In a time study of a manufacturing operation, 15 actual times were recorded for the duration...

In a time study of a manufacturing operation, 15 actual times were recorded for the duration of producing a product for a skilled worker who has an experience of 10 years and for an unskilled worker who started to work one months ago: For the skilled worker, the average time observed to complete a product was 12 minutes. The performance rating applied to the observed worker was 1.10 and the allowance during a 10-hour shift was 30% or 180 minutes. For the unskilled worker, the average time observed to complete a product was 15 minutes. The performance rating applied to the observed worker was 0.85 and the allowance during a 10-hour shift was 10% or 60 minutes. Compute the labor standard times for skilled workers and unskilled workers. Discuss your results by comparing labor standards of skilled and unskilled workers.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Skilled worker

Average observed time = 12 minutes

Performance rating = 1.10

Allowance factor = 30%

Normal time = Average observed time * performance rating

= 12*1.10

= 13.2 minutes

Standard time = Normal time / (1 - Allowance factor)

= 13.2 / (1 - 30%)

= 18.86 minutes

--------------------

Unskilled worker

Average observed time = 15 minutes

Performance rating = 0.85

Allowance factor = 10%

Normal time = Average observed time * performance rating

= 15*0.85

= 12.75 minutes

Standard time = Normal time / (1 - Allowance factor)

= 12.75 / (1 - 10%)

= 14.17 minutes

--------------------------------------------

Comparing the labor standards of skills and unskilled workers, we see that the standard time of unskilled worker is much lower than that of the skilled worker.

Add a comment
Know the answer?
Add Answer to:
In a time study of a manufacturing operation, 15 actual times were recorded for the duration...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that ...

    What is a Therblig? Please specify and give exampie. 3) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. Note that all units are in minutes 15 Element Performance 1 13 4 6 rating 85% 100% 110% 95% 0.5 258* 0.89 1.14 0.46 1.52 0.8 0.44 1.5 0.84 1.1 0.43 1.47 0.48 1.49 0.85 0.45 1.51 0.83 1.081.21.161.26 4 * Machine broke...

  • (20 points) A direct time study is performed to obtain average time and performance rating values...

    (20 points) A direct time study is performed to obtain average time and performance rating values for the work elements in a certain repetitive task. The values are given in the table below. Elements a, b, and c are worker-controlled. Element d is a machine-controlled element and its time is the same each cycle (N.A.means performance rating is not applicable). Element c is performed while the machine is performing its cycle (element d). Element e is a worker- controlled irregular...

  • A time study analyst observes a worker over a period of time and calculates that the worker requi...

    A time study analyst observes a worker over a period of time and calculates that the worker required 60.0 minutes per unit produced. The worker was rated by the analyst at a 120 percent performance rating, and an 15 percent allowance for personal time and fatigue applies. (1) What is the standard time for this task? (2) If a worker managed to produce 10 units in an eight-hour day, what would their day's pay be if the base rate is...

  • A time study analysis shows an assembly operation for 50 cycles with an average cycle time of 15.00 minutes. If you ass...

    A time study analysis shows an assembly operation for 50 cycles with an average cycle time of 15.00 minutes. If you assigned a performance rating of .95 and a work-day allowance factor of 20 percent, answer the following question: What is the Observed Time?

  • Duration Total Rainfall, in, during the time period 5 min 10 min 15 min 20 min...

    Duration Total Rainfall, in, during the time period 5 min 10 min 15 min 20 min 0.07 in 00.123 irn 0.16 in 0.17 in Determine the average rainfall intensities, inches/hour, over the duration and plot the rainfall intensity (y-axis) vs. duration (x-axis). Typically as the duration increases, the intensity decreases. Did the rainfall fit this pattern? a. b. The total rainfall from Midnight to the end of the rain (about 1pm) was 1.10 inches, the time from midnight to end...

  • 1. (18 points) the standard time is to be established study. The observed time for the...

    1. (18 points) the standard time is to be established study. The observed time for the cycle averaged 4.8 min. The worker's performance was rated at 90 which took 2.0 min, rated at 120%. The PFD allowance for the class of work is 15%. Determine (1) The normal time, (b) the standard time for the cycle, and (c) the worker's efficiency if the work produces 123 work units during an 8-hour shift. for a manual work cycle by direct time...

  • As part of a time study a particular job was analyzed. The study included 20 job...

    As part of a time study a particular job was analyzed. The study included 20 job cycles and the following cumulative times and performance rating factors for each element were reported: Element Σt (min) RF 1 12.22 1.10 2 9.55 1.05 3 14.5 0.90 4 11.21 0.95 Assuming an allowance factor of 15% the standard time for this job would be Select one: A. 2.712 minutes B. 3.67 minutes C. 4.35 minutes D. 2.358 minutes

  • A worker-machine operation was found to involve 40 minutes of machine time per cycle in the...

    A worker-machine operation was found to involve 40 minutes of machine time per cycle in the course of 40 cycles of stopwatch study The worker's time averaged 25 minutes per cycle, and the worker was given a rating of 115 percent machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 15 percent of work time which is applied only to the worker element not the machine element), determine...

  • A time study was conducted on a job that contains four elements. The observed times and...

    A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 80 % 0.51 0.56 0.46 0.46 0.46 0.46 2 75 1.51 1.51 1.46 1.46 1.46 1.51 3 120 0.86 0.86 0.76 0.81 0.86 0.81 4 105 1.11 1.16 1.11 1.16 1.16 1.21 a. Determine the average cycle time for...

  • The work shift at the ABC Company runs fr lunch from 11:30 to 12:15 p.m. that does not count as part of the work shift (workers are not paid for this time). The company provides two 12-minute res...

    The work shift at the ABC Company runs fr lunch from 11:30 to 12:15 p.m. that does not count as part of the work shift (workers are not paid for this time). The company provides two 12-minute rest breaks during working hours (paid time), one in the morning and one in the afternoon. The com m. to 4:15 p.m. with a 45 minute break for pany also allows 25 minute day for personal needs (paid time). In addition, a work...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT