You are the project manager's assistant on a construction site. The project manager is off site...
You are the project manager's assistant on a construction site. The project manager is off site for the day and you are responsible for the ongoing progress of the site in her absence. Two similar beams are delivered to a construction site. Each beam is a hollow box beam, constructed of A36 structural steel, (E=29.0 x 106 psi, density of 490 lbm/ft?), each beam having outside dimensions of 16" base and 18" height, 18 feet long. Beam A has top...
You are the project manager's assistant on a construction site. The project manager is off site for the day and you are responsible for the ongoing progress of the site in her absence. Two similar beams are delivered to a construction site. Each beam is a hollow box beam, constructed of A36 structural steel, (E=29.0 x 10ʻpsi, density of 490 1bm/ft), each beam having outside dimensions of 16" base and 18" height, 18 feet long. Beam A has top and...
Two similar beams are delivered to a construction site. Each beam is a hollow box beam, constructed of A36 structural steel, (E=29.0 x 106 psi, density of 490 lbm/ft?), each beam having outside dimensions of 16" base and 18" height, 18 feet long. Beam A has top and bottom wall thicknesses of 0.5" and side wall thickness of 0.375". Beam B has top and bottom wall thicknesses of 0.4375" and side wall thickness of 0.3125". The structure to be constructed...
For the next two problems use the following information: A simply supported Douglas fir wood beam is designed to carry a concentrated load P of 1250 lbr in the center. The distance L between supports is 96 inches. For the beam cross sectional area given below, determine the moment of inertia and deflection. Douglas fir has the following properties: Modulus of Elasticity 1.76 x 100 psi, Density 34 lbm/ff3 Beam dimensions are: Web thickness tw 0.875 in, flange thickness t...
the new Project manager is appointed you for the construction of a new warehouse on site. question: define completion criteria, by providing clear outline of project deliverables and acceptable quality standards.
#2. Short Answer You are a project manager of a construction contractor. You have a supplier who manufactures and delivers curtain walls to your site. Your supplier and you are working on a solution to reduce total supply chain costs. You found that the PPC (Planned Percent Complete) and PCR (Percent Constraint Removed), of the contractor in charge of structure work are 60% and 43% respectively for the last three months. How do you think such PPC and PCR make...
Soil in construction PROBLEMS 1. A front loader will operate in an aggregate crushing operation on river bottomland. The soil is saturated with an unconfined compressive strength averaging about 900 psf. The maximum wheel load for the loader proposed is 40 kips. Tire pressure is 70 psi. Calculate the thickness of aggregate that should be placed over the natural soil to provide a suitable working surface 2. Off-highway trucks with maximum 80-kip axle loads and 60-psi tire pressures will oper-...
please help with this problem Problem Statement You are asked to design an exterior balcony for a client. The client has a 7,000 sq ft 2-story house. He wanted to add a nice looking balcony to it. He showed you the rough sketches and dimensions. The balcony is to be supported on two simply-supported edge beams. Each beam is supported by two short columns, each column is supported by appropriate footings. is! slao - beams Supporting slab Columns supporting beans...
Clayton Campus- R... Unit Guide Manager Current students- ENG1001-Lighter.. SISys NGT001 Q1: Ans: I113.5x10 beam centre mm max compress stress = 358MPa at A/D, max tension stress 286 MPa at QUESTION 2 A concrete slab, 300 mm thick, 3 m wide and 4 m long, is used to support a characteristic live load of 4 kN/m2. It has two service ducts (holes) of diameter 100 mm equally spaced along its width. The concrete slab with ducts is simply supported by...
Review An engineered wood beam (Figure 1) will replace a portion of a structural wall as part of a house renovation. The beam can be modeled as a simply supported beam with a span L = 18 ft and an uniform distributed load w = 810 lb/ft . The beam is to be constructed as an I-beam with nails securing the flanges to the web. The flanges are 6 in wide and 1 in thick. The web has depth 18...