Question

EXCEL SOLVER: A gold processor has two sources of gold ore, source A and source B. In order to keep his plant running, a...

EXCEL SOLVER: A gold processor has two sources of gold ore, source A and source B. In order to keep his plant running, at least three tons of ore must be processed each day. Ore from source A costs $20 per ton to process, and ore from source B costs $10 per ton to process. Costs must be kept to less than $80 per day. Moreover, Federal Regulations require that the amount of ore from source B cannot exceed twice the amount of ore from source A. If ore from source A yields 2 oz. of gold per ton, and ore from source B yields 3 oz. of gold per ton, how many tons of ore from both sources must be processed each day to maximize the amount of gold extracted subject to the above constraints? NEED TO ANSWER IN EXCEL SOLVER NEED HELP PLEASE

0 0
Add a comment Improve this question Transcribed image text
Answer #1

IF YOU HAVE ANY DOUBTS COMMENT BELOW I WILL BE TTHERE TO HELP YOU..ALL THE BEST..

Assume that we get x tons of source A and y tons of source B (perday)
obviously: x0 and y0
the cost : C=20x+10y 80
given condition : y2x
we need to maximize the amount of gold extracted : S=2x+3y
we graph:

y2x A 20x+10 CO

the region of (x,y) is the region in triangle ABC where A,B,C arethe critical points
A(0,0) ,B(2,4) ,C(4,0)
the maximize occur at certain critical point so we can substitute:
S(A)= 0    ;S(B)=16 ;S(C)=8 (B is theintersection of y=2x and 20x+10y=80)
=> S maximize at B,when x=2 and y=4
so one day,he should process 2 tons of source A and 4 tons ofsource B to get maximum is 16 oz. of goal .

I HOPE YOU UNDERSTAND..

PLS RATE THUMBS UP..ITS HELPS ME ALOT..

THANK YOU...!!

Add a comment
Know the answer?
Add Answer to:
EXCEL SOLVER: A gold processor has two sources of gold ore, source A and source B. In order to keep his plant running, a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A gold processor has three sources of gold ore, Alaska California, and Utah. Table below shows...

    A gold processor has three sources of gold ore, Alaska California, and Utah. Table below shows gold ore details: (20 points) Alaska California Utah Cost per ton [$] $180 $120 $100 Gold content [g/ton] 4 3.5 3.2 Processing time [min/ton] 7 5 5 The gold processor wants to maximize its gold production. The processing plant works from 8:00 to 20:00. The gold processor can spend $14,000 per day in raw materials. California environmental regulations limit daily ore material extraction to...

  • A wine manufacturer can source its grapes from two vineyards: vineyard A and vineyard B. Grapes...

    A wine manufacturer can source its grapes from two vineyards: vineyard A and vineyard B. Grapes from vineyard A costs $5 per ton to process, and grapes from vineyard B costs $10 per ton to process. Costs must be kept to less than $80 per day. A previous contract with the vineyards require that the amount of grapes sourced from vineyard B cannot exceed twice the amount of grapes from vineyard A. In order to keep his plant running, the...

  • Solve the following LP problems using the Solver in MS Excel. Q1.      A candy manufacturer has...

    Solve the following LP problems using the Solver in MS Excel. Q1.      A candy manufacturer has 130 pounds of chocolate-covered cherries and 170 pounds of chocolate-covered mints in stock. He decides to sell them in the form of two different mixtures. One mixture will contain half cherries and half mints by weight and will sell for $2.00 per pound. The other mixture will contain one-third cherries and two-thirds mints by weight and will sell for $1.25 per pound. How many...

  • The Surest Concrete Company produces cement in a continuous process.  Two ingredients in the cement are sand,...

    The Surest Concrete Company produces cement in a continuous process.  Two ingredients in the cement are sand, which Surest purchases for $8 per ton, and gravel, which costs $10 per ton.  The other ingredients are lumped together and referred to as “Other”. The cost of the other ingredients is $7 per ton. No more than 40 percent of the cement can be sand, and at least 30 percent of the cement must be gravel.  The maximum amount of gravel available is 100 tons.  The...

  • Please show ALL EXCEL FORMULAS! BETHESDA MINING COMPANY Bethesda Mining is a midsized coal mining company...

    Please show ALL EXCEL FORMULAS! BETHESDA MINING COMPANY Bethesda Mining is a midsized coal mining company with 20 mines located in Ohio, Pennsylvania, West Virginia, and Kentucky. The company operates deep mines as well as strip mines. Most of the coal mined is sold under contract, with excess production sold on the spot market. The coal mining industry, especially high-sulfur coal operations such as Bethesda, has been hard-hit by environmental regulations. Recently, however, a combination of increased demand for coal...

  • (Blending & Refining LP optimization problem) American Oil of Middle East has a refinery in Kuwait....

    (Blending & Refining LP optimization problem) American Oil of Middle East has a refinery in Kuwait. This refinery has access to two types of crude oils that come from Wafra Field: Ratawi Crude and Eocene Crude. The daily availability for Ratawi Crude and Eocene Crude are 300,000 bbl per day and 200,000 bbl per day, respectively. The Ratawi Crude costs the company $15 per bbl, and the Eocene Crude costs $20 per bbl. The refinery distills the crude oils and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT