A manufacturing operation working 8 hrs a day produces 500 units. These units were produced by five workers who used 300 poun

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer a= Labor productivity = 500/(5*8) =12.5 units/labor hours

Answer b= Multifactor productivity= 500/(5*8*10+300*3+1.5*5*8*10) =0.2632 or26.32%

Add a comment
Know the answer?
Add Answer to:
A manufacturing operation working 8 hrs a day produces 500 units. These units were produced by...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • QUESTION 2 3 p Compute the multifactor productivity measure for an 8 hour day in which...

    QUESTION 2 3 p Compute the multifactor productivity measure for an 8 hour day in which the usable output was 630 units, produced by 5 workers who used 905 pounds of materials. Workers have an hourly wage of 17 and material cost is 2.2 per pound. Overhead is 1.5 times labor cost The multifactor productivity (units/S)- decimal places) (round to 4

  • Compute the multifactor productivity measure for an 8 hour day in which the usable output was...

    Compute the multifactor productivity measure for an 8 hour day in which the usable output was 920 units, produced by 6 workers who used 354 pounds of materials. Workers have an hourly wage of 19 and material cost is 3.2 per pound. Overhead is 1.6 times labor cost. The multifactor productivity (units/$) = Blank 1 (round to 4 decimal places)

  • Save Answer Question 17 3 points Compute the total productivity measure, in units/dollar, for an eight-hour...

    Save Answer Question 17 3 points Compute the total productivity measure, in units/dollar, for an eight-hour day in which the usable output was 2,770 units, produced by three workers who used 503 pounds of materials. Workers have an hourly wage of $19; and material cost is $2 per pound, Overhead is 1.5 times labor cost. (Write your answer using TWO decimal places).

  • Question 17 3 points Save Answer Compute the total productivity measure, in units/dollar, for an eight-hour...

    Question 17 3 points Save Answer Compute the total productivity measure, in units/dollar, for an eight-hour day in which the usable output was 3,463 units, produced by three workers who used 596 pounds of materials. Workers have an hourly wage of $22, and material cost is $2 per pound. Overhead is 1.5 times labor cost. (Write your answer using TWO decimal places).

  • Question 17 3 points Save Answer Compute the total productivity measure, in units/dollar, for an eight-hour...

    Question 17 3 points Save Answer Compute the total productivity measure, in units/dollar, for an eight-hour day in which the usable output was 3,463 units, produced by three workers who used 596 pounds of materials. Workers have an hourly wage of $22, and material cost is $2 per pound. Overhead is 1.5 times labor cost. (Write your answer using TWO decimal places). Question 18 Toyota is famous for several innovations, including its TPS. What is the production strategy they follow...

  • please answer both questions % (round to 2 decimal places) QUESTION 2 Compute the multifactor productivity...

    please answer both questions % (round to 2 decimal places) QUESTION 2 Compute the multifactor productivity measure for an 8 hour day in which the usable output was 653 units, produced by 7 workers who used 534 pounds of materials. Workers have an hourly wage of 19 and material cost is 1.2 per pound. Overhead is 1.5 times labor cost 3 paints The multifactor productivity (units/S) (round to 4 decimal places) QUESTION 3 3points ve A A health club has...

  • A company produces 300 units of a product a day, which costs $12 per unit. It...

    A company produces 300 units of a product a day, which costs $12 per unit. It employs 3 workers who work 8 hours a day at an hourly rate of $12 dollars per hour. The cost for materials is $1,200 and overhead is $260. The company plans to outsource some of its work to the outside suppliers. The administration believes it will allow lay off one of the workers (use only two workers), pay the other two workers an hourly...

  • Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars....

    Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. Assume 40-hour weeks and an hourly wage of $16. Overhead is 1.5 times weekly labor cost. Material cost is $9 per pound. (Round your answers to 2 decimal places.) Week Output (units) 26,000 31,000 29,000 33,000 Workers Material (1bs) 400 450 490 510 WeekMFP (output/ Total Cost)

  • Problem 2-3 Compute the multifactor productivity measure for each of the weeks shown for production of...

    Problem 2-3 Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. Assume 40-hour weeks and an hourly wage of $16. Overhead is 1.5 times weekly labor cost Material cost is $9 per pound. (Round your answers to 2 decimal places.) Workers Material (1lbs) t (units) 25,000 30,000 35,000 45,000 400 450 550 650 12 MFP (Output/Total Cost)

  • Use Excel to compute multifactor productivity for the following two weeks. Assume 40-hour weeks and an...

    Use Excel to compute multifactor productivity for the following two weeks. Assume 40-hour weeks and an hourly wage of $16. Overhead is 1.5 times weekly labor cost. Material cost is $9 per pound. Week            Output(units)        Workers       Material(lbs) 1                    30,000                     6                 450 2                    35,400                     8                 480 How much percent is the productivity increase or decrease in Week 2 compared to Week 1? An Excel file must be uploaded to indicate your computation to get the points of this question.

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT