Question

1. i. A newly installed generator in a power station needs to be synchronized with the power grid through a lossless transmiswrite in word

0 0
Add a comment Improve this question Transcribed image text
Answer #1

[Page-L) 01. (1) Solna the lossless dramsmission Suppose, impedance of time = jxe pou impedance of the generator = 3xg p.u. •[Page-2/ ELS-90 - Xetxo VL-90 Xe +Xg complexe power, s, delivered to power arid by newly installed generator is given by SEVdramspen from Page 3 maximum Real power that can be the tramsmission time at P= Very Sims. maximum of above equation occur wPage-45 f - frequency a which is given as constant with load Variation. So from the above equation we can conclude that speed

Add a comment
Know the answer?
Add Answer to:
write in word 1. i. A newly installed generator in a power station needs to be...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • At 60 Hz, the generator with a load angle of 30°, supplies power to a load...

    At 60 Hz, the generator with a load angle of 30°, supplies power to a load through a transmission line with inductance of 6 H. The sending voltage is 11 KV and the receiving end voltage is 10.5 KV. Find the maximum power which can be transferred through this transmission line per phase.

  • I need help to solve this questions about Generator Governor Droop and Transmission Line. A complete...

    I need help to solve this questions about Generator Governor Droop and Transmission Line. A complete solutions with answers would be great. Thank you Generation Question 1 to 5 relate to the following grid connected generator. A governor-controlled, steam-driven 450 MW synchronous generator with 5% droop is synchronized to the 60 Hz grid and its load set-point adjusted to deliver 300 MW to the grid. Q1. (a) 000 What is the actual droop of the generating unit? 0.0225 Hz/MW (b)...

  • QUESTION 1 (20 MARKS) a) Suggest ONE (1) suitable type of electrical power generation station for...

    QUESTION 1 (20 MARKS) a) Suggest ONE (1) suitable type of electrical power generation station for the following geographical location. Justify your proposal. River. ii) Coast. iii) Flat land. (CO3:P01 - 6 Marks) b) Discuss about the four major parts in power system namely generation, transmission, distribution and load. The discussion must be about the respective main role and voltage level. (C01:PO2 - 8 Marks) c) Propose THREE (3) main or ancillary equipment to be installed in an electrical power...

  • I have seen similar examples of this question. However, for both 208V and 280V AC power...

    I have seen similar examples of this question. However, for both 208V and 280V AC power system, the line-to-line voltage seems to be the same which 120V and that does not make sense. Can you please justify that in the solution? A 280-V, 3Ø AC power system, Y-connected three-phase generator connected through a three-phase transmission line to a A-connected load. The transmission line has an impedance of (0.06+j0.12) S2/phase, and the load has an impedance of (12+j9) 92 per phase....

  • 1. A single-phase power system consists of a 480-V 60-Hz generator supplying a load of Zload...

    1. A single-phase power system consists of a 480-V 60-Hz generator supplying a load of Zload = 4 + j3 2 through a transmission line of impedance Zline = 0.18 + 0.24 2. (a) (i) If the power system is exactly as shown in Fig. P3.1, calculate the line current voltage at the load. (ii) Calculate the transmission line losses. (b) Suppose a 1:10 step-up transformer is placed at the generator end of the transmission line and 10:1 step-down transformer...

  • 1. A three-phase synchronous generator connected to a 345-KV transmission line through a transformer as shown...

    1. A three-phase synchronous generator connected to a 345-KV transmission line through a transformer as shown in Figure P1. Parameters of both generator and transformer are given in the figure. Transformer losses and exciting current are neglected. A three-phase short-circuit occurs on the line side of the circuit breaker when the generator is operated at rated terminal voltage and at no-load. The breaker interrupts the fault three cycles after fault inception. Neglect the effect of the transformer on the time...

  • solve no: 3.14 , 3.16, 3.19 please show each step and solve for beginners 120 Power...

    solve no: 3.14 , 3.16, 3.19 please show each step and solve for beginners 120 Power System Analysis 3.12. A single-phase system similar to that shown in Figure 3.11 has two transformers A-B a B-C connected by a line B feeding a load at the receiving end C. The ratings and parame ter values of the components are 500 V/1.5 kV, 9.6 kVA. leakage reactance 5 % 1.2 kV/120 V, 7.2 kVA, leakage reactance 4 % series impedance (0.5 +...

  • My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcateg...

    My Courses Week 2 Assignment(s) Week 2 Assignment(s) Assignment 2 Power Markets have two subcategories: generation and grid ancillary services (page 113). Text box 2-2a (page 101) describes grid ancillary services and text box 2-2b (page 102) describes essential reliability services. Create a table which lists the grid ancillary services with services as the rows and resources (hydropower, solar, and wind) as columns. In the respective row/column box summarize if the resource can provide the service, with a bottom line...

  • Laboratory 2: Transistor circuit characteristics A. Objectives: 1. To study the basic characteris...

    Laboratory 2: Transistor circuit characteristics A. Objectives: 1. To study the basic characteristics of a transistor circuit. 2. To study the bias circuit of a transistor circuit. B. Apparatus: 1. DC Power supply 2. Experimental boards and corresponding components 3. Electronic calculator (prepared by students) 4. Digital camera (prepared by students for photo taking of the experimental results) 5. Laptop computer with the software PicoScope 6 and Microsoft Word installed. 6. PicoScope PC Oscilloscope and its accessories. 7. Digital multi-meter....

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT