Required:
1. Suppose Keller uses a traditional costing system with
machine hours as the cost driver. Determine the amount of overhead
assigned to each product line. (Do not
round intermediate calculations and round your final answers to the
nearest whole dollar amount.)
Sandy Beach Model | |
Rocky River Model | |
Total Overhead Cost |
2. Calculate the production cost per unit for each
of Keller’s products under a traditional costing
system.(Round your intermediate calculations and final
answers to 2 decimal places.)
Unit Cost:
3. Calculate Keller’s gross margin per unit for
each product under the traditional costing system. (Round
your intermediate calculations and final answers to 2 decimal
places.)
Gross Margin:
4. Select the appropriate cost driver for each
cost pool and calculate the activity rates if Keller wanted to
implement an ABC system. (Round your answers to 2 decimal
places.)
Setup Costs | ||
Quality Control | ||
Maintenance |
5. Assuming an ABC system, assign overhead costs
to each product based on activity demands.(Round your
intermediate calculations to 2 decimal places and final answers to
the nearest whole dollar amount.)
Setup Costnot
Quality Controlnot
Maintenancenot
Total Overhead Cost
6. Calculate the production cost per unit for each
of Keller’s products with an ABC system. (Round your
intermediate calculations and final answers to 2 decimal
places.)
Unit Cost:
7. Calculate Keller’s gross margin per unit for
each product under an ABC system. (Round your intermediate
calculations and final answers to 2 decimal places.)
Gross Margin:
8. Compare the gross margin per unit of each
product under the traditional system and ABC. (Round your
answers to 2 decimal places.)
Gross Margin (Traditional) | ||
Gross Margin (ABC) |
Required: 1. Suppose Keller uses a traditional costing system with machine hours as the cost driver....
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.60 $ 27.30 Direct labor cost per unit 13.20 17.20 Sales price per unit 82.10 105.00 Expected production per month 1,250 units 950 units Keller has monthly overhead of $12,203, which is divided into the following cost pools: Setup costs $ 3,100 Quality control 5,487 Maintenance 3,616 Total $ 12,203...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 19.30 $ 26.60 Direct labor cost per unit 14.80 19.10 Sales price per unit 83.40 105.00 Expected production per month 1,200 units 910 units Keller has monthly overhead of $11,104, which is divided into the following cost pools: Setup costs $ 2,400 Quality control 5,766 Maintenance 2,938 Total $ 11,104...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach $19.00 Rocky River $ 27.40 17.30 106.e0 Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 14.60 82.30 1,210 units 910 units Keller has monthly overhead of S11,716, which is divided into the following cost pools: $ 2,135 5,626 3,955 $ 11,716 Setup costs Quality control Maintenance Total The company...
Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $19.10 15.10 83.70 1,240 units Rocky River $ 27.20 18.40 105.00 920 units Keller has monthly overhead of $11,756, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 3,050 5,400 3,306 $ 11,756 The...
PA4-4 (Algo) Selecting Cost Drivers, Assigning Costs Using Activity Rates [LO 4-1,4-3, 4-4, 4-6) Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per $18.90 $ 27.00 unit Direct labor cost per unit 14.60 17.90 Sales price per unit 82.40 106.00 Expected production per month 1, 230 units 980 units Keller has monthly overhead of $12,306, which is divided into the following cost...
Pre-Built Problems Keller Company makes two models of battery operated boats, the Sandy Beach and the Rocky River Basic production information follows: Sandy Beach $19.60 HI 14.00 Rocky Riven 27.20 16. Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month 920 units Keller has monthly overhead of 511,632, which is divided into the following cost pools Quality control Maintenance Total The company has also compiled the following information about the chosen...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Rocky River $ 27.10 Sandy Beach Direct materials cost per unit $19.30 Direct labor cost per unit 13.30 Sales price per unit 83.90 Expected production per month 1, 240 units 18.60 105.00 9 10 units Keller has monthly overhead of $11,466, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 1,920 6,212 3, 335 $...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $18.70 15.10 82.70 1,150 units Rocky River $ 28.10 18.90 106.00 960 units Keller has monthly overhead of $10,844, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 2,600 5,220 3,024 $ 10,844 The company...
Direct materials cost per unit Direct labor cost per unit Sales price per unit Expected production per month Sandy Beach $18.50 14.20 83.70 1,220 units Rocky River $ 26.20 17.60 105.ee 990 units Keller has monthly overhead of $11.446, which is divided into the following cost pools: Setup costs Quality control Maintenance Total $ 2,790 5,506 3,150 $ 11,446 The company has also compiled the following Information about the chosen cost drivers: Sandy Beach Rocky River Number of setups Number...
Keller Company makes two models of battery-operated boats, the Sandy Beach and the Rocky River. Basic production information follows: Sandy Beach Rocky River Direct materials cost per unit $ 20.00 $ 27.70 Direct labor cost per unit 14.90 17.40 Sales price per unit 83.10 105.00 Expected production per month 1,200 units 980 units Keller has monthly overhead of $11,245, which is divided into the following cost pools: Setup costs $ 1,920 Quality control 6,077 Maintenance 3,248 Total $ 11,245...