A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a...

A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a straight blade. The
material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%,
from bank to loose state. The center-of mass-to -center-of-mass pushing distance is 195 ft. Job efficiency
can be assumed to be equivalent to a 50-min hour. Calculate the production in bcy per hour and the direct
cost of the proposed earthmoving operation in dollars per bcy. The company’s normal O&O cost for these
machines is $92.00 per hour and the operator’s wage is $18.00 per hour plus 35% for fringes, insurance,
and worker’s compensation. Show all the required calculations
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Ans: - To calculate the production of the 240 hp dozer. productionſ icy per 60-min ho ] a = nel-hp x 330 D+50 Here Net hepp icalculate the material weight confection factor :- material weight correction factoo - standand condition soil density cosectcalculate the total cost as follows :- Oando = 42 operaloo = 4:18 +0.35 (18) - 24:3 total cost = cand o cost + operator cost

Add a comment
Know the answer?
Add Answer to:
A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, nonc...

    7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft...

  • A contractor works to explore using a 7U blade on a 240 hp dozer. The material...

    A contractor works to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft of...

  • Can you please solve this one. A contractor wants to explore using a 7U blade on...

    Can you please solve this one. A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft...

  • a contractor wants to investigate th production and cost differences of using a 7S blade on...

    a contractor wants to investigate th production and cost differences of using a 7S blade on a D7H dozer os an S blade on an 824 dozer. The material is very sticky and is to be moved a distance of 200 ft from the beginning of the cut. The dozing is uphill on a 5% grade. The operator will have average skill, the dozers have power-shift transmissions, and traction is assumed to be satisfactory. The site conditions will be good...

  • (20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used...

    (20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used in a slot-dozing operation. The material is dry, non-cohesive silty sand and is to be moved a distance of 250 ft from the beginning of the cut. Dozing is uphill on 4% grade. The operator will have average skill, the tractor will have a power-shift transmission, and both visibility and traction are assumed to be satisfactory. The material weighs 110 pcf in the bank...

  • (50) 7. Analyze the following operation. A 385C Excavator will be used to load material into a CAT 740 (no ejector) articulated truck. The excavator is equipped with a 6 cy heaped bucket and is...

    (50) 7. Analyze the following operation. A 385C Excavator will be used to load material into a CAT 740 (no ejector) articulated truck. The excavator is equipped with a 6 cy heaped bucket and is capable of cycling every 30 seconds. The material being loaded weighs 3,300 lbs cy. The job efficiency is 90%. The trucks will be hauling the nmaterial 4000 feet over a road with a total rolling resistance of 9% to the dumpsite and 10% total rolling...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT