Question

Calculate the inventory container size required given the following: Demand rate = 10 parts per hour,...

Calculate the inventory container size required given the following:

Demand rate = 10 parts per hour, Safety stock required = 16%
Number of containers = 14, Time to cycle through entire system = 6 hours

2 parts
3 parts
4 parts
5 parts
0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
Calculate the inventory container size required given the following: Demand rate = 10 parts per hour,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • A manufacturing assembly line has a demand for specific part of 1,200 parts per eight-hour day....

    A manufacturing assembly line has a demand for specific part of 1,200 parts per eight-hour day. It wants to design a lean system using containers. It takes about four hours to round-trip a container from one work center to the next and back again. It also wants to hold 10% safety stock of this part in its system. a) Design a container system. State each container's size and how many are needed. b) Calculate the maximum system inventory for this...

  • Suppose a Lean work center is being operated with a container size of 25 units and...

    Suppose a Lean work center is being operated with a container size of 25 units and a demand rate of 100 units per hour. Also assume it takes 180 minutes lead time to fulfill a downstream container request. Assuming a safety stock factor of 5 percent, how many containers should be required? Select one: O a. none of these O b. 756.0 containers O c. 12.6 containers O d. 1,080.0 containers O e. 18.0 containers

  • Please solve in excel with all formulas shown You have the following information: 5. Demand rate...

    Please solve in excel with all formulas shown You have the following information: 5. Demand rate = 250 units per hour Lead time = 15 hours Container capacity 300 units Safety stock = 20% Determine the number of Kanban cards required. a. Convert these Kanban cards into the number of hours b. of demand they represent If the container size is reduced from 300 to 150 units C what impact, if any, will it have on inventory levels?

  • Consider the following information: Demand rate (D) = 270 units per hour Lead time (T) =...

    Consider the following information: Demand rate (D) = 270 units per hour Lead time (T) = 10 hours Container capacity (C) = 30 units Safety factor (x) = 10% a. The number of kanban production cards is (Enter your response rounded up to the next whole number.)

  • Lady Bug Machineries uses a lean production assembly line to make its generators. In one assembly...

    Lady Bug Machineries uses a lean production assembly line to make its generators. In one assembly area, the demand is 200 parts per 8-hour day. It uses a container that holds 10 parts. It typically takes about 5 hours to round-trip a container from one work center to the next and back again. They also desire to hold a 20% safety stock of this part in the system. Based on the required safety stock of zero and the number of...

  • Copenhagen Industries uses a kanban system to manage production of their subassembly. In a 10-hour day,...

    Copenhagen Industries uses a kanban system to manage production of their subassembly. In a 10-hour day, they use 1,500 units and use containers that can hold 50 units each. It takes 45 minutes to fill and move a container of parts to the right place on the subassembly line that is currently rated at a 15% safety factor. If the required safety stock was changed to zero and 3 containers were being used in the system, calculate the maximum inventory....

  • A customer has an average daily demand of 40 parts. Your company creates Kanbans with a 15% safety factor. The replenish...

    A customer has an average daily demand of 40 parts. Your company creates Kanbans with a 15% safety factor. The replenishment time once a signal has been received is 8 hours and you have 8 hours available per day. There are four kanban containers in process. Calculate the number of units per kanban container A) 12 B) 10 C) 11 D) 13

  • Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time...

    Question Help Consider the following information: Demand rate (D) = 1,500 units per hour Lead time (T) = 7 hours Container capacity (C)= 220 units Safety factor (x) = 20% a. The number of kanban production cards is (Enter your response rounded up to the next whole number.) b. The cards will represent hours' worth of demand. (Enter your response rounded to one decimal place.) c. Suppose the safety factor is eliminated. The number of kanban production cards is to...

  • Boehm Compressors uses a lean production assembly line to make its compressors. In one assembly area,...

    Boehm Compressors uses a lean production assembly line to make its compressors. In one assembly area, the demand is 100 parts per eight-hour day. It uses a container that holds eight parts. It typically takes about six hours to round-trip a container from one work center to the next and back again. It also desires to hold 15% safety stock of this part in the system. If it reduced the number of containers by one, how would this impact the...

  • Explain how the production schedule is developed and communicated to the shop-floor in a Just-in-Time (JIT)...

    Explain how the production schedule is developed and communicated to the shop-floor in a Just-in-Time (JIT) manufacturing system. Q. B8 (a) (10 marks) Define kanban as it is understood in JIT systems and explain the role and operation of a conveyance or C kanban in the production system. (b) (6 marks) (c) Data for a particular part that is controlled by a two-card kanban system on a JIT feeder line is as follows: daily demand: 500 units average waiting and...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT