Question

7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must

0 0
Add a comment Improve this question Transcribed image text
Answer #1

A Contacto cuants -to explore uding a u Blade a unversa Connect on the n se weZght.dte matria./ 26671bstardard Conditi on s 300lbl 652 frDm -the table Coriec tron facto aze dejisned to Cut matonral and dSen DdvisibiThe arome numbeag oRatin el ba The job efiden 50-min hour it is machine rGSio 4cfo lade Aoju stment acto un favala ble Gradefacto 0.66 863 b 9 06 Retamine the di ect unit Poductiaat lireet foductrm Cast 2S3 b

Add a comment
Know the answer?
Add Answer to:
7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, nonc...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A contractor works to explore using a 7U blade on a 240 hp dozer. The material...

    A contractor works to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft of...

  • Can you please solve this one. A contractor wants to explore using a 7U blade on...

    Can you please solve this one. A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft...

  • a contractor wants to investigate th production and cost differences of using a 7S blade on...

    a contractor wants to investigate th production and cost differences of using a 7S blade on a D7H dozer os an S blade on an 824 dozer. The material is very sticky and is to be moved a distance of 200 ft from the beginning of the cut. The dozing is uphill on a 5% grade. The operator will have average skill, the dozers have power-shift transmissions, and traction is assumed to be satisfactory. The site conditions will be good...

  • A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a...

    A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%, from bank to loose state. The center-of mass-to -center-of-mass pushing distance is 195 ft. Job efficiency can be assumed to be equivalent to a 50-min hour. Calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation...

  • (20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used...

    (20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used in a slot-dozing operation. The material is dry, non-cohesive silty sand and is to be moved a distance of 250 ft from the beginning of the cut. Dozing is uphill on 4% grade. The operator will have average skill, the tractor will have a power-shift transmission, and both visibility and traction are assumed to be satisfactory. The material weighs 110 pcf in the bank...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT