The Model F extender fits with the 2 inch heavy duty hitches.
The contract calls for 201 Model F extenders per week to be delivered in equal installments over the 16 weeks of the contract. The goal of Alpha Assemblies is to work 40 hours per week. The actual work time for completing the Model F extenders has been broken down by process in the table below. Also provided is the anticipated learning rate for each process. All processes must be performed in sequence and each step has its own separate and unique workcenter. To achieve the goal of working 40 hours per week or less, the cycle time must be lower than the takt time.
Process | Time Required per Unit | Predecessor Task | Learning Rate |
A | 10 | 88 | |
B | 11 | A | 87 |
C | 18 | B | 86 |
D | 9 | C | 82 |
E | 15 | D | 84 |
F | 8 | E | 81 |
G | 9 | F | 84 |
H | 16 | G | 85 |
I | 10 | H | 86 |
Part of the answer:
Process |
Time Required per Unit | Predecessor Task | Learning Rate | Minutes(week2) | Minutes(week4) | Minutes(week8) | Minutes(week16) |
A | 10 | 88% | 8.8 | 7.744 | 6.81472 | 5.996954 | |
B | 11 | A | 87% | 9.57 | 8.3259 | 7.243533 | 6.301874 |
C | 18 | B | 86% | 15.48 | 13.3128 | 11.449008 | 9.846147 |
D | 9 | C | 82% | 7.38 | 6.0516 | 4.962312 | 4.069096 |
E | 15 | D | 84% | 12.6 | 10.584 | 8.89056 | 7.46807 |
F | 8 | E | 81% | 6.48 | 5.2488 | 4.251528 | 3.443738 |
G | 9 | F | 84% | 7.56 | 6.3504 | 5.334336 | 4.480842 |
H | 16 | G | 85% | 13.6 | 11.56 | 9.826 | 8.3521 |
I | 10 | H | 86% | 8.6 | 7.396 | 6.36056 | 5.470082 |
For week 16 how much better (lower so answer will be positive) or worse (higher so answer will be negative) is the cycle time for Model F than the takt time? Note: learning is applied to the batch quantity per week. Do not try to break out the units within a week.
Hint: The answer is 2.0942
Cycle Time = Bottleneck of Activity for Week16
Cycle Time = 9.846147 minute (since it has the largest activity time)
Demand Per Week = 201
Available Time per week = 40*6 = 2400 minutes
Takt Time = Available Time Per Week/Demand PEr Week
Takt Time = 2400/201
Takt Time = 11.9403
Cycle Time lower than the Takt Time
Difference = 11.9403 - 9.846147
Difference = 2.094152
Difference = 2.0942 minutes
The Model F extender fits with the 2 inch heavy duty hitches. The contract calls for...
You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units over two eight-hour shifts - 16 hours. Task times and precedence relationships are shown in the table below: Task Predecessor Time (minutes) A -- 2 B A 4 C 7 D A, B 11 E C 9 F D 10 G E, F 7 H D, G 4 What is the cycle time in minutes? What is the theoretical number of...
Problem Statement: A factory producing the new COVID-19 at-home testing kits is determining how to best line balance their production process. There are 12 steps to the production process, and they are presented below, along with their predecessors and how long it takes to complete each task. Assume all times are in minutes. This facility operates for 7 hours per day. Task C D E F G H I J K L A B Nil A B B B B...
all the answers must be done please help and codes should be done in matlab Part C (Based off week 12 workshop content Sinee the implementation of the CityCyele scheme in October 2010, the Bris bane council has recorded the mamber of City Cycle trips every month The results are available in the CityCycleData.cov' fie on Blackboard 1. Import the data into MATLAB using the cavread fuaction, and the visualise the data with the scatter function Coenment on whether a...
a) Find the multiple regression equation using all three explanatory variables. Assume that X1 is mid-term score, X2 is hours studying per week and x3 is hours watching television per week. Give your answers to 3 decimal places. û = mid-term score + hours studying + hours watching television + b) At a level of significance of 0.05, the result of the F test for this model is that the null hypothesis rejected. c) The explanatory variable that is most...
What is the relationship between the price of crude oil and the price you pay at the pump for gasoline? The accompanying table shows the prices of crude oil and the price you pay at the pump for 24 consecutive months. Complete parts (a) through (h) below. Month Crude_Oil Gasoline 1 75 1.858 2 76 1.477 3 75 1.372 4 76 1.204 5 75 2.344 6 75 2.424 7 78 1.399 8 81 1.296 9 74 1.496 10 79 1.196...
Problem 2 In a process development study on yield, four factors were studied, each at two levels: time (A), concentration (B), pressure (C), and temperature (D). A single replicate of a 2 design was run and the resulting data are shown in the following table Yield (Ibs) 67 128 86 134 97 92 132 128 81 159 114 163 93 109 122 140 Actual Run Order 9 12 13 14 15 10 16 The factor level settings are as follows...
Game_Number Winner Loser Duration 1 Jens Sven 41 2 Sven Jens 76 3 Sven Jens 156 4 Sven Jens 151 5 Sven Jens 105 6 Jens Sven 71 7 Sven Jens 123 8 Sven Jens 111 9 Sven Jens 164 10 Sven Jens 116 11 Jens Sven 46 12 Sven Jens 88 13 Jens Sven 59 14 Jens Sven 47 15 Jens Sven 57 16 Sven Jens 108 17 Sven Jens 78 18 Sven Jens 94 19 Jens Sven 86...
AutoSave O ABC Project - Protected View Search File Home Insert Draw Page Layout Formulas Data Review Help PROTECTED VIEW Be careful--files from the Internet can contain viruses. Unless you need to edit, it's safer to stay in Protected View. View Enable Editing B16 f 40000 G H J A B С E F 1 Quality Upholstery Company estimated the following costs and activities for its two products, stools and pads for 2018: 2 3 Cost Activity 4 Direct Materials...
Transistor Manufacturing Study: A transistor manufacturer conducted an experiment to investigate the effects of three factors on PRODUCTivity (measured in thousands of dollars of items produced) per 40-hour week. The factors were as follows: Length of work week in DAYS (two levels): Five consecutive 8-hour days or four consecutive 10-hour days SHIFT (two levels): day or evening shift Number of coffee BREAKS (three levels): 0, 1, or 2 The experiment was conducted over a 24-week period with the 2 ×...
M5 Assignment (30 points) Help with J, K, I and M please! General instruction: Complete the guided Practice Problem first, if you have not done so. It will help you become proficient in answering the questions in this assignment. Check out the module, Assignment Guides, which demonstrates how to show the math/process work and provides instruction on essential procedures in Word and Excel, and APA formatting examples. Use this Word document to fill in the answers to the questions. You...