Problem

Using the pumps given in Table 13-1, design a screw pump system for the village of Fishk...

Using the pumps given in Table 13-1, design a screw pump system for the village of Fishkill using the following assumptions:

Interceptor sewer

Minimum sewage elevation = 112.60 m

Maximum sewage elevation = 112.80 m

Discharge elevation to stilling well = 116.40 m

Average flow at design life = 8,600 m3/d

Peaking factor for peak hour = 2.8

Ratio factor for minimum flow at beginning of design life = 0.49

Complete the design by providing the following: pump specifications (diameter, number of flights), number of pumps, and a sketch of the plan view with dimensions (assume the width of each pump equals the diameter of the screw plus 0.6 m).

Table 13-1

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 13