Ander's Clothing manufactures embroidered jackets. The company uses a standard cost system to control manufacturing costs. The following data represent the standard unit cost of a jacket:
Ander's Clothing manufactures embroidered jackets. The company uses a standard cost system to control manufacturing costs....
Pender Awning manufactures awnings and uses a standard cost system. The company allocates overhead based on the number of direct labor hours. The following are the company's cost and standards data: Click the icon to view the standards.) Actual cost and operating data from the most recent month are as follows: B Click the icon to view the actual results.) All manufacturing overhead is allocated on the basis of direct labor hours. Read the requirements. Requirement 1. Calculate the standard...
Purchased 41,800 yards at a total cost of $434,720 Used 38,800 yards in producing 1,900 awnings Actual direct labor cost of $67,100 for a total of 5,500 hours Actual variable MOH $22,550 Actual fixed MOH $47,800 Standards: Direct materials 21.0 yards per awning at $11.00 per yard Direct labor 3.0 hours per awning at $12.00 per hour Variable MOH standard rate $4.00 per direct labor hour Predetermined fixed MOH standard rate $8.00 per direct labor hour Total budgeted fixed MOH...
Standard Price and Volume Standards: Direct materials 21.0 yards per awning at $15.00 per yard Direct labor 5.0 hours per awning at $17.00 per hour Variable MOH standard rate $4.00 per direct labor hour Predetermined fixed MOH standard rate $7.00 per direct labor hour Total budgeted fixed MOH cost $78,200 Print Done X Actual Results 1 Purchased 51,750 yards at a total cost of $755,550 Used 47,500 yards in producing 2,300 awnings Actual direct labor cost of $194,256 for a...
Smith Recliners manufactures leather recliners and uses flexible budgeting and a standard cost system. Smith allocates overhead based on yards of direct materials. The company's performance report includes the following selected data: (Click the icon to view the selected data.) Read the requirements Requirement 1. Prepare a flexible budget based on the actual number of recliners sold. (Round budget amounts per unit to the nearest cent.) 980 Smith Recliners Flexible Budget Budget Amounts per Unit Actual Units (Recliners) Sales Revenue...
help asap please Actual cost and operating data from the most recent month are as follows: EE (Click the loon to view the actual rosults) All manufacturing overhead is allocated on the basis of direct labor hours Pratt Awning manufactures awnings and uses a standard cost systom. The company allocatos overhoed based on the number of direct labor hours. The following are the company's cost and standards data: Read the requirements Requirement 1. Caloulate the standard cost of one awning...
Ceramics Etc. is a manufacturer of large flower pots for urban settings. The company has these standards: i Standard Price and Volume Direct materials (resin) 12 pounds per pot at a cost of $3.00 per pound 2.0 hours at a cost of $15.00 per hour Direct labor Standard variable manufacturing overhead rate $3.00 per direct labor hour Budgeted fixed manufacturing overhead $27,400 $8.00 per direct labor hour (DLH) Standard fixed MOH rate - X Actual Results Ceramics Etc. allocated fixed...
select from formulas given above Headsound manufactures headphone cases. During September 2018, the company produced and sold 108,000 cases and recorded the following cost data: (Click the icon to view the cost data) Read the requirements. Requirement 1. Compute the cost and efficiency variances for direct materials and direct labor. Begin with the cost variances. Select the required formulas, compute the cost variances for direct materials and direct labor, and identify whether each variance is favorable (F) or unfavorable (U)....
P23-31B (similar to) budget and a standard cost system White allocaties overhead based on yards of direct The company's performance reportedades the following selected data White Recliners manufactures the recensind se Click the icon to view the selected data) Read the rent Requirement 1. Prepare a feble budget based on the actual number of rediners sold round budget amounts per unit to the nearest cont.) White Recliners Flexible del Sales Revue Vari a ntacturing Costs Direct Materal Dired labor Variable...
X Data Table 1 Standard Cost Information Quantity Cost 0.15 per part Direct Materials 2 parts 0.02 hours Direct Labor 9.00 per hour Variable Manufacturing Overhead 0.02 hours 9.00 per hour Fixed Manufacturing Overhead ($31,360 for static budget volume of 98,000 units and 1,960 hours, or $16 per hour) Actual Cost Information $ 0.20 per part) $ 42,200 (211,000 parts@ Direct Materials $ 9.15 per hour) Direct Labor (1,660 hours@ 15,189 Variable Manufacturing Overhead 10,000 Fixed Manufacturing Overhead 30,000 Print...
Mastery Problem: Manufacturing Cost Variance (Actual Costs Compared to Standard Costs) Manufacturing cost variances may come from material costs that are higher or lower than expected, material usage that is not what was expected, higher or lower labor costs than expected, or more or less time spent to produce an item than expected. Overhead cost and volume variances are another cause for costs to be higher or lower than what was expected. The total manufacturing variance can be broken down...