Listed below are eight components of the total cost of quality. In the spaceprovided identify each as a cost of prevention, appraisal, internal failure, or extemal failure 1. Product design 2. Product returns due to defects 3. Inspection of raw materials shipments 4. Employee training 5. Rework of defective units prior to shipment 6. Estimated lost sales due to poor quality 7. Warranty expense 8. Inspection of finished goods 9. Scrap

0 0
Add a comment Improve this question Transcribed image text
Answer #1

ANSWER:

  • In the given question we have to identify each cost into different categories of total cost of quality
  • We need to identify which cost is categorized under cost of prevention, appraisal, internal failure or external failure
  • Prevention cost is that cost which is incurred to prevent any abnormal cost in future
  • Appraisal cost is that cost which incurred in actual production process to retain quality of product
  • Internal Failure cost is that cost which incurred before actual shipment of product to customer
  • External Failure cost is that cost which incurred after actual sale of product
  • Thus, based on above categories, we can identify each given cost into following quality costs

Particulars

Type of Cost

1. Product design

Prevention Costs

2. Product returns due to defects

External Failure Costs

3. Inspection of raw material shipment

Appraisal Costs

4. Employee training

Prevention Costs

5. Rework of defective units prior to shipment

Internal Failure Costs

6. Estimated lost Sales due to poor quality

External Failure Costs

7. Warranty Expense

External Failure Costs

8. Inspection of Finished Goods

Appraisal Costs

9. Scarp

Internal Failure Costs

Add a comment
Know the answer?
Add Answer to:
Listed below are eight components of the total cost of quality. In the spaceprovided identify each...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The following represents the financial information for Domingo Corporation for two months. March April $360,000 Sales...

    The following represents the financial information for Domingo Corporation for two months. March April $360,000 Sales revenue $540,000 Costs $ 1,550 1,820 Process inspection 1,940 1,870 13,300 Scrap Quality training Warranty repairs Product testing equipment Customer complaints 20,600 4,300 6,700 2,500 16,000 15,100 6,400 9,800 4,800 7,500 3,100 20,000 9,400 4,700 Rework Preventive maintenance Materials inspection Field testing 13,500 Required: a. Classify these items into Prevention, Appraisal, Internal failure, or External failure costs. b. Calculate the ratio of the prevention,...

  • Required A Required B Calculate the ratio of the prevention, appraisal, internal failure, and external failure...

    Required A Required B Calculate the ratio of the prevention, appraisal, internal failure, and external failure costs to sales for March and April. (Enter your answers as a percentage rounded to 1 decimal place (i.e., 32.1).) March April Prevention Appraisal Internal failure External failure % % % % % % % % The following represents the financial information for Domingo Corporation for two months. March $515,000 April $440,000 Sales revenue Costs Process inspection Scrap Quality training Warranty repairs Product testing...

  • 1. A number of activities that are a part of a company's quality control system are...

    1. A number of activities that are a part of a company's quality control system are listed below. Classify the costs associated with each of these activities into one of the following categories: prevention cost, appraisal cost, internal failure cost, or external failure cost. Activities Cost a. Product testing. b. Product recalls c. Rework labor and overhead. d. Quality circles e. Downtime caused by defects f. Cost of field servicing 0 Inspection of goods h. Quality engineering Warranty repairs Statistical...

  • Learning Objective 52 Classifying quality costs and using these costs to make decisions Loiselle manufactures high-quality...

    Learning Objective 52 Classifying quality costs and using these costs to make decisions Loiselle manufactures high-quality speakers. Suppose Loiselle is considering spending he following amounts on a new quality program: 2. Total cost to underta $2,305,000 $ 625,000 Additional 20 minutes testing for each speaker Negotiating and training suppliers to obtain higher-quality materials and on-time delivery Redesigning the speakers to make them easier to manufacture 430,000 1,250,000 Loiselle expects this quality program to save costs as follows: Reduce warranty repair...

  • Charles Berkle is the manager of Nogain Manufacturing and is interested in doing a cost of...

    Charles Berkle is the manager of Nogain Manufacturing and is interested in doing a cost of quality analysis. The following cost and revenue data are available for the most recent year ended December 31: Charles Berkle is the manager of Nogain Manufacturing and is interested in doing a cost of quality analysis. The following cost and revenue data are available for the most recent year ended December 31 250,000 Sales revenue 140,000 Cost of goods solo Warranty expense Inspection costs...

  • a)Classify each of the following costs of quality as either a prevention cost, appraisal cost, internal...

    a)Classify each of the following costs of quality as either a prevention cost, appraisal cost, internal failure cost or external failure cost. . Heat testing each finished product $40,000/year Yearly maintenance on production equipment $20,000/year Inspection of Raw Materials $10,000/year Warranty Claims $50,000/year Production loss due to machine breakdowns $8,000/year Training Manufacturing Employees $15,000/year Losses of products destroyed in heat test $25,000/year b) Prepare a cost of Quality Report, listing The costs by category and including the percentage of total...

  • 6. Can you name products and services that in your opinion have relatively poor quality? Relatively...

    6. Can you name products and services that in your opinion have relatively poor quality? Relatively high quality? Are companies that provide better quality more successful? How can you tell? 8. What products have recently been recalled? Why? Check the U. S. Consumer Product Safety Commission website. 10. The following costs have been recorded Incoming materials inspection:    20,000 Training personnel:                         40,000 Warranty                                           45,000 Process planning:                            15,000 Scrap                                                  13,000 Quality Labs                                      30,000 Rework                                              25,000 Allowances                                       10,000 Complaints                                        14,000 What are...

  • Christianson Corp. manufactures radiation-shielding glass panels. (Click the icon to view the information.) Click the con...

    Christianson Corp. manufactures radiation-shielding glass panels. (Click the icon to view the information.) Click the con Requirements 1. Classify each item as a prevention cost, an appraisal cost an internal failure cost, or an external failure cost. 2. Should Christianson implement the new quality program? Give your reason internal fallure cost, Requirement 1. Classify each item as a prevention cost, an appraisal cost, an internal failure cost or an external failure cost Type of Quality Cost Strength testing one item...

  • pany using activity-based manavement identify cach of the following activities as (V) value-added or (N) nonvalue-added....

    pany using activity-based manavement identify cach of the following activities as (V) value-added or (N) nonvalue-added. (8 Points) 1. Designing car seats to maximize comfort. 2. Storing additional materials for future production 3. Special packaging of products for safety reasons. 4. Scrapping defective production materials. 5. Assembling lawn mowers at the local hardware store. 6. Moving parts from storage to the factory for manufacturing. 25. Theron Industries has the following financial data related to its quality control program. Initial raw...

  • Chapter 01 Problems Saved 5 1. A number of activities that are a part of a...

    Chapter 01 Problems Saved 5 1. A number of activities that are a part of a company's quality control system are listed below. Classify the costs associated with each of these activities into one of the following categories: prevention cost, appraisal cost, internal failure cost, or external failure cost. 5 points Activities Cost a. Product testing b. Product recalls. C. | Rework labor and overhead d. Quality circles e. Downtime caused by defects f. Cost of field servicing g. Inspection...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT