Using a spreadsheet program you have written, compute and plot the unequalized and the equalized hourly BOD mass loadings to the Metuchen WWTP ( Problem 13-19 ). Determine the following ratios for BOD mass loading: peak to average, minimum to average, peak to minimum.
Problem 13-19
A treatment plant being designed for Metuchen requires an equalization basin to even out flow and BOD variations. The following flows and BOD5 have been found to be typical of the average variation over a day. What volume of equalization basin is required to provide for a uniform outflow equal to the average daily flow? Assume the flows are hourly averages and that an addition of 25% to the estimated volume will be provided to account for contingencies.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.