91.2.1 Components utilised in :
a) construction of switch :
- A pair of stock rails
- A pair of tongue rails
- Toe and heel
- gauge tie plates
- A number of slide chairs
- two or more stretcher bars
b) construction of crossing system :
- 2 rails point rail and splice rail are joined
- wing rails and a pair of check rails
- Point rail with Blunt nose
- V rail with 6 mm depth
Construction using the design elements as stated :
Point and Crossings are peculiar arrangement used in permanent way (railway track) to guide the vehicle for directional change. Broadly point and crossing assembly consists of three main components namely Point, Lead and Crossing element. A point consists of one pair of tongue rails and Stock Rails with necessary fittings.Crossing is a device in the form of V-piece introduced in the track to permit movement of wheel flange at the inter section of two running lines.It has gap over which the wheel tread jumps.The track portion between point and crossing is is called lead.
The points and crossing are the vital components of track asset; necessary for diversion of traffic from one track to another track, such diversion may be necessitated for giving precedence to faster trains in the same direction, giving passage to a train moving in the opposite direction or for connecting places not on the direct line of track. Hence the design, laying and maintenance of the points and crossing have a significant influence throughout the section.
Constituents of the points and crossing The switch assembly, the crossing assembly and the lead portion beyond the turnout, turn-in- curve is also important assembly
Type of switch
- Stub switch
- Split switch
Types of crossings :
1. Special class level crossing.
2. Class “A” level crossing.
3. Class “B” level crossing.
4. Class “C” level crossing.
5. Class “D” level crossing.
alos need minimum 4 failure of S& C Assessment 7.0: S&C layouts Produce a report (500 words min) on the o...
explain Failure mode of S&C
need about 4 failure
uiul ol the turve. A1so use manual methods to measure the cant deficiency of a curve. Assessment 7.0: S&C layouts Produce a report (500 words min) on the operation of S&C layouts, using photographs of operational layouts, and identify a range of components used in S&C layouts, for a range of different situations. The report should reference the engineering stand ident ards applicable to the Switch and crossing layouts ified in...
How can we assess whether a project is a success or a
failure?
This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...
10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...
What an Executive Summary Is
An executive summary is a specific type of document that does
two things: it summarizes a research article, and it offers
recommendations as to how information from the article can be
used.
Some long reports can contain an executive summary section, as
indicated in the Pearson handbook.
Write a 2 pahe Executive Summary
In business contexts, an executive summary is always written
for a specific purpose: to explain the information in the article
to a...