5. [20] N 3 team members can contribute efforts to a project. The value of the...
5. [20] N 3 team members can contribute efforts to a project. The value of the project depends on everyone's efforts, but each member bears her own cost of effort. In particular, letting e; be the effort of member i (measured in number of hours spent on the project in a day, so that 0 Sei < 24), the payoff of member i is Ti(C1, ..., en) = (e1e2...en) - ez. (a) (10) Find the symmetric Nash equilibrium effort level. What happens to the equilibrium effort level and the payoff as N oo? (b) (10) Find the (symmetric) socially optimal effort level, where social opti- mum is defined as maximizing the sum of the individual payoffs: Tilen...., en).