Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $197,000. Estimated direct labor cost was $486,590 for 19,700 hours.
Actual costs for the most recent month are summarized
here:
Item Description | Total Cost | |
Direct labor (1,970 hours) | $ | 48,660 |
Indirect costs | ||
Indirect labor | 2,410 | |
Indirect materials | 3,320 | |
Factory rent | 3,340 | |
Factory supervision | 4,780 | |
Factory depreciation | 5,800 | |
Factory janitorial work | 1,290 | |
Factory insurance | 1,780 | |
General and administrative salaries | 4,240 | |
Selling expenses | 5,370 | |
Required:
1. Calculate the predetermined overhead rate.
(Round your answer to 2 decimal places.)
2. Calculate the amount of applied manufacturing
overhead.
3. Calculate actual manufacturing overhead
costs.
4. Compute over- or underapplied overhead.
(Input the amount as positive value.)
Please provide rating...
Answer 1) | Calculate the predetermined overhead rate | |||
Overhead rate = Estimated overhead cost / Number of hr | ||||
=197000/19700 | ||||
10 | per hr | |||
Answer 2) | Calculate the amount of applied manufacturing overhead | |||
Applied overhead = Overhead rate * Hr worked | ||||
=10*1970 | ||||
19700 | ||||
Answer 3) | Calculate actual manufacturing overhead costs. | |||
Indirect labor | 2,410 | |||
Indirect materials | 3,320 | |||
Factory rent | 3,340 | |||
Factory supervision | 4,780 | |||
Factory depreciation | 5,800 | |||
Factory janitorial work | 1,290 | |||
Factory insurance | 1,780 | |||
Actual manufacturing overhead | 22,720 | |||
Answer 4) | Compute over- or under applied overhead | |||
Applied over head | 19700 | |||
Actual overhead | 22,720 | |||
Therefore under applied overhead = | 3,020 |
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $185,000. Estimated direct labor cost was $460,650 for 18,500 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,850 hours) $ 46,066 Indirect costs Indirect labor 2,410 Indirect materials 3,340 Factory rent 3,370 Factory supervision 4,820 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $171,990. Estimated direct labor cost was $455,490 for 18,900 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,890 hours) $ 45,550 Indirect costs Indirect labor 2,550 Indirect materials 3,360 Factory rent 3,390 Factory supervision 4,850 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $173,880. Estimated direct labor cost was $438,480 for 18,900 hours. Actual costs for the most recent month are summarized here: Total Cost $43,849 Item Description Direct labor (1,890 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $180,420. Estimated direct labor cost was $469,480 for 19,400 hours. Actual costs for the most recent month are summarized here: Item Description Direct labor (1,940 hours) Indirect costs Total Cost $46,949 Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $181.240 Estimated direct labor cost was $490,530 for 19,700 hours Actual costs for the most recent month are summarized here Total Cost 49.054 hem Description Direct labor (1,970 hours) Indirect oosts Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $169,260. Estimated direct labor cost was $457,560 for 18,600 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,860 hours) $ 45,757 Indirect costs Indirect labor 2,520 Indirect materials 3,470 Factory rent 3,350 Factory supervision 4,840 Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $171,120. Estimated direct labor cost was $448,960 for 18,400 hours. Actual costs for the most recent month are summarized here: Total Cost $44,897 Item Description Direct labor (1,840 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $198,970. Estimated direct labor cost was $474,770 for 19,700 hours. Actual costs for the most recent month are summarized here: Total Cost $ 47, 478 Item Description Direct labor (1,970 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $173,810. Estimated direct labor cost was $441,210 for 19,100 hours. Actual costs for the most recent month are summarized here: Total Cost $44,122 Item Description Direct labor (1,910 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work Factory...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $169,260. Estimated direct labor cost was $453,180 for 18,200 hours. Actual costs for the most recent month are summarized here: Total Cost $ 45,319 Item Description Direct labor (1,820 hours) Indirect costs Indirect labor Indirect materials Factory rent Factory supervision Factory depreciation Factory janitorial work...