Question

The Goodman Tire and Rubber Company periodically tests its tires for tread wear under simulated road...

The Goodman Tire and Rubber Company periodically tests its tires for tread wear under simulated road conditions. To study and control the manufacturing process, 20 samples, each containing three radial tires, were chosen from different shifts over several days of operation, with the following results. Tread wear measurements are in hundredths of an inch.

Sample Tread Wear
1 31 42 28
2 26 18 35
3 25 30 34
4 17 25 21
5 38 29 35
6 41 42 36
7 21 17 29
8 32 26 28
9 41 34 33
10 29 17 30
11 26 31 40
12 23 19 25
13 17 24 32
14 43 35 17
15 18 25 29
16 30 42 31
17 28 36 32
18 40 29 31
19 18 29 28
20 22 34 26

Assuming that these data were collected when the manufacturing process was believed to be operating in control, develop the R chart.

Compute the upper and lower control limits for the R chart. (Round your answers to two decimal places.)

UCL=

LCL=

Construct the R chart.

  • Assuming that these data were collected when the manufacturing process was believed to be operating in control, develop the x bar chart.

Compute the upper and lower control limits for the x bar chart. (Round your answers to two decimal places.)

UCL=

LCL=

Construct the x bar chart.

​​​​​​​

0 0
Add a comment Improve this question Transcribed image text
Answer #1

1)for R chart:

average range R̅ = 11.4
sample size n   = 3
sample size n=3, criitcal value of D3= 0
sample size n=3, criitcal value D4= 2.575
control line (CL) = R̅= 11.40
upper control limit (UCL)=D4R̅ = 29.36
lower control limit(LCL) =D3R̅ = 0.00

35 30 25 20 15 water 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -CL-UCLLCL

2)for xbar chart:

sample mean x̅ = 29.167
average range R̅ = 11.4000
sample size n   = 3
sample size n=3, criitcal value of A2= 1.023
control line (CL) = x̅= 29.16667
upper control limit =x̅+3*A2R̅ = 40.83
lower control limit =x̅-3*A2R̅ = 17.50

for X bar Chart:

45 40 35 30 25 20 war 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -CL-UCLLCL

Add a comment
Know the answer?
Add Answer to:
The Goodman Tire and Rubber Company periodically tests its tires for tread wear under simulated road...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Sample Data Sample Data Hour Sample Taken Hour Sample Taken 1 4 5 X 1 3...

    Sample Data Sample Data Hour Sample Taken Hour Sample Taken 1 4 5 X 1 3 1 42 2 3 4 5 6 2 39 36 25 60 28 53 22 56 41 34 43 45 59 42 36 40 45 39 48 26 42 34 61 48 45 29 3 31 61 38 40 54 26 38 42 37 41 53 37 47 41 37 29 20 26 43 38 33 37 37 35 33 36 41 25 37...

  • 1.)Ready Care is a specialized medical treatment care facility that has recently opened in the local...

    1.)Ready Care is a specialized medical treatment care facility that has recently opened in the local Wal-Mart. Currently, they offer assessments on common ailments as they are only staffed by nurse practitioners. The organization has decided to measure its process performance in terms of processing patients in a timely manner. The data for what was deemed a standard week is shown below. Patient 1 Patient 2 Patient 3 Patient 4 Monday 25 32 22 24 Tuesday 32 34 18 25...

  • Please answer this like right now West Battery Corp. has recently been receiving complaints from retailers...

    Please answer this like right now West Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 40 hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West....

  • ​​​​​​​Please solve and explain steps thanks A sample of 200 ROM computer chips was selected on each of 30 consecutive d...

    ​​​​​​​Please solve and explain steps thanks A sample of 200 ROM computer chips was selected on each of 30 consecutive days, and the number of nonconforming chips on each day was as follows: The data has been given so that it can be copied into R as a vecto. #### non.conforming = c(11, 21, 27, 16, 35, 17, 4, 22, 9, 22, 30, 18, 15, 21, 20, 19, 12, 23, 11, 22, 15, 16, 12, 26, 28, 14, 11, 17,...

  • The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...

    The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.9 4 95.48 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 1.0 8 95.44 0.3 9 95.08 0.2 9 10 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.5 15 95.04...

  • The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen...

    The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction​ times, measured in​ days, are as​ follows: b. Sample123456789 10 11 12 13 14 15 Mean 5 103 7 8 13 14 9 9 9 5...

  • West Battery Corp. has recently been receiving complaints from retailers that its​ 9-volt batteries are not...

    West Battery Corp. has recently been receiving complaints from retailers that its​ 9-volt batteries are not lasting as long as other name brands. James​ West, head of the TQM program at​ West's Austin​ plant, believes there is no problem because his batteries have had an average life of 5050 ​hours, about​ 10% longer than​ competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. ​ Nevertheless, he is concerned enough...

  • The Money Pit Mortoage Company is interested in monitoring the performance of the mortoage procees. Firieen...

    The Money Pit Mortoage Company is interested in monitoring the performance of the mortoage procees. Firieen samples of five compieted mortgage traneactions each were teken duing a period when the procees was beieved to be in control The times to complete the transsctons were meesured. The meens and ranges of the mongege process trensschon imes, measured in days, are as folows: Sample 1 2 3 4 9 10 11 12 13 14 15 Mean 13 11 5 14 12 13...

  • The time needed for checking in at a hotel is to be investigated. Historically, the process...

    The time needed for checking in at a hotel is to be investigated. Historically, the process has had a standard deviation equal to .146. The means of 39 samples of n = 20 are Sample Mean Sample Mean Sample Mean Sample Mean 1        3.86 11 3.88 21 3.84 31 3.88 2        3.90 12 3.86 22 3.82 32 3.76 3        3.83 13 3.88 23 3.89 33 3.83 4        3.81 14 3.81 24 3.86 34 3.77 5       ...

  • A lumber company makes plywood for residential and commercial construction. Every hour, five pieces of plywood...

    A lumber company makes plywood for residential and commercial construction. Every hour, five pieces of plywood are selected and the thicknesses are measured. The accompanying graphs are the control charts for the first 20 subgroup Suppose this process remained in control for the next 40 hours. The accompanying data are the thickness measurements for hours 41 through 43. Based on these data and the two control charts, what should be concluded about the pro Has the process gone out of...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT