Question

View History Bookmarks Window Help A Manager Accu Chapter 4 Problem Set 1 er 4 Mergell Ace The Real Wagent Problem Set 6 Requ first time using this, not sure what information im supposed to put on here, but im stuck on this.
0 0
Add a comment Improve this question Transcribed image text
Answer #1
Activity cost pool Activity Measure Estimated Overhead cost Estimated Activity Cost per activity
Machining Machine hours                                   2,00,000 10000 MHs                                              20
Machine setups Number of setups                                   1,00,000 200 setups                                            500
Product designs Number of products                                       84,000 2 products                                       42,000
General Factory Direct labor hours                                   3,00,000 12000 DLH                                              25
Activity Measure Product Y Overhead cost
Machining 8000                                   1,60,000
Number of setups 40                                       20,000
Number of products 1                                       42,000
Direct labor hours 9000                                   2,25,000
Total manufacturing overheads                                   4,47,000
Hi mate,
I would be grateful to you if you can provide a thumbs up and write one beautiful comment. It will improve my rating and let me continue my journey here.
In case of doubt, please comment. I will consider myself fortunate if I can help you.
All the best for your bright future.
Add a comment
Know the answer?
Add Answer to:
first time using this, not sure what information im supposed to put on here, but im...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product...

    Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Cost s 221,100 Expected ActivitY Activity Cost Pool Machining Machine setups Production...

  • Required information Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units of Product...

    Required information Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...

  • A. using the abc system, how much total manufacturing overhead cost would be assigned to product...

    A. using the abc system, how much total manufacturing overhead cost would be assigned to product Y? B. Using ABC system, how mych total manufacturing overhead cost woykd be assigned to product Z? C.using the plabtwide iverhead rate, what percentage if the total overbead cost is allocated to product Y and product Z? D. Using ABC system, what percebtage if the machining costs is assigned to product Y and product Z? E. what percentage if machine setups cost is assigned...

  • iment Saved Required information Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units...

    iment Saved Required information Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Expected Activity Overhead Activity Cost Pool Machining Machine setups Production design...

  • Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z...

    Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...

  • Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7000 units of Product Z....

    Required information Greenwood Company manufactures two products—15,000 units of Product Y and 7000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...

  • Required information Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product...

    Required information Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...

  • Required information Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product...

    Required information Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number...

  • Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product...

    Required information Greenwood Company manufactures two products-15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z Estimated Overhead Expected Activity 11,000 MHs Activity Cost Pool Machining Machine setups Production design...

  • Chapter 4 Assignment i Saved Required information Greenwood Company manufactures two products-14,000 units of Product Y...

    Chapter 4 Assignment i Saved Required information Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT