Question

1. What is the maximum capacity per shift (in good units) of a particular processing machine given the following information
0 0
Add a comment Improve this question Transcribed image text
Answer #1

The answer is properly described as follows :

hipt avid Unload) 44 secDend on (in Ore shift 2580 o a 815 mi.

Add a comment
Know the answer?
Add Answer to:
1. What is the maximum capacity per shift (in good' units) of a particular processing machine...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A process has two stages. In the first stage, a machine makes two components, call them type A and B. It takes 250 seco...

    A process has two stages. In the first stage, a machine makes two components, call them type A and B. It takes 250 seconds to switch production between the component types. During that time no production occurs. When in production, each component (A or B) requires 0.6 seconds to be completed. In the second stage, the components, A and B, are assembled to make a final product, call it C. The assembly stage can combine the two components into 1...

  • PA 7-2 (Algo) A machine makes two components; call... A machine makes two components; call themn...

    PA 7-2 (Algo) A machine makes two components; call... A machine makes two components; call themn types A and B. It takes 550 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components...

  • Fresh out of school, you take a job with a small injection-molding shop with two machines...

    Fresh out of school, you take a job with a small injection-molding shop with two machines (25 ton and 250 ton. On any given shift, there are two workers assigned to each machine one is concerned with setting/loading and unloading while the other packages the final product for shipping. You have been asked to investigate whether you can improve the process, potentially with automation. Having recently re-read The Goal, you are quite aware that adding robots does not necessarily mean...

  • Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following...

    Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units actual run time this week! Machine time available per week Actual run rate this wook Ideal run rate Defect-free output this week Total output this week (including defects 4,900 minutes 7.003 minutes 3.8 units per minute 4.0 units per minute 15.827 units 18,620 units Book Required: 1....

  • Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following...

    Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units Actual run time this week Machine time available per week Actual run rate this week Ideal run rate Defect-free output this week Total output this week (including defects) 5.696 minutes 6,400 minutes 1.68 units per minute 2.00 units per minute 12,670 units 18,100 units Required: 1. Compute...

  • A machine makes two components, call them type A and B. It takes 200 seconds to...

    A machine makes two components, call them type A and B. It takes 200 seconds to switch production between the component types. During that time no production occurs. When in production, each unit of A or B requires 0.55 seconds to be completed The two components, A and B are combined in an assembly process to make a final product, call it C. The assembly step can combine the two components into 1 unit every 1.85 seconds, or 32.43 units...

  • Beamer Corporation produces one product and it seems that the demand for that product is exceeding...

    Beamer Corporation produces one product and it seems that the demand for that product is exceeding their manufacturing capacity. Below is the information concerning the machine that produces their product Actual run time this week Machine time available per week Actual run rate this week Ideal run rate Defect-free output this week Total output this week (including defects) Beamer's overall equipment effectiveness (OEE) was approximately 3,000 Minutes 5, eee Minutes 3.2 Units per minute 4 Units per minute 7,200 Units...

  • number. Umit the "> sign in your response.) Total processing time in minutes per machine: Number...

    number. Umit the "> sign in your response.) Total processing time in minutes per machine: Number of each machine needed and total cost A (Click to select) B (Click to select) ) C (Click to select) ) Buy (Click to select): (Click to select) machines. b. Consider this additional information: The machines differ in terms of hourly operating costs: The A machines have an hourly operating cost of $10 each, B machines have an hourly operating cost of $11 each,...

  • Kilmer Company has demand for its only product that exceeds its manufacturing capacity. The company provided...

    Kilmer Company has demand for its only product that exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units points Skipped Actual run time this wook Machine time available per week Actual run note this week Ideal run rate Defect-free output this week Total output this week (including defects) 6,600 minutes 11,000 minutes 5.1 units per minute 6 units per minute 23,562 units 33,660...

  • Part I A full shift of production was scheduled to run on machine X. Production was stopped for 2...

    just #3 Part I A full shift of production was scheduled to run on machine X. Production was stopped for 20 minutes due to a machine failure, 10 minutes for a bin change, 30 minutes for a quality concern requiring a tool repair. Assumptions: A) A day- 8 hours with 20 minutes break time B) A total of 1200 parts is processed per day and only 6 is rejected/scraped C)- The ideal cycle time established by engineering or the equipment...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT