The MPS for the product shown calls for 75 units to be produced in weeks 2 and 4. Item B has a lead time of 1 week, the batch size is 200, and there are currently 100 units of inventory. A planned order release for B will be needed in week(s) ________.
|
Below is the screenshot of the MRP schedule -
From above -
Planned Order Release will be in Week 3.
Correct option will be Option c.
Below is the screenshot of the formula applied -
The MPS for the product shown calls for 75 units to be produced in weeks 2...
The MPS for the product shown calls for 75 units to be produced in weeks 2 and 4. Item B has a lead time of 1 week, the batch size is 200, and there are currently 100 units of inventory. A planned order release for B will be needed in week(s) ________. a. 1 b. 2 c. 3 d. 1 and 2 e. 1 and 3 A B (3) С D (2)
Given the information shown, if there are currently 200 units available, the batch size is 500, and lead time is two weeks, planned order releases will be needed in weeks ____. Week 1 2 3 4 Gross Requirements 320 360 300 380 Scheduled Receipts 500 A. 1 and 2 B. 1 and 3 C. 2 and 3 D. None of the above
5. (10 points) An end item has the product structure diagram given in the following figure. Suppose that the MPS for the end item is End then A43) Fit) 3 weeks 4 weeks a. Find the planned order release for component F b. Find the planned order release for component I. c. Find the planned order release for component H. 5. (10 points) An end item has the product structure diagram given in the following figure. Suppose that the MPS...
You need to schedule 10 units of product Alpha for delivery in 6 weeks. Three units of D and 2 units of F are required for each Alpha. The lead time for Alpha is 1 week. Lead time for D is 1 week, and lead time for F is 2 weeks. Click the icon to view the product structure Click the icon to view the time-phased product structure. i More Info Construct a net material requirements plan if there are...
The BOM for product A is given below Weeks of Lead Time On Hand 75 150 50 100 Part D2 Assume the master schedule calls for 200 units of product A in week 5 and 250 units in week 6 a Develop a materials plan for this product b. What actions should be taken immediately?
(20 points) The bill-of-materials tree for 5. Standard remote Deluxe remote two remotes are shown on the right Std keypad Back case Batteries (2) You need 100 standard remotes each in weeks 4 s Back case 1 Batteries (2) You need 150 deluxe remotes in week 5. A. Fill out the tables below to find the number of each item to order each week assuming lot-for-lot ordering Item: Standard remote Lead time week Gross requirements On hand 60 60 Net...
Determine planned order releases for each part shown in the product structure tree. 180 units of the finished product 565 are needed in week 6 (as shown in the master production schedule below). To figure out X43 material plan, look at planned order releases of both 565 and Y36. So, fill out X43 form after filling out 565 and Y36 plans. 565 X43 Y36(2) N78 J27(4) X43 Part Number On Hand Lot Size Lead Time 565 0 Lot-for-lot 1 week...
Eighty units of end item X are needed at the beginning of week 6, and another 30 units are needed at the beginning of week 8 B(2) D(3) D(2) F(2) Prepare a material requirements plan for component D. D can only be ordered in whole cases (50 units per case). One case of D is automatically received every other week, beginning in week 1 (i.e., weeks 1, 3, 5, 7). Also, there are 30 units of B and 20 units...
manufacturing plng/ control 1. Suppose that your company sells a product for which the annual demand is 10,000 units. Holding costs are $1.00 per unit per year, and setup costs are $200 per order (a) What is the economic order quantity for your product? (b) What will be the annual total cost holding and ordering? 2. A company has currently 100 workers. A worker works 40 hours a week, and can at most work 20 hours of overtime per week....
Question 1 (2-Part) a) Complete the MPS record below for a single item. (Enter your responses as integers. A response of 0is equivalent to being not applicable.) Item: A Order Policy: 60 units Lead Time: 1 week on Hand: 35 20 28 28 30 35 18 Customer orders 17 17 MPS quantity MPS start b) Shown below is a partially completed MPS record for ball bearings. a. Develop the MPS for ball bearings. (Enter your responses as integers. A response...