Question

Problem Statement You are the manager of a workshop. You need to turn 1,500 shafts as an intermediate step in a larger manufa
0 0
Add a comment Improve this question Transcribed image text
Answer #1

1/12 1:39 No. : Date : 1 | Whatever) be culling a basic formulae ? as speed for and total cool life cost is given Total costDate : Date: TT W 1 1 A case 1 LHSS tool at 15 m/min - cost of 1 (same material for all cases) Total no of shafts x lost hirT il Total time required Total machining time polal tool change time a Tootal set up time • 1500 x 20 mins + (No of tools & TPage No. : Date : 17 12. Podal tost 20+@3 + + 250 DARCase 2. . Combide tool at 15 m/min Main differences from case 1. Material cost is same. - = From One * 3,15,000 DAR > 0 A : c- Labour cost will change sinu time for tool change differs. Tolal time. Tofal machining time & C No of tools a Time nor toolPank: © ... Hiisis dissa I No of tools for uss. For this we nud cool life Quin Jussat 11.5 mlmin. • Using equation Nut & NataL A No of tools for uss Machining Time (Total) Tool like a 1500 x 20 min 21,716:24 17. 48 min ~ 1717 tools No of tools for caI Part ③ ca - Answer Part 0 First Hall is 2 12,11, 250 QAR |||||||||| co Answe is part 7 Second hall 11,14,050 QAR , I wringlost of labour will change since maching time will chang is mlmin it takes 20 min M.S m/min 2 x. ce At AL xx15 2 17.5x20 x -(d) Larbidi tool at od 11.5 m/min. Machining time from (6) in b il i Part 0 in it 223-33 min Total time Machining time eschpFrege N). Date: of Material Tooded cost 2 cost of bool í 3,75,000 Always some 155 x 50 7750 DAR > Total cost - 0 + © © © . 3.

Add a comment
Know the answer?
Add Answer to:
Problem Statement You are the manager of a workshop. You need to turn 1,500 shafts as...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 15 Points In one workshop, five holes (12 mm diameter) need to be drilled in a...

    15 Points In one workshop, five holes (12 mm diameter) need to be drilled in a 50 mm thick steel plate. Three holes are blind with 30 mm deep, while the other two holes are through holes. At the moment there is only one drill available in the workshop with a tool diameter of 12 mm and point angle of 1180. The available tool can achieve a tool life of 1 minute at a cutting speed of 16 m/min using...

  • a) A workpiece (φ-75 mm, 1 275 mm) is machined using turning at a feed rate of 0.25 mm/rev. At a cutting speed- 3.5 m/s, the turning tool is ineffective after machining 3 parts, and at a cutting s...

    a) A workpiece (φ-75 mm, 1 275 mm) is machined using turning at a feed rate of 0.25 mm/rev. At a cutting speed- 3.5 m/s, the turning tool is ineffective after machining 3 parts, and at a cutting speed = 2.5 m/s, the turning tool is effective for producing 20 parts. Calculate the Cutting Speed that will allow 30 parts to be machined between tool changes [20 marks] b) An aluminium alloy workpiece (tensile strength - 325 N/mm2 and yield...

  • Please solve 23.15 thank you! 3.14 (SI units) Solve the previous problem except that in partToo...

    Please solve 23.15 thank you! 3.14 (SI units) Solve the previous problem except that in partToo ting (a), determine the cutting speed for minimum cost. 23.15 (uSCS units) Cemented carbide inserts are used to turn 21.0 in and diameter = 4.0 in. Feed the a part with length incre that f what produ 0.015 in/rev. The parameters in the Taylor equation are n = 0.25 and C =800 (ft/nin) The operator and machine tool rate = S45.00/hr. and the tooling...

  • Problem 1 Consider the drilling of Feature 3 (Thru Hole) on the flashlight head (Figure 1)...

    Problem 1 Consider the drilling of Feature 3 (Thru Hole) on the flashlight head (Figure 1) Assume the feed of the drilling opcration (i.e., the distance the drill penetrates per unit revolution) is,f= 0.01 inrev. " a) Calculate the material removal rate (in in3/s or mm3/s). b) Use the Taylor Tool Life equation to estimate the tool life (in minutes) for this operation. Use Table 1 to pick appropriate values of C and n (the flashlight material is aluminum and...

  • Chapter 15: 1. Shear plane angle and shear strain: In an orthogonal cutting operation, the tool...

    Chapter 15: 1. Shear plane angle and shear strain: In an orthogonal cutting operation, the tool has a rake angle = 16°. The chip thickness before the cut = 0.32 mm and the cut yields a deformed chip thickness = 0.72 mm. Calculate (a) the shear plane angle and (b) the shear strain for the operation. 2. Shear strength: The cutting force and thrust force have been measured in an orthogonal cutting operation to be 301 lb and 291 lb,...

  • Question 1 A turning operation is carried out on aluminum. Based on the specific energy values...

    Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...

  • need help on 10 F "I'll never under and this accounting stuff" Blake Dunn yelled, waving...

    need help on 10 F "I'll never under and this accounting stuff" Blake Dunn yelled, waving the income statement he had just received from his accountant in the morning mail. "Last month, we sold 2,000 stuffed State University mascots and earned $6,565 in operating income. This month, when we sold 3,000 I thought we'd make $9,848. But this income statement shows an operating income of $11,615! How can I ever make plans if I can't predict my income? I'm going...

  • As you know from Project 4, McCormick & Company is considering building a new factory in...

    As you know from Project 4, McCormick & Company is considering building a new factory in Largo, Maryland. McCormick & Company decided to offer $4,424,000 to obtain the land for this project. The new factory will require an initial investment of $350 million to build the new plant and purchase equipment. You have been asked to continue your work from project 4 with a full analysis of the proposed factory, including the start-up costs, the projected net cash flows from...

  • Starbucks after Schultz This activity is important because, as a manager, you must be able to...

    Starbucks after Schultz This activity is important because, as a manager, you must be able to identify your company’s core competency and select an appropriate business-level strategy to optimize its competitive value. The goal of this exercise is to demonstrate your understanding of core competency and business-level strategies by applying these concepts to Starbucks’ recent experience in identifying and regaining its competitive advantage. Read the case below and answer the questions that follow. Case Inspired by Italian coffee bars, Starbucks...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT