7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, nonc...
A contractor works to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft of...
Can you please solve this one.
A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft...
a contractor wants to investigate th production and cost
differences of using a 7S blade on a D7H dozer os an S blade on an
824 dozer. The material is very sticky and is to be moved a
distance of 200 ft from the beginning of the cut. The dozing is
uphill on a 5% grade. The operator will have average skill, the
dozers have power-shift transmissions, and traction is assumed to
be satisfactory. The site conditions will be good...
A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%, from bank to loose state. The center-of mass-to -center-of-mass pushing distance is 195 ft. Job efficiency can be assumed to be equivalent to a 50-min hour. Calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation...
(20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used in a slot-dozing operation. The material is dry, non-cohesive silty sand and is to be moved a distance of 250 ft from the beginning of the cut. Dozing is uphill on 4% grade. The operator will have average skill, the tractor will have a power-shift transmission, and both visibility and traction are assumed to be satisfactory. The material weighs 110 pcf in the bank...