Question

Assessment 7.0: S&C layouts Produce a report (500 words min) on the operation of S&C layouts, use photographs of operational

alos need minimum 4 failure of S& C
0 0
Add a comment Improve this question Transcribed image text
Answer #1

91.2.1 Components utilised in :

a) construction of switch :

- A pair of stock rails

- A pair of tongue rails

- Toe and heel

- gauge tie plates

- A number of slide chairs

- two or more stretcher bars

b) construction of crossing system :

- 2 rails point rail and splice rail are joined

- wing rails and a pair of check rails

- Point rail with Blunt nose

- V rail with 6 mm depth

Construction using the design elements as stated :

Point and Crossings are peculiar arrangement used in permanent way (railway track) to guide the vehicle for directional change. Broadly point and crossing assembly consists of three main components namely Point, Lead and Crossing element. A point consists of one pair of tongue rails and Stock Rails with necessary fittings.Crossing is a device in the form of V-piece introduced in the track to permit movement of wheel flange at the inter section of two running lines.It has gap over which the wheel tread jumps.The track portion between point and crossing is is called lead.

The points and crossing are the vital components of track asset; necessary for diversion of traffic from one track to another track, such diversion may be necessitated for giving precedence to faster trains in the same direction, giving passage to a train moving in the opposite direction or for connecting places not on the direct line of track. Hence the design, laying and maintenance of the points and crossing have a significant influence throughout the section.

Constituents of the points and crossing The switch assembly, the crossing assembly and the lead portion beyond the turnout, turn-in- curve is also important assembly

Type of switch

- Stub switch

- Split switch

Types of crossings :

1. Special class level crossing.

2. Class “A” level crossing.

3. Class “B” level crossing.

4. Class “C” level crossing.

5. Class “D” level crossing.

Add a comment
Know the answer?
Add Answer to:
alos need minimum 4 failure of S& C Assessment 7.0: S&C layouts Produce a report (500 words min) on the o...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • explain Failure mode of S&C need about 4 failure uiul ol the turve. A1so use manual methods to measure the c...

    explain Failure mode of S&C need about 4 failure uiul ol the turve. A1so use manual methods to measure the cant deficiency of a curve. Assessment 7.0: S&C layouts Produce a report (500 words min) on the operation of S&C layouts, using photographs of operational layouts, and identify a range of components used in S&C layouts, for a range of different situations. The report should reference the engineering stand ident ards applicable to the Switch and crossing layouts ified in...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

  • What an Executive Summary Is An executive summary is a specific type of document that does...

    What an Executive Summary Is An executive summary is a specific type of document that does two things: it summarizes a research article, and it offers recommendations as to how information from the article can be used. Some long reports can contain an executive summary section, as indicated in the Pearson handbook. Write a 2 pahe Executive Summary In business contexts, an executive summary is always written for a specific purpose: to explain the information in the article to a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT