the cracked second moment of area of the cross-section (15) Determine the cracking moment M (16 Determine steel stresses at serviceability stage (17) Check if the steel stresses in (16) satisfy 0.3mm crack width intended consistent with CI. 8.6.22, AS3700 (2018) (18) Determine crack spacing (19) Determine crack width and check if it is lower than 0.3mm. If not, why not and how will you ensure crack width does not exceed 0.3mm? Select allowable limit of deflection from CI. 2.3.2, AS3700 (2018) Calculate deflection of beam and check if it is less than allowable; if not, suggest method for improvement (20) (21) (22) Calculate design shear force and determine the ultimate shear capacity required from the cross section dimensions and strength of concrete (23) Determine Vuman and comment on the potential safety of beam to shear (24) Design required stirrups (25) Show detailed sketches suitable for the construction engineer
0 0
Add a comment Improve this question Transcribed image text
Answer #1

E I 34 2Y 3 G r

Add a comment
Know the answer?
Add Answer to:
PROBLEM Authorities of the Atherton Tablelands in North Queensland proposes a glass covered 3m long walkway scenic lookout to cater for tourists. The glass panels are to be attached to an aluminium f...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Problem 1 Reinforced Concrete T-Flanged Sections (50 pts.) You are required to analyze and design...

    Problem 1 Reinforced Concrete T-Flanged Sections (50 pts.) You are required to analyze and design the propped cantilever t-section from HM 4 but for shear only. Draw shear V and moment M diagrams for uniformly distributed load throughout the 30ft span and equally concentrated loads at 10ft and 30ft. Recall that the connection at the left joint N1 is fixed. The connection at 20ft N3 is a roller. The right end node N2 is a free end. Use a concrete...

  • Problem 1 Reinforced Concrete T-Flanged Sections (50 pts.) You are required to analyze and design...

    Problem 1 Reinforced Concrete T-Flanged Sections (50 pts.) You are required to analyze and design the propped cantilever t-section from HM 4 but for shear only. Draw shear V and moment M diagrams for uniformly distributed load throughout the 30ft span and equally concentrated loads at 10ft and 30ft. Recall that the connection at the left joint N1 is fixed. The connection at 20ft N3 is a roller. The right end node N2 is a free end. Usea concrete compressive...

  • The following figure 1(a) shows a part of a reinforced concrete building in a school. The...

    The following figure 1(a) shows a part of a reinforced concrete building in a school. The structure consists of precast concrete hollow slabs that rests on the 10.8m long two reinforced concrete beams. The beams are supported on reinforced concrete columns. It is given that, on the top surface of the hollow slab, there will be a concrete screed with 50 mm thickness (assume density of concrete screed is 25 kN/m). In addition, there will be tiles that weigh 0.05...

  • i have also attached the solutions. could you please explain step by step what they are...

    i have also attached the solutions. could you please explain step by step what they are doing. especially the bit in part (a) where they do x/d Question 2 Picture it. It's 5 o'clock on Friday and at the end of a long week all Dave wants to do is go home. But his boss has other ideas; he tells Dave that he can go once he has designed the tension reinforcement for the beam in Figure 2. a) Design...

  • "Annexure B" ASSIGNMENT 2 DESIGN BRIEF Due to increasing pedestrian traffic of students travelling from halls of residence to the engineering block at one of its devised a...

    "Annexure B" ASSIGNMENT 2 DESIGN BRIEF Due to increasing pedestrian traffic of students travelling from halls of residence to the engineering block at one of its devised a plan, which includes a new means of crossing a busy road safely and without causing traffic delay. A solution to protect student safety for crossing the busy road is to design and build a pedestrian bridge. This will eliminate traffic congestion and delays as well as eliminate conflict between pedestrians and motorists....

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT