2. Draw a precedence network for 3 activities: A, B, and C; with durations of 9,...
Draw the following network and calculate all dates (all activities are contiguous): Activity Duration IPA Type Rel Lag ES EF LS LF TF FF A 4 - B 3 - C 8 A D 7 A,B E 6 D SS 3 F 3 D FF G 5 F SS 2 2 F FF please do not copy from others, they are wrong
he he tolenwine table presents the aetivitiles of s small grojest and thetr tme The precedence relationships among the activities are also p Duration Activity Predecessor 2 4 C, D, E Draw the network of the project showing the activities and their time durations Note that this should be a AON network). a) Using the time durations for each activity, determine the critical path for the project network. b) decide whether on. She 52. The local operations manager for the...
3 & 15. For the following schedule, draw the node network, perform the CPM calculations, mark the critical path, and complete the table. Repeat exercise 3 with an imposed finish date of 15 and then 20 days. Activity Duration IPA ES EF LS LF TF FF A 2 - B 4 A C 6 A D 9 A E 5 B F 7 B, C G 3 D, E, F
II. The following network represents a project and shows the activities with their durations. The attached table also shows the normal and crash times and costs for all activities. (20%) (1) Try to compress project durations day by day, and fill in your answers in the appropriate cells of the attached table. (You don't need to fill in the cells associated with project durations where the corresponding compression is impossible.) (15%) (2) Assume that the indirect cost for this project...
A simple CPM network has three activities, A, B, and C. A is an immediate predecessor of B and of C. B is an immediate predecessor of C. The activity durations are A=4, B=3, C=5. The network has no critical path. The critical path cannot be determined without knowing PERT expected activity times. The critical path is A-C, duration 10.5. The critical path is A-B-C, duration 9. The critical path is A-B-C, duration 12.
Question 2 Draw the following network using Line Of Balance "LOB" method and find project duration considering number of repetitive is equal to five floors with following data: Duration Depends on Relationship & Lag Activity ( days 6 4 FS-1 A SS-3
CPM -5% A Subcontractor must do the following: a) Framing (5 days) b) Drywall Installation (4 days) c) Drywall finish and paint (3 days) Assuming he wants to make sure each activity finishes at least 1 day after its predecessor has finished, draw these three activities in a precedence diagram (logic network) and calculate how much time the subcontractor would need to finish all three activities Scheduling Basics-Copyright 2013 Bill Morales
5 & 17. For the following schedule, draw the node network, perform the CPM calculations, mark the critical path, and complete the table. Repeat exercise 5 with an imposed finish date of 26 and then 35 days. Activity Duration IPA ES EF LS LF TF FF A 6 - B 2 - C 9 - D 4 A, B E 7 B F 5 D G 10 D, E H 8 C, F, G I 3 C, G J 2...
The activities,, their durations and predecessor activities for designing, writing and installing a computer database are shown in the table below Predecessor activity Duration (weeks) Activity 1 1. Contract negotiation 1 2. Discussions with main users 1 3. Review of current documentation 2 4. Review of current systems 3, 4 4 5. Systems analysis (a) 5 7 6. Systems analysis (b) 5 12 7. Programming 7 8. Preliminary testing 3, 4 9. Existing system review report 5, 9 10. System...
Assignment #2 is to provide a problem statement, WBS diagram, activity listing, and precedence diagram. Deliverables for HW2 shall include: · A Project Statement For the attached example (see item 3 below), the Project Statement is: “Owner to design and build a new residence. Hiring and oversight of architectural, design, and construction professionals will be managed by the Owner. All materials and permits will be provided by the Owner.” · An Activity Listing The activity listing should be prepared and...