The following data gives the number of defectives in 5 independent samples from a production process....

The following data gives the number of defectives in 5 independent samples from a production process. The samples are of varying size. Draw appropriate chart and comment on the process

Sample number     Sample size     Number of defectives

1                              2000                   400

2                              1000                   150

3                              1000                   120

4                               600                     80

5                               400                     50

0 0
Add a comment Improve this question Transcribed image text
Answer #1

For our example we use np or do chart For this chart it is not necessary to calculate the problem of proportion of defectives[LCLd = 122.665] Cld = npe 5000 x 0:032 = 160 [cLd=160 UCLI = np + 3 vno a = ( 5600 X 0.032) + 3 J5000X 0.03 2x0.968 = 160+ 3d-chart is scale on axis = 1cm= 1 on-y-axis = 50 detectives 250 Defectives 2.00 150 JUCL → CL LCL TO 0 1 2 3 4 5 sample numbe

Add a comment
Know the answer?
Add Answer to:
The following data gives the number of defectives in 5 independent samples from a production process....
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Twenty five samples of size 1000 each were drawn from a manufacturing process and the number...

    Twenty five samples of size 1000 each were drawn from a manufacturing process and the number of defectives in each sample was counted. The average sample proportion was 0.05. The upper control limit for the p chart is:

  • A manufacturer produces test tubes from two independent processes. Process 1 produces 10% defectives while Process...

    A manufacturer produces test tubes from two independent processes. Process 1 produces 10% defectives while Process 2 produces 15% defectives. Random samples of size 100 are obtained from each process on a daily basis. What is the probability that the sample from Process 1 has fewer defectives than the of Process 2?

  • Using minitab. 1. The data shown in Table 116.1 come from a production process with two...

    Using minitab. 1. The data shown in Table 116.1 come from a production process with two observable quality characteristics: x1 and x2. The data are sample means of each quality characteristic, based on samples of size n = 25. Assume that mean values of the quality characteristics and the covariance matrix were computed from 50 preliminary samples: 200 1307 1 = 30s= 130 120 TABLE 11 E. 1 Data for Exercise 11.1 Sample Number 1 58 60 50 10 12...

  • Ten samples of 15 parts each were taken from an ongoing process to establish a p...

    Ten samples of 15 parts each were taken from an ongoing process to establish a p chart for control. The samples and the number of defectives in each are shown in the following table: 3. Sample Sample Number of Number of defects in Sample n defects in Sample 1 15 3 6 15 2 2 15 1 7 15 0 15 0 8 15 4 15 0 9 15 1 5 15 0 10 15 0 a) Develop a p-chart...

  • 2- The number of nonconforming switches in Number of Number of samples of size 150 are...

    2- The number of nonconforming switches in Number of Number of samples of size 150 are shown in the Table. Sample Construct a fraction nonconforming control chart (p-chart) for these data. Does the process appear to be in control? If not assume that assignable causes can be found 4 for all points outside the control limits and calculate the revised control limits. Nonconforming Switches Sample Number Nonconforniro Switches Number 12 13 14 15 16 17 18 19 0 15 10

  • 13.11 The metal body for a spark plug is made by a combination of cold extrusion...

    13.11 The metal body for a spark plug is made by a combination of cold extrusion and machining. The occurrence of surface cracking following the extrusion process has been shown by Pareto diagrams to be responsible for producing virtually all of the defective parts. To identify opportunities for process improvement, it was decided to construct p charts for the process. During one shift, 25 samples of size n - 100 were collected and the results shown in the table were...

  • Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...

    Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: Sample n number of defective items in the sample 1 15 1 2 15 1 3 15 1 4 15 0 5 15 2 6 15 3 7 15 1 8 15 0 9 15 2 10 15 1 a. Determine the p, Sp, UCL and LCL...

  • Examnle 7 IFRQ1203M] Independent random samples of 500 households were taken from a large metropolitan area...

    Examnle 7 IFRQ1203M] Independent random samples of 500 households were taken from a large metropolitan area in the United States for the years 1950 and 2000 Histograms of household size (number of people in a household) for the years are shown below. SocS 120 t00 100 80 80 6o 5 20 8 10 12 14 1 0 268 12 416 Houschold Stze in 1950 Houschold Size in 2000 A researcher wants to use these data to construct a confidence interval...

  • Data was collected from a textile finishing process. Samples were collected daily and the number of...

    Data was collected from a textile finishing process. Samples were collected daily and the number of nonconformities were recorded. (recall more than one nonconformity can be present on each unit) Day Number of units produced Number of Nonconformities 1 13 60 2 12 43 3 19 55 4 14 44 5 18 55 6 13 40 7 24 61 8 15 49 9 16 66 10 11 41 Using Minitab: 1. Construct an appropriate control chart for the above data....

  • Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart...

    Ten samples of 15 parts each were taken from an ongoing process to establish a p-chart for control. The samples and the number of defectives in each are shown in the following table: SAMPLE n NUMBER OF DEFECTIVE ITEMS IN THE SAMPLE 1 15 3 2 15 2 3 15 2 4 15 2 5 15 0 6 15 2 7 15 1 8 15 3 9 15 2 10 15 1 a. Determine the p−p−, Sp, UCL and LCL...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT