Ans. | Percentage of Machining cost assigned = Assigned overhead cost / Total overhead cost * 100 | |||||
Product Y | $180,090 / $227,700 * 100 | 79.09% | ||||
Product Z | $47,610 / $227,700 * 100 | 20.91% | ||||
*WORKING NOTES: | ||||||
*Calculations for Activity rate: | ||||||
Activity | Overhead cost | Expected activity | Activity rate | |||
( A) | (B) | (A / B) | ||||
Machining | $227,700 | 11000 | $20.70 | per MH | ||
*Calculations for overhead cost assigned: | ||||||
Product Y | Product Z | |||||
Activity rate (a) | Actual activity (b) | Overhead assigned (a*b) | Actual activity © | Overhead assigned (a*c) | ||
Machining | $20.70 per MH | 8700 | $180,090 | 2300 | $47,610 | |
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Expected Activity 11,000 MHs Activity Cost Pool Machining Machine setups Production design...
Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Expected Activity Activity Cost Pool Machining Machine setups Production design General factory...
Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Cost s 221,100 Expected ActivitY Activity Cost Pool Machining Machine setups Production...
Greenwood Company manufactures two products -15,000 units of Product Y and 7,000 units of Product Z The company uses a plantwide overhead rate based on direct labor hours. It is considering implementing an activity based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours...
Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Expected ActivitY Activity Measure Machine-hours Number of setups Number of products Direct...