Use Excel & show work - The Dynaco Manufacturing Company produces a particular product in an assembly line operation. One of the machines on the line is a drill press that has a single assembly line feeding into it. A partially completed unit arrives at the press to be worked on every 7.5 minutes, on average. The machine operator can process an average of 10 parts per hour. Determine the average number of parts waiting to be worked on, the percentage of time the operator is working and the percentage of time the machine is idle.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The manufacturing system represents single server queuing model.

Excel Model for the problem is as follows:

Dynaco Manufacturing Company - Single Server Queuing Model

Inter-arrival time

7.5

minutes per unit

Arrival rate

λ

8

units per hour

Serivce rate

µ

10

units per hour

Utilization of server

ρ

0.8

Average number of requests that will be waiting for service

Lq

3.20

Units

average waiting time in hour before service begins

Wq

0.40

Hours per unit

average waiting time in minutes before service begins

Wq

24.00

Minutes

Percentage of time the operator is busy

80.00%

Percentage of time the operator or machine is idle

20.00%

Excel Formula:

Dynaco Manufacturing Company - Single Server Queuing Model

Inter-arrival time

7.5

minutes per unit

Arrival rate

λ

=60/C2

units per hour

Serivce rate

µ

10

units per hour

Utilization of server

ρ

=+λ/µ

Average number of requests that will be waiting for service

Lq

=λ^2/(µ*(µ-λ))

Units

average waiting time in hour before service begins

Wq

=+C6/λ

Hours per unit

average waiting time in minutes before service begins

Wq

=+C7*60

Minutes

Percentage of time the operator is busy

=+ρ

Percentage of time the operator or machine is idle

=1-ρ

Snapshot:

1 Dynaco Manufacturing Company - Single Server Queuing Model 2 Inter-arrival time 3 Arrival rate 4 Serivce rate 5 Utilization

the average number of parts waiting to be worked on: 24 minutes

the percentage of time the operator is working: 80%

and the percentage of time the machine is idle.: 20%

Add a comment
Know the answer?
Add Answer to:
Use Excel & show work - The Dynaco Manufacturing Company produces a particular product in an...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • For multiple server models please use the approximate formulae and check your answers using Excel software....

    For multiple server models please use the approximate formulae and check your answers using Excel software. Students arrive at an administrative services office at an average of one every 15 minutes, and their requests take, on average, 10 minutes to be processed. The service counter is staffed by only one clerk who works eight hours per day. Assume exponential inter-arrival time and service times. a. What percentage of time is server idle? b. How much time, on average, does a...

  • A final assembly plant for Dictatape, a popular dictation company, produces the DT, a hand-held dictation...

    A final assembly plant for Dictatape, a popular dictation company, produces the DT, a hand-held dictation unit. There are 400 minutes available in the final assembly plant for the DT, and the average demand is 80 units per day. Final assembly requires 6 separate tasks. Information concerning these tasks is given in the following table. Answer parts a through e. Afinal assembly plant for Dictatape, a popular dictation company, produces the DT, a hand-held dictation unit. There are 400 minutes...

  • Operations Management

    In the molding shop, there are 11 machines capable of molding the one part done in-house, but historically one machine is always being maintained or repaired at any given time. Each machine requires a full-time operator who earns an hourly wage of $15, though only 50 minutes of a molding operator's typical hour is occupied with the tasks of loading, unloading, actively monitoring, and adjusting the machine. The machines can each produce 25 parts per hour. The workers will work...

  • 1. The process is performed by several resources. 2. Resources are shared across assembly lines (i.e.,...

    1. The process is performed by several resources. 2. Resources are shared across assembly lines (i.e., workers must multitask and perform multiple activities for every flow unit.) 3. The resource that limits hourly production is not the same resource that limits the process lead-time. From 2002 to 2009, Honda’s 1800cc cruiser-style motorcycle, the VTX1800, was assembled in Marysville, Ohio from four major subassemblies. The following is a simplified explanation of the assembly process. All resources are indicated in bold.   •...

  • i need help with d-1 d-2 and e please! Problem 7-15 Chec The Goodparts Company produces...

    i need help with d-1 d-2 and e please! Problem 7-15 Chec The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 110 components per hour. Part C undergoes a drilling operation before being finally assembled with the...

  • 5. What was the ratio of actual processing time for the product to total lead time?...

    5. What was the ratio of actual processing time for the product to total lead time? 1075 International Journal of Prodiction Resecarch Project Management 90,60 30 days forecast End Customers Hyerson Steel Weekly Schedule Dally Shipping Schedule Welding Finishing Assembly Wiring Fabrication 23 days CIT-140.5mn PIT-250 min C/T 126min days CT-128min PIT-480 min CIT 120 Ave CIT 120 CIO 15 days 3 days 3 days 3 days 1 days L. T. 25 days 480 min 2400 min IP.T. 3158.5 min...

  • Cases CASE 4.1 LANDRY ASSOCIATES CAPACITY ANALYSIS. Landry Associates produces a broad range of components for...

    Cases CASE 4.1 LANDRY ASSOCIATES CAPACITY ANALYSIS. Landry Associates produces a broad range of components for stereos and similar electronic products. It has been having prob lems with profitability over the past few years. It runs a number of machines that make most of the components, but the machines sit idle a good percentage of the time. Since they are fairly excen. sive machines, Bruce Landry knows that this is the heart of his problem, but even when the lines...

  • USING EXCEL TO THINK LIKE AN ENGINEER. Text book Please use excel to answer the question....

    USING EXCEL TO THINK LIKE AN ENGINEER. Text book Please use excel to answer the question. Please do not attempt if you are new to excel, an example has been provided. You guys have gotten my last 4 answers wrong. -Assume that your company has received an order for 100,000 assemblies each consisting of two subassemblies. The two subassemblies end-to-end to create an assembly that is to be 3,000 mm in length with a lower specification limit of 2,995 mm...

  • Can yau Show tho Calculatans to each answeie piesle legle Problem 1 REGIONAL AIRLINES Regional Airlines...

    Can yau Show tho Calculatans to each answeie piesle legle Problem 1 REGIONAL AIRLINES Regional Airlines is establishing a new telephone system for handling flight reservations. During the 10:00 A.M. to 11:00 A.M. time period, calls to the reservation agent occur ran- domly at an average of one call every 3.75 minutes. Historical service time data show that a reservation agent spends an average of 3 minutes with each customer. The waiting line model assumptions of Poisson arrivals and exponential...

  • West Coast Manufacturing, Inc. offers a range of aviation services to airlines. Its primary services are repairing and overhauling planes and their interiors for its client airlines, which range in si...

    West Coast Manufacturing, Inc. offers a range of aviation services to airlines. Its primary services are repairing and overhauling planes and their interiors for its client airlines, which range in size from small regional carriers to large international carriers. As an extension to its seat repairing services, West Coast Manufacturing recently expanded into the design and assembly of airplane seats. Since it is new to the business, a typical seat order for West Coast Manufacturing is for one plane, consisting...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT