2) Point A is located at the middepth of a 3.6 m-thick clay layer. The clay is overlain by a 7.5 m-thick sand layer. The grou
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Hand Calculations are given in following images.

GE A zokn ml y sand 7.5m 3.6 m 19 km a) Total, porevater & effective stress at point A When water table at 3m above sand laye9 81 - UA-A - Dw x H = 9.81x1.8 = 17.65 kN/m2 TA-AE TA-A-UA-A SAA = 166.54 - 17.65 = 148.89 kN/m2 JA-A when water table 3 m a

Reply for querries if any

Add a comment
Know the answer?
Add Answer to:
2) Point A is located at the middepth of a 3.6 m-thick clay layer. The clay...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. A future development site is to be preloaded with a 310 kPa surface surcharge to reduce potent...

    2. A future development site is to be preloaded with a 310 kPa surface surcharge to reduce potential settlements in a 12.5-m thick soft clay layer. The soft clay is overlain by a 3-m thick sand layer and underlain by permeable bedrock. The groundwater table is at the sand-clay interface. A sample of the soft clay was extracted from a depth of 9 m and a 1D consolidation and compression test was conducted. Compression data obtained from the test are...

  • A soil profile consists of a clay layer underlain by a sand layer, as shown in...

    A soil profile consists of a clay layer underlain by a sand layer, as shown in figure. If a tube is inserted into the bottom sand layer and the water level rises to 1m above the ground surface, determined the vertical effective stresses and porewater pressures at A, B, and C. if ko is 0.5, determine the effective and total lateral stresses at A, B, and C. what is the value of the value of the porewater pressure at A...

  • geotechnical engineering The soil profile at a site consists of a clay layer 10 m thick,...

    geotechnical engineering The soil profile at a site consists of a clay layer 10 m thick, sandwich between two sand layers. The top sand layer has a density of 1.9 Mg/m² and is 5 m thick. Below this layer is a 10 m thick clay layer with a saturated density of 1.8 Mg/m' and a saturated water content 42%. The deeper sand layer has a saturated density of 1.9 Mg/m² and extend to the depth investigated at the site. The...

  • For the soil strata, draw diagrams indicating the total stress, pore pressure and effective stress profiles...

    For the soil strata, draw diagrams indicating the total stress, pore pressure and effective stress profiles to the bottom of clay layer. Fine sand has a thickness of 6 m (FST) with saturated unit weight of 18 kN/m2. Clay has a thickness of 8 m with saturated unit weight of 14 kN/m3 The water table is located at depth of 0.7 of fine sand thickness below the ground surface (i.e. depth=0.7*FST). Fine sand will sustain capillarity (suction). Assume the same...

  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The water table is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m3 and a saturated unit weight of 18 kN/m3. The capillary rise in the sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m3....

  • A levee is constructed atop a 3m thick clay layer resting atop a sand layer. During...

    A levee is constructed atop a 3m thick clay layer resting atop a sand layer. During a storm event, the levee retains water and the soil at the bottom of the channel is sand that is hydraulically connected to the sand beneath the clay. Head loss in the sand layer is negligible (i.e., the total head at point A is the same as the total head at point B), and water flows vertically upward through the clay. The water table...

  • 1. (25 points) The soil profile at a site consists of a layer of fine sand...

    1. (25 points) The soil profile at a site consists of a layer of fine sand 5 m thick above a layer of clay 4 m thick. Below the clay is a layer of impermeable rock. The groundwater table was observed at 2 m below ground level. The unit weight of the sand above and below the water table is 20 KN/m'. The water content of the clay is 25% and its dry unit weight is 15 KN/m'. The compression...

  • A 2-m clay layer (e = 0.92, G = 2,72. Cc = 1/3) is overlain with...

    A 2-m clay layer (e = 0.92, G = 2,72. Cc = 1/3) is overlain with 3-m thick of sand layer (e =05, G = 2.62, w = 0). The water table is 15 m bel the ground (sand) surface. If a 3-m thick land fill (r = 17.3 kN/m2) is placed over the existing ground surface, compute the consolidation settlement in mm of the clay layer. (The clay is normally consolidated; final answer should be rounded-off to one decimal...

  • 7) (Total 20 pts) The figure shows a 20 m thick layer of normally consolidated clay...

    7) (Total 20 pts) The figure shows a 20 m thick layer of normally consolidated clay (Y -18.6 kN/m3) that is one-dimensionally loaded by Δσ,-50kPa. The clay layer is below a 3 m thick layer of granular fill (y = 19.6 kN/m3), and a dense, compacted glacial till (impermeable) underlies the clay. The water table is located at the top of the clay layer. A 1-D consolidation test is performed on a 2.20 cm thick, doubly drained specimen from the...

  • A 2-m thick of compacted soil of unit weight 20 kN/m3 will be placed on the top of the ground surface. Δσ y...

    A 2-m thick of compacted soil of unit weight 20 kN/m3 will be placed on the top of the ground surface. Δσ y 14.0 kN/m3 3.0 m Sand Y 17.5 kN/m3 2.0 m 3.0m A Soft clay y= 13.5 kN/m3 6.0 m Medium clay y=15.0 kN/m3 B 4.0 m Bedrock a) Before placing the compacted soil, what are the overconsolidation ratios (OCR) for point A and B? b) When placing the compacted soil, what external load Ag would be? c)...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT