Let us suppose a single product requires a three step process:

Stage 1: It takes 25 minutes at this step, there are 10 machines, the machines are 80% available, and the product faces 90% yield.

Stage 2: It takes 15 minutes at this step, there are 6 machines, the machines are available 90% available, and the product faces 95% yield.

Stage 3: It takes 12 minutes at this step, there are 4 machines, the machines are available 75%, and the product faces an 80% yield.

How many units can this system produce per hour?

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
Let us suppose a single product requires a three step process: Stage 1: It takes 25...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Consider the following three step process: Step 1 Step 2 Step 3 9 minutes 2 machines...

    Consider the following three step process: Step 1 Step 2 Step 3 9 minutes 2 machines 60% 6 minutes 1 machine 80% yield 10 minutes 1 machine 90% What is the utilization percent at Step 2? Enter your answer in decimal form, e.g, if your answer is 12.34%, enter in 0.1234

  • (1) Let us suppose it costs $70 to produce the 80th unit, assuming a learning rate...

    (1) Let us suppose it costs $70 to produce the 80th unit, assuming a learning rate of 95%, determine the cost of the 160th unit. (2) If the 4th unit took 24 hours to produce, and the 20th unit took 19 hours to produce, what would the learning rate be? Note: Express your answer in decimal places, i.e., if your answer is 40.56%, enter in 0.4056. (3) Let us suppose it costs $500 to produce the 120th unit, assuming a...

  • Ala Carte Bhd makes three products in a single facility. Data concerning these products follow Product Direct...

    Ala Carte Bhd makes three products in a single facility. Data concerning these products follow Product Direct materials RM74.90 RM90.80 RM26.40 RM29.10 RM2.20 RM2.20 RM3.80 RM2.50 3.20 Direct Labor Variable manufacturing overhead Variable selling cost per unit Mixing minutes per unit Monthly demand in units RM71 RM15.20 RM1.60 2.90 2.70 1.000 4,000 4,000 The mixing machines are potentially the constraint in the production facility. A total of 24,500 minutes are available per month on these machines. Direct labor is a...

  • 6. Hickory Manufacturing Company forecasts the following demand for a product (in thousande of units)...

    6. Hickory Manufacturing Company forecasts the following demand for a product (in thousande of units) over the next 5 years: 2 Year 5 81 60 79 84 Forecast demand 84 Currently the manufacturer has seven machines that operate on a two-shift (eight hours each) basis. Twenty days per year are available for scheduled maintenance of equipment with no process output. Assume there are 250 workdays in a year. Each manufactured good takes 25 minutes to produce. a. What is the...

  • (This information applies to questions 21-25) Rocky Top hardwal pemancluringsteetbars. The process starts with raw material...

    (This information applies to questions 21-25) Rocky Top hardwal pemancluringsteetbars. The process starts with raw material (carbon steel wire), then progresses sequentially through five steps using machines A to E, respectively (see diagram below). This is the only use that the five machines are put to. The hourly throughput rates (in Ibs/hour) for each machine are provided in the diagram below. Step 1 Step 4 Raw Material Step 2 B Step 3 C Step 5 E Market Demand D A...

  • Holton Company makes three products in a single facility. Data concerning these products follow: Product A...

    Holton Company makes three products in a single facility. Data concerning these products follow: Product A B C Selling price per unit $ 150.90 $ 76.30 $ 170.90 Direct materials $ 65.60 $ 42.50 $ 102.80 Direct labor $ 47.20 $ 13.50 $ 30.80 Variable manufacturing overhead $ 9.00 $ 4.50 $ 14.30 Variable selling cost per unit $ 24.40 $ 3.30 $ 8.80 Mixing minutes per unit 43.30 4.00 4.00 Monthly demand in units 3,000 1,000 2,000 The mixing...

  • Holton Company makes three products in a single facility. Data concerning these products follow: Product A...

    Holton Company makes three products in a single facility. Data concerning these products follow: Product A B C Selling price per unit $ 150.90 $ 76.30 $ 170.90 Direct materials $ 65.60 $ 42.50 $ 102.80 Direct labor $ 47.20 $ 13.50 $ 30.80 Variable manufacturing overhead $ 9.00 $ 4.50 $ 14.30 Variable selling cost per unit $ 24.40 $ 3.30 $ 8.80 Mixing minutes per unit 43.30 4.00 4.00 Monthly demand in units 3,000 1,000 2,000 The mixing...

  • Glocker Company makes three products in a single facility. These products have the following unit product...

    Glocker Company makes three products in a single facility. These products have the following unit product costs: 3 Product B 5 Direct Materials $ 10.90 $ 15.80 $ 12.60 6 Direct Labor 18.50 12.60 9 .75 7 Variable Manufacturing Overhead 2.40 1.20 1.80 8 Fixed Manufacturing Overhead 11.607.209.60 9 Unit product cost $ 43.40 $ 36.80 $ 33.75 10 11 12 Additional information about the products: Product 14 15 Mixing minutes per unit 2.00 0.50 1.00 16 Selling price per...

  • Glover Company makes three products in a single facility. These products have the following unit product...

    Glover Company makes three products in a single facility. These products have the following unit product costs: Product A B C Direct materials $ 33.20 $ 49.70 $ 56.10 Direct labor 20.60 23.20 14.00 Variable manufacturing overhead 1.60 1.00 0.50 Fixed manufacturing overhead 13.10 8.70 9.30 Unit product cost $ 68.50 $ 82.60 $ 79.90 Additional data concerning these products are listed below. Product A B C Mixing minutes per unit 1.60 0.80 0.10 Selling price per unit $ 62.00...

  • Hart Manufacturing makes three products. Each product requires manufacturing operations in three ...

    Hart Manufacturing makes three products. Each product requires manufacturing operations in three departments: A, B, and C. The labor-hour requirements, by department, are as follows: Department Product 1 Product 2 Product 3 A 2.00 1.50 3.00 B 2.50 2.00 1.00 C 0.25 0.25 0.25 During the next production period the labor-hours available are 450 in department A, 350 in department B, and 50 in department C. The profit contributions per unit are $30 for product 1, $25 for product 2,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT