Problem

Continuing the design of preliminary treatment facilities for the town of Pigeonroost’s...

Continuing the design of preliminary treatment facilities for the town of Pigeonroost’s WWTP ( Problem 13-1 ), design an aerated grit chamber. Use Albrecht’s equation and assume a slot velocity of ≤ 0.15 m/s is required to achieve removal of the design SES. Assume the sewers are separated and use a worst case situation for the design of the grit channel. To complete the design, specify the air supply rate and provide a sketch of the cross section with dimensions.

Problem 13-1

Using the pumps given in Table 13-1, design a screw pump system for the town of Pigeonroost using the following assumptions:

Complete the design by providing the following: pump specifications (diameter, number of flights), number of pumps, and a sketch of the plan view with dimensions (assume the width of each pump equals the diameter of the screw plus 0.6 m).

Table 13-1

Step-by-Step Solution

Request Professional Solution

Request Solution!

We need at least 10 more requests to produce the solution.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the solution will be notified once they are available.
Add your Solution
Textbook Solutions and Answers Search
Solutions For Problems in Chapter 13