Question 19 1 pts Acme Manufacturing uses standard costing. Using the following data, calculate the Material...
Question 18 1 pts Acme Construction specializes in concrete work. Each job is a project and they rely heavily on part-time workers since project demand varies based on season, weather, and the number of projects to bid on. Based on supply and demand for laborer, the actual hourly pay varies throughout the year. Based on the previous years averages, the accounting department is using a standard value of $18 per hour for direct labor. On this project the number of...
Material and Labor Variances The following actual and standard cost data for direct material and direct labor relate to Jones Company's production of 2,000 units of a product: Actual Costs Standard Costs Direct material 4,200 lbs. @ $4.90 4,000 lbs. @ $5.10 Direct labor 5,800 hrs. @ $9.30 6,000 hrs. @ $9.50 Determine the following variances: Do not use negative signs with any of your answers, Next to each variance answer, select either "F" for Favorable or "U" for Unfavorable....
Material and Labor Variances The following actual and standard cost data for direct material and direct labor relate to the production of 2,000 units of a product: Actual Costs Standard Costs Direct material 7,800 lbs. @ $5.30 8,000 lbs. @ $5.10 Direct labor 12,400 hrs. @ $8.40 12,000 hrs. @ $8.70 Determine the following variances: Do not use negative signs with any of your answers. Next to each variance answer, select either "F" for Favorable or "U" for Unfavorable Materials...
Material and Labor Variances The following actual and standard cost data for direct material and direct labor relate to the production of 2,000 units of a product: Actual Costs Standard Costs Direct material 7,800 lbs. @ $5.30 8,000 lbs. @ $5.10 Direct labor 12,400 hrs. @ $8.40 12,000 hrs. @ $8.70 Determine the following variances: Do not use negative signs with any of your answers. Next to each variance answer, select either "F" for Favorable or "U" for Unfavorable. Materials...
Please assist with the inquiry below:
Material and Labor Variances The following actual and standard cost data for direct material and direct labor relate to Jones Company's production of 2,000 units of a product: Actual Costs Standard Costs Direct material 4,200 lbs. @ $4.90 4,000 lbs. @ $5.10 Direct labor 5,800 hrs. @ $9.30 6,000 hrs. @ $9.50 Determine the following variances: Do not use negative signs with any of your answers. Next to each variance answer, select either "F"...
All three pictures are one question and related ? Thank you
Instructions: Read the Problem Data and complete the calculations section. Enter data in the blue cells and formulas in the yellow cells. Gray cells require no entry. Problem Data XYZ Co. manufactures two products, Product A and Product B. Both products require Material 1 and Material 2. Plant information regarding standards follows. Standard per Case of product Std price per unit Product A Product B Material 1 (lbs) $...
Material, Labor, and Variable Overhead Variances The following summarized manufacturing data relate to Thomas Corporation's April operations, during which 2,000 finished units of product were produced. Normal monthly capacity is 1,100 direct labor hours. Standard Units Costs Total Actual Costs Direct material Standard (2 lb. @ $18.00/lb.) $36 Actual (4,200 lb. @ $19/lb.) $79,800 Direct labor Standard (0.5 hr. @ $33/hr.) $16.50 Actual (950 hrs. @ $32.20/hr.) 30,590 Variable overhead Standard (0.5 hr. @ $15/hr.) $7.50 Actual 15,450 Total $60...
Question text Material, Labor, and Variable Overhead Variances The following summarized manufacturing data relate to Thomas Corporation's April operations, during which 2,000 finished units of product were produced. Normal monthly capacity is 1,100 direct labor hours. Standard Units Costs Total Actual Costs Direct material Standard (2 lb. @ $17.00/lb.) $34 Actual (4,200 lb. @ $17.80/lb.) $74,760 Direct labor Standard (0.5 hr. @ $32/hr.) $16 Actual (950 hrs. @ $31/hr.) 29,450 Variable overhead Standard (0.5 hr. @ $14/hr.) $7 Actual -...
Material, Labor, and Variable Overhead Variances The following summarized manufacturing data relate to Thomas Corporation's April operations, during which 2,000 finished units of product were produced. Normal monthly capacity is 1,100 direct labor hours. Standard Units Costs Total Actual Costs $38 $83,160 $17 Direct material Standard (2 lb. @ $19.00/lb.) Actual (4,200 lb. @ $19.80/lb.) Direct labor Standard (0.5 hr. @ $34/hr.) Actual (950 hrs. @ $33.00/hr.) Variable overhead Standard (0.5 hr. @ $16/hr.) Actual Total 31,350 $8 16,450 $130,960...
Material, Labor, and Variable Overhead Variances The following summarized manufacturing data relate to Thomas Corporation's April operations, during which 2,000 finished units of product were produced. Normal monthly capacity is 1,100 direct labor hours. Standard Units Costs Total Actual Costs $34 $74,760 Direct material Standard (2 lb. @ $17.00/lb.) Actual (4,200 lb. @ $17.80/lb.) Direct labor Standard (0.5 hr. @ $32/hr.) Actual (950 hrs. @ $31/hr.) Variable overhead Standard (0.5 hr. @ $14/hr.) $16 29,450 $7 Actual 14,450 $118,660 Total...