7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft...
A contractor works to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft of...
a contractor wants to investigate th production and cost
differences of using a 7S blade on a D7H dozer os an S blade on an
824 dozer. The material is very sticky and is to be moved a
distance of 200 ft from the beginning of the cut. The dozing is
uphill on a 5% grade. The operator will have average skill, the
dozers have power-shift transmissions, and traction is assumed to
be satisfactory. The site conditions will be good...
(20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used in a slot-dozing operation. The material is dry, non-cohesive silty sand and is to be moved a distance of 250 ft from the beginning of the cut. Dozing is uphill on 4% grade. The operator will have average skill, the tractor will have a power-shift transmission, and both visibility and traction are assumed to be satisfactory. The material weighs 110 pcf in the bank...
A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%, from bank to loose state. The center-of mass-to -center-of-mass pushing distance is 195 ft. Job efficiency can be assumed to be equivalent to a 50-min hour. Calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation...
Please solve problem 1 and show formulas used
Tables for reference:
Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...