A hydroelectric power plant has a dam that holds the water back 100 m above the downstream water level. If the flowrate of water through the plant is 80 m3/s, plot the power generated as a function of the efficiency of the genset (turbine plus electric generator combination). Discuss the economic analysis that would have to be done to determine the optimum genset to buy.
We need at least 10 more requests to produce the solution.
0 / 10 have requested this problem solution
The more requests, the faster the answer.