A final assembly plant for Dictatape, a
popular dictation company, produces the DT, a hand-held dictation
unit. There are 400 minutes available in the final assembly plant
for the DT, and the average demand is 80 units per day. Final
assembly requires 6 separate tasks. Information concerning these
tasks is given in the following table.
Answer parts a through e.
Answer
(Please like the answer it will encourage me.)
A final assembly plant for Dictatape, a popular dictation company, produces the DT, a hand-held dictation...
Problem 4. A company produces a certain product by assembling it at an assembly plant. All the com ponents needed to assemble the product are purchased from a single supplier. A shipment of all the components is received from the supplier each time the assembly plant needs to replenish its inventory of the components. The company incurs a shipping cost of $500 in addition to the purchase price for the components each time this is done. Each time the supplier...
Tailwind, Inc, produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid filed compartments to provide more stability and better protection against knee, foot, and back injuries Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 62. The information for the tasks is as follows Task Performance Time (mins) Predecessors <UO a-b) The correct precedence...
I AM COMPLETELY CONFUSED! Any help would be greatly appreciated. Chairvana’s Table Assembly Operations: Chairvana Inc. manufactures metal tables and chairs at its plant in Paxton, Illinois. Recently hired general manager, Bob Behar, is concerned about the large inventories and manufacturing inefficiencies in the plant. The Paxton plant has two separate assembly lines – one for chairs and one for tables. Demand for chairs is significantly larger than tables, so Bob decides to tackle the table assembly process for first....
... 9.13 Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary” is a chair that has been designed using ergonomics to provide comfort during long work hours. The chair sells for $130. There are 480 minutes available during the day, and the average daily demand has been 50 chairs. There are eight tasks: TASK PERFORMANCE TIME (min) TASK MUST FOLLOW TASK LISTED BELOW A,B F, G a) Draw a precedence diagram of this operation. b) What is...
Question d) The idle time for the assembly line per cycle =
_____ minute(s)
The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of the Mach 10 for 200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 60 boats. Given the following information: Task Predecessors Performance Time (mins) 2. 1 1 A B...
The Mach 10 is a one-person sailboat manufactured by Creative Leisure. The final assembly plant is in Cupertino, California. The assembly area is available for production of the Mach 10 for 200200 minutes per day. (The rest of the time it is busy making other products.) The daily demand is 6060 boats. Given the following information: Task Performance Time (mins) Predecessors A 22 minus− B 22 A C 11 A D 11 C E 33 C F 11 C...
Widget Manufacturer A plant produces several related models of widgets. Production of each model involves the same machinery. The plant produces each model in separate production runs. Each production run has significant setup costs and the cost per setup is the same for every model. Also, the assembly of each unit requires hand labor (direct labor). The following costs were incurred during a recent year: a) direct labor costs. b) costs of placing orders to procure parts. c) costs of...
3. Illinois Furniture, Inc., produces all types of office furniture. The "Executive Secretary” is a chair that has been designed using ergonomics to provide comfort during long work hours. The chair sells for $130. There are 480 minutes available during the day, and the average daily demand has been 48 chairs. the eight tasks required to produce the chair and the precedence diagram are shown below TASK PERFORMANCE TIME (min) ULUI Precedence diagram a. What is the cycle time for...
1 The Quality Managem ent Depact ent is asiced so balance a sensed assembly line that wwall turn out 400 ndeotapes per day There will be eight worlong hours in each day The detailed nformation ss given in the table below Task Time (minutes) 0 4 1 0 0 01 Total The diagram is as folow ()Determ ine the calculated cycle time b) What is the minmum number of stations needed (e) Compute the efficiency of the system 2 A...
Case Studies Jackson Manufacturing Company Kathleen McFadden, vice president of operations at Jackson Manufacturing Company, has just received a request for quote (RFQ) from DeKalb Electric Supply for 400 units per week of a motor armature. The components are standard and either easy to work into the existing production schedule or readily available from established suppliers on a JIT basis. But there is some difference in assembly. Ms. McFadden has identified eight tasks that Jackson must perform to assemble the...