(20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used in a slot-dozing operation. The material i

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Hi,

Solution as follows:

  1. Assumptions:

Since the datasheet is not available with the question, we are making below assumptions in order to estimate the cost:

  1. Max Speed – Forward = 6.6 mph
  2. Operating Speed on the project (Average skill operator and 4% uphill) = 80% of the max speed = 5.28 mph
  3. Max speed – Reverse = 8.8 mph
  4. Blade Capacity ­– 11.4 yd3
  5. Operating weight = 87400 lbs
  6. Time for ramp up = 6 seconds
  7. Time for maneuver = 3 seconds
  1. Conversion of Bank Volume to Loose Volume:

Swell factor = 14%

1 BCY (Bank cubic yards) = 1.14 LCY (Loose cubic yards)

  1. Check for carrying capacity by weight:

Loose capacity = 11.4 yd3

Bank Capacity = 11.4/1.14 = 10 yd3

Soil density = 110 pcf

Soil Weight = 10 x 110 x 27 = 29700 lbs

Since the weight of soil is less than the operating weight, it can carry 10 BCY (11.4 LCY) of earth.

  1. Calculation of time required for each trip:

Average Distance = 250 ft

Forward Speed = 5.28 mph = 5.28 x 1.4667 = 7.744 ft / sec

Reverse Speed = 8.8 mph = 8.8 x 1.4667 = 12.907 ft / sec

Forward time = 250/7.744 = 32.28 sec

Reverse time = 250/12.907 =19.37 sec

Time for ramp up = 6 seconds

Time for maneuver = 3 seconds

Total time for one trip = 32.28 + 19.37 + 6 +3 = 60.65 seconds

  1. Calculation of BCY Moved in one hour:

Job efficiency = 45 min per hour

Time required for one trip = 60.65 seconds

45 x 60 No.of trips in one hour = 60.65 = 44.518 trips

BCY moved in one hour = 44.518 x 10 = 445.18 BCY per hour

  1. Calculation of BCY per hour Cost:

Tractor cost per hour = $45.50

Operator cost per hour = $12.70

Total Cost per hour = $45.50 + $12.70 = $58.20 per hour

58.20 Cost of earth moving (S/BCY) = 245,18 = $0.131 per BCY

Hope the solution provided above is clear. In case of any clarifications, please leave comment in comments section.

Please give us a good rating, if you are satisfied with the response.

How would you rate our reply?

Keep Chegging

Best Regards

Chegg Expert Team

Add a comment
Know the answer?
Add Answer to:
(20 points) A D8T crawler D8H crawler tractor with a universal blade is to be used...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • a contractor wants to investigate th production and cost differences of using a 7S blade on...

    a contractor wants to investigate th production and cost differences of using a 7S blade on a D7H dozer os an S blade on an 824 dozer. The material is very sticky and is to be moved a distance of 200 ft from the beginning of the cut. The dozing is uphill on a 5% grade. The operator will have average skill, the dozers have power-shift transmissions, and traction is assumed to be satisfactory. The site conditions will be good...

  • 7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, nonc...

    7.7 A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft...

  • A contractor works to explore using a 7U blade on a 240 hp dozer. The material...

    A contractor works to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft 1 in with 3.25 ft of...

  • Can you please solve this one. A contractor wants to explore using a 7U blade on...

    Can you please solve this one. A contractor wants to explore using a 7U blade on a 240 hp dozer. The material is a dry, noncohesive silty sand and must be moved a distance of 200 ft from the beginning of the cut. It is estimated the material will swell 4%, from bank to loose state. Both visibility and traction should be satisfactory. Job efficiency is assumed to be equivalent to a 50-min hour. The U-blade width is 13 ft...

  • A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a...

    A 240 hp (power-shift) dozer is used in pushing operation. The dozer is equipped with a straight blade. The material (dry and noncohesive) weighs 98 pcf in the bank state. It is estimated the material will swell 6%, from bank to loose state. The center-of mass-to -center-of-mass pushing distance is 195 ft. Job efficiency can be assumed to be equivalent to a 50-min hour. Calculate the production in bcy per hour and the direct cost of the proposed earthmoving operation...

  • on and Volume Change: 10 points An earthwork project has the following conditions: Borrow Site -soil...

    on and Volume Change: 10 points An earthwork project has the following conditions: Borrow Site -soil density is 120 PCF with water content w = 15% Fill Site soil density is 135 PCF with water content w 17 % - Unit weight of water: 8.34 lb per gallon a. How many gallons of water must be added to the borrow per cubic yard and 20 Points ph 4. Dozer Production material pped per hour (9CHd atteched Cat Estinated Ripper Prd...

  • Accountancy

    A contractor plans to use a crawler tractor that is being used to move 5,000 BCY of soil 500 feet horizontally in a 50 minute working hour. The soil has a swell of 15%. The tractor has a straight blade 10 feet long and 4 feet high. The average width of the base of the soil pile in front of the blade has been measured to be about 5 feet. Assume that the tractor travels in first gear forward at...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT