Question

Which of the following standard cost variances would usually be least controllable by a production supervisor? Multiple Choic

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer- The following standard costing variances would usually be least controllable by a production supervisor – Fixed overhead volume variance.

Add a comment
Know the answer?
Add Answer to:
Which of the following standard cost variances would usually be least controllable by a production supervisor?...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of...

    Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 6,000 computers: Actual: Variable factory overhead $170,200 Fixed factory overhead 57,500 Standard: 6,000 hrs. at $35 210,000 If productive capacity of 100% was 10,000 hours and the total factory overhead cost budgeted at the level of 6,000 standard hours was $233,000, determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate...

  • Rogen uses the standard cost system. The Static original budgeted production was 5,000 units for October....

    Rogen uses the standard cost system. The Static original budgeted production was 5,000 units for October. The Input standards were: Std Quantity x Std Price per input =Std Cost per Output U Direct materials 1 lb./Output unit x $7/b. = $7 per output unit Direct labor 1.6 hrs. /Output unit x $12/hr. = $19.20 per unit Variable manufacturing (Mfg.) overhead 1.6 hrs. x $7.50 per hr = $12 per unit Fixed mfg. overhead (Budget $20,000) 1.6 hrs.. x $2.50 per...

  • Mastery Problem: Manufacturing Cost Variance (Actual Costs Compared to Standard Costs) Manufacturing cost variances may come...

    Mastery Problem: Manufacturing Cost Variance (Actual Costs Compared to Standard Costs) Manufacturing cost variances may come from material costs that are higher or lower than expected, material usage that is not what was expected, higher or lower labor costs than expected, or more or less time spent to produce an item than expected. Overhead cost and volume variances are another cause for costs to be higher or lower than what was expected. The total manufacturing variance can be broken down...

  • I have completed 1and 2, but I need help with number 3 (compute overhead controllable volume variances) Required...

    I have completed 1and 2, but I need help with number 3 (compute overhead controllable volume variances) Required information [The following information applies to the questions displayed below Trico Company set the following standard unit costs for its single product Direct materials (30 Ibs.$4.80 per Ib.) Direct labor (7 hrs. @ $14 per hr. Factory overhead-variable (7 hrs. $6 per hr.) Factory overhead-fixed (7 hrs.$9 per hr) Total standard cost $ 144.0 98.00 42.00 63.00 $ 347.00 The predetermined overhead...

  • 2. Compute the direct labor cost variance, including its rate and efficiency variances. Standard Cost Actual...

    2. Compute the direct labor cost variance, including its rate and efficiency variances. Standard Cost Actual Cost $ $ 0 0 0 0 3. Compute the overhead controllable and volume variances. Controllable Variance Actual overhead Budgeted overhead Controllable variance Fixed overhead volume variance Budgeted fixed overhead Fixed overhead cost applied Fixed overhead volume variance Check my work 1 ! Required information 12.5 [The following information applies to the questions displayed below.] points Trico Company set the following standard unit costs...

  • Rogen uses the standard cost system. The Static original budgeted production was 5,000 units for October....

    Rogen uses the standard cost system. The Static original budgeted production was 5,000 units for October. The Input standards were: Std Quantity * Std Price per input =Std Cost per Output U Direct materials 1 lb./Output unit x $7/lb. = $7 per output unit Direct labor 1.6 hrs. /Output unit x $12 /hr. = $19.20 per unit Variable manufacturing (Mfg.) overhead 1.6 hrs. * $7.50 per hr = $12 per unit Fixed mfg. overhead (Budget $20,000) 1.6 hrs.. x $2.50...

  • Ander's Clothing manufactures embroidered jackets. The company uses a standard cost system to control manufacturing costs....

    Ander's Clothing manufactures embroidered jackets. The company uses a standard cost system to control manufacturing costs. The following data represent the standard unit cost of a​ jacket:   i Data Table $4.15 per sq. ft.) Direct materials 3.0 sq. ft x 12.45 Direct labor $9.70 per hour) ( 2,0 hours x 19.40 Manufacturing overhead: Variable 2.0 hours x $0.68 per hour) 1.36 4.40 5.76 2.0 hours x $2.20 per hour) Fixed 37.61 Total standard cost per jacket Fixed overhead in total...

  • Rogen uses the standard cost system. The Static original budgeted production was 5,000 units for October....

    Rogen uses the standard cost system. The Static original budgeted production was 5,000 units for October. The Input standards were: Std Quantity x Std Price per input =Std Cost per Output U Direct materials 1 lb./Output unit x $7/lb. = $7 per output unit Direct labor 1.6 hrs. /Output unit x $12/hr. = $19.20 per unit Variable manufacturing (Mfg.) overhead 1.6 hrs. x $7.50 per hr = $12 per unit Fixed mfg. overhead (Budget $20,000) 1.6 hrs.. x $2.50 per...

  • Flandro Company uses a standard cost system and sets its predetermined overhead rate on the basis of direct labor-hours.

    Flandro Company uses a standard cost system and sets its predetermined overhead rate on the basis of direct labor-hours. The following data are taken from the company’s planning budget for the current year: Required: Create a new standard cost card that separates the variable manufacturing overhead per unit and the fixed manufacturing overhead per unit.Compute the materials price and quantity variances. Also, compute the labor rate and efficiency variances.Compute the variable overhead rate and efficiency variances. Also, compute the fixed overhead budget...

  • Direct Material Variances Goldman, Inc. is a manufacturer of lead crystal glasses. The standard direct materials quantit...

    Direct Material Variances Goldman, Inc. is a manufacturer of lead crystal glasses. The standard direct materials quantity is 0.7 pounds per glass at the cost of $0.35 per pound. The actual result for one month’s production of 6,950 glasses was 1.3 pounds per glass, at the cost of $0.45 per pound. Calculate the direct materials cost variance and the direct materials efficiency variance. Direct Labour Variances Goldman, Inc. manufactures lead crystal glasses. The standard direct labor time is 0.5 hours...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT