2. Selected data about Pitkin Company's manufacturing operations at two levels of activity are presented below:...
Crosshill Company's total overhead costs at various levels of activity are presented below. chine Total Month April May 19.000 39.000 59.000 69.000 $191, 360 164.560 $236.200 July Assume that the overhead cost above consists of utilities, supervisory salaties, and maintenance The breakdown of these costs at the 39,000-machine-hour level of activity in May is as follows: DELL) Super Scries te $ nes $2.500 43.000 59.06 16. The company wants to break down the maintenance cost into ts variable and feed...
Two-Stage ABC for Manufacturing Detroit Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity Cost Pool Activity Cost Activity Cost Driver Machine setup $720,000 12,000 setup hours Material handling 120,000 3,000 material moves Machine operation 680,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts during the month of August: C23 Cams U2 Shafts...
Azion Manufacturing is a company that produces two types of cleaning detergents, Sunny Clear and Rosy Nice. Previously, Azion Manufacturing used single rate/ traditional costing system in computing its product overhead costs. Mr. Yeong, the newly appointed Chief Finance Manager decides to implement the Activity- Based Costing (ABC) system starting this year in computing the product costs. Below is the information gathered relates to the cost production of 40,000 units of Sunny Clear Detergent and 50,000 units of Rosy Nice...
Crosshill Company's total overhead costs at various levels of activity are presented below. Month pril May Machine Hours 19,000 39,000 59,000 69.000 Total Overhead Cost $191,860 $164,460 $219, 260 $246,660 July Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 39,000 machine-hour level of activity in May is as follows: Utilities variable) Supervisory salaries (fixed) Maintenance mixed) 62.400 43.000 59,060 nces Total overhead coat $164.960 The company wants to...
Crosshill Company's total overhead costs at various levels of activity are presented below: Month April May June July Machine- Hours 52,000 42,000 62,000 72,000 Total Overhead Cost $204,360 $180,060 $228,660 $252,960 Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 42,000-machine-hour level of activity in May is as follows: $ Utilities (variable) Supervisory salaries (fixed) Maintenance (mixed) 54,600 60,000 65,460 Total overhead cost $ 180,060 The company wants to...
2-Golden Company's total overhead cost at various levels of activity are presented below: Total Overhead Cost $194,000 $170,200 $217,800 $241,600 Month Machine Hours March 50,000 40,000 60,000 70,000 April May June Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 40,000 machine-hour level of activity is as follows: $52,000 Utilities (variable) Supervisory Salaries (fixed) $60,000 Maintenance (mixed) $58,200 $170,200 Total Overhead Cost A-Estimate how much of the $241,600 overhead...
Nova Company's total overhead cost at various levels of activity are presented below: Total Machine- Overhead Hours 45,000 35,000 55,000 65,000 Month Cost S 185,650 $ 160,350 $ 210,950 $ 236,250 April May June July Assume that the total overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 35,000 machine-hour level of activity is: $ 45,500 54,000 60,850 $160,350 Utilities (variable) Supervisory salaries (fixed) Maintenance (mixed) Total overhead cost Nova Company's management...
Crosshill Company's total overhead costs at various levels of activity are presented below: Month April May Machine- Hours 49,000 39,000 59,000 69,000 Total Overhead Cost $210,730 $186,030 $ 235, 430 $260,130 June July Assume that the overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 39,000-machine-hour level of activity in May is as follows: $ Utilities (variable) Supervisory salaries (fixed) Maintenance (mixed) 50, 700 70,000 65,330 Total overhead cost $ 186,030 The...
Laughing Strange Aussie Limited produces a single product -premium wool Ugg boots. Variable manufacturing overhead is applied to products based on direct machine-hours. The standard costs for one unit of product are as follows: Direct Material: 16 metres at $3.25 per metre Direct Labour 6 hours at $19.00 per hour Variable Manufacturing Overhead: 4 machine-hours at $12.00 per hour Total Standard Variable Cost Per Unit $52.00 $114.00 $48.00 $214.00 During the month of May, 64,880 units were produced. The actual...
Two-Stage ABC for Manufacturing Detroit Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity Cost Pool Activity Cost Activity Cost Driver Machine setup $600,000 12,000 setup hours Material handling 120,000 2,000 material moves Machine operation 500,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts during the month of August: C23 Cams U2 Shafts...