Question

. The production manager at Sunny Soda, Inc., is interested in tracking the quality of the companys 12-ounce bottle filling

0 0
Add a comment Improve this question Transcribed image text
Answer #1
Bottle
Sample 1 2 3 4 X-bar Range
1 12.02 11.93 11.95 11.9 11.95 0.12
2 11.91 11.94 11.92 12.08 11.96 0.17
3 11.93 12.04 12.1 11.88 11.99 0.22
4 11.98 12.01 11.98 12.07 12.01 0.09
5 12.12 11.94 11.95 12.12 12.03 0.18
6 12.12 11.97 12.06 11.93 12.02 0.19
7 11.91 12.05 11.89 11.94 11.95 0.16
8 12.06 11.9 11.9 12.09 11.99 0.19
9 11.89 12.04 12.01 12.09 12.01 0.20
10 12.06 11.95 11.96 11.88 11.96 0.18
11 12.09 12.12 11.98 12.08 12.07 0.14
12 12.07 12.02 11.91 12.05 12.01 0.16
13 11.95 11.98 12.12 11.98 12.01 0.17
14 11.91 12.04 11.94 12.11 12.00 0.20
15 11.97 12.11 11.98 11.99 12.01 0.14
Averages 11.998 0.167
X_double-bar R-bar

For sample size n = 4,A2 = 0.729, D3 = 0, and D4 = 2.282

UCLR = D4 * R_bar = 2.282 * 0.167 = 0.382
LCLR = D3 * R_bar = 0 * 0.167 = 0

UCLX = X_double-bar + A2 * R_bar = 11.998 + 0.729*0.167 = 12.120
LCLX = X_double-bar - A2 * R_bar = 11.998 - 0.729*0.167 = 11.876

a.

Process averages are in control. Process ranges are also in control.

b.

Estimate for process stdev = A2 * R_bar * √n / 3 = 0.729*0.167*√4 / 3 = 0.081

Cpu = (USL - mean) / 3.stdev = (12.10 - 11.998) / (3*0.081) = 0.420
Cpl = (mean - LSL) / 3.stdev = (11.998 - 11.90) / (3*0.081) = 0.402

So, Cpk = Min(Cpu, Cpl) = 0.402 and the process is not capable.

Add a comment
Know the answer?
Add Answer to:
. The production manager at Sunny Soda, Inc., is interested in tracking the quality of the company's 12-ounce bottl...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The production manager at Sunny Soda, Inc. is interested in tracking the quality of the company’s...

    The production manager at Sunny Soda, Inc. is interested in tracking the quality of the company’s 12-ounce bottle filling line. The bottles must be filled within the tolerances set for this product because the dietary information on the label shows 12 ounces as the serving size. The design standard for the product calls for a fill level of 12.00 ± 0.10 ounces (11.90 to 12.10 ounces). The manager collected the following sample data (in fluid ounces per bottle) on the...

  • 3. The production manager at Sunny Soda, Inc, is interested in tracking the quality of the...

    3. The production manager at Sunny Soda, Inc, is interested in tracking the quality of the y's 12 -ounces bottle filling line. The bottles must be filled within the tolerances set compan for the dietary information on the label shows 12 ounces as the serving size. The design standard for the product calls for a fill level of 12.00+ 0.10 ounces. The manage collected the following sample data (in fluid ounces per bottle) on the production process: A2 0.729, D,-0.0,...

  • please answer number 24 part A and for part B answer it in equation form, not...

    please answer number 24 part A and for part B answer it in equation form, not graph. thank you. Process Capability Sample 24. The production manager at Sunny Soda, Inc. is inter- ested in tracking the quality of the company's 12-ounce bottle filling line. The bottles must be filled within the tolerances set for this product because the dietary information on the label shows 12 ounces as the serving size. The design standard for the product calls for a fill...

  • Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can...

    Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturing processes. In one particular application, a client gave Quality Associates a sample of 800 observations taken during a time in which that client’s process was operating satisfactorily. The sample standard deviation for these data was .21; hence, with so much data, the population standard deviation was assumed to be .21. Quality Associates then suggested that random samples of...

  • Case Problem 1: Quality Associates, Inc.

    Quality Associates, Inc., a consulting firm, advises its clients about sampling and statistical procedures that can be used to control their manufacturingprocesses. IN one particular application, a client game quality associates a sample of 800 observations taken during a time in which that client's process wasoperating satisfactorily. The sample standard deviation for there data was .21 ; hence, with so much data, the population standard deviation was assumed to be .21.Quality associates then suggested that random samples of size 30...

  • Sample 1|Sample 2 Sample 3 Sample 4 11.91 11.55 11.62 11.62 11.69 11.52 11.59 11.75 11.82 1.90 11...

    Sample 1|Sample 2 Sample 3 Sample 4 11.91 11.55 11.62 11.62 11.69 11.52 11.59 11.75 11.82 1.90 11.97 11.64 11.80 11.87 12.03 11.94 12.01 11.92 11.99 12.13 12.09 12.16 11.93 12.21 12.32 12.39 11.93 11.85 11.92 11.7611.83 11.7012.38 11.77 11 12.00 12.07 12.04 11.98 12.05 12.30 12.37 12.18 12.25 11.97 12.17 12.24 11.85 11.92 12.30 12.37 12.15 12.22 12.02 11.36 12.02 11.75 12.05 11.95 12.18 12.14 11.72 12.07 12.05 11.85 11.64 12.16 12.39 11.65 12.11 11.90 12.22 11.56 11.88 11.95...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT