(a) Graph of function y=f(t)=constant
so the Area enclosed by the curve will straight line after integration of constant.
so answer is (C)
(b)Graph of function y=f(f) is straight line in negative direction
After integrating Area will get in quadratic form so Answer is (A)
(c)Given function y=f(t) is quadratic
Area enclosed by the curve will be polynomial of degree 3
so answer is(D)
(d) the given function is y=f(t) is sinusoidal so the area is also sinusoidal so answer is (B)
29 of 32 (8 complete) re: 0 of 1 pt .69 atch the functions f whose...
23 of 55 (31 complete) | | Score: 53.67% Score:0 of 1 pt 1.7.33 Question Help * The length of a rectangle is 4 meters less than twice the width. If the area of the rectangle is 336 square meters, find the dimensions The width ismeters The length ismeters Enter your answer in the edit fields and then click Check Answer All parts showing Clear All Check An
Score: 0 of 1 pt 4 of 16 (7 complete) HW Score: 40.63%, 6.5 of 16 F 1.2.21 Question Help A coffee shop owner blends a gourmet brand of coffee with a cheaper brand. The gourmet coffee usually sells for $9.00 per pound. The cheaper brand sells for $7.00 per pound. How much of each type should be mixed in order to have 50 pounds of coffee that is worth $8.50 per pound? pounds of the gourmet coffee should be...
Homework: 4.4 Homework Problems Score: 0 of 1 pt + 3 of 10 (2 complete) 4.4.5 Consider the data set given in the accompanying table. Complete parts (a) through (d). Click the icon to view the data table. y2 30 25 50 105 Marginal 60 distribution 40 80 180 (b) Construct a relative frequency marginal distribution X2 X3 Relative frequency marginal distribution 30 15 30 30 25 50 Relative frequency marginal distribution (Round to three decimal places as needed.) Enter...
core: 0 of 1 pt 1 of 8 (1 complete) HW Score: 12.5. 5.4.1 :8 Question Help A population has a mean u = 158 and a standard deviation o = 27. Find the mean and standard deviation of the sampling distribution of sample means with sample size n = 54. The mean is H-= , and the standard deviation is o- = (Round to three decimal places as n eded.) ur Enter your answer in the edit fields and...
12 of 14 (10 complete) HW Score: 71.439 Score: 0 of 1 pt Quest 5.5.57 A golf-course architect has four linden trees, four white birch trees, and three bald cypress trees to plant in a row along a fairway. In how many ways can the landscaper plant the trees in a row, assuming that the trees are evenly spaced? different ways The trees can be planted in Enter your answer in the answer box and then click Check Answer. Check...
Score: 0 of 1 pt 2.5.23 Construct an ordered stem and leaf display for the following data. 107 114 D 100 116 128 117 103 113 103123 105 136 92 135 106 Complete the ordered stem and leaf diagram below Enter your answer in the edit fields and then click Check Answen All parts showing
MANG471-002-24185 Operations Management Homework: Chapter 7 Score: 0.89 of 1 pt 2 of 5 (5 complete) % Problem 1 SA b. Calculate the critical path for this project. The critical path is A-C-F-H-J and the project duration is 26 days. (Enter your response as a whole number.) c. How much slack is in each of the activities G, H, and I? Activity Activity Time (days) On critical path? Slack (days) Enter your answer in the edit fields and then click...
Homework: HW #7 Say Score: 0 of 1 pt 1 of 8 (0 complete) HW Score: 0%, 0 of 10 p S7-2 (similar to) Question Help Solar Energy Consulting pays $310,000 for a group purchase of land, building, and equipment. At the time of acquisition, the land has a current market value of 5170,000, the building's current market value is $34,000, and the equipment's current market value is $136,000. Prepare a schedule allocating the purchase price of $310,000 to each...
Homework: CH16 core: 0 of 1 pt ( 5 of 7 (5 complete) E16-19 (similar to) Consider the following partially completed schedules of cost of goods manufactured. Compute the missing amounts Click the icon to view the schedule) Lee Supply Beginning Work in Process Inventory Direct Materials Used Direct Labor Manufacturing Overhead Total Manufacturing Costs incurred during the Year Total Manufacturing Costs to Account For Ending Work-in-Process Inventory Cost of Goods Manufactured 54.500 nter any number in the edit fields...
whats d Score: 0.6 of 1 pt 3 of 9 (9 complete) 6.2.5 Given a normal distribution with p = 100 and a = 10, complete parts (a) through (d). Click here to view page 1 of the cumulative standardized normal distribution table, Click here to view page 2 of the cumulative standardized normal distribution table. (Round to four decimal places as needed) b. What is the probability that X<75? The probability that X < 75 is 0.0062 (Round to...