Question

Consider the following three step process: Step 1 Step 2 Step 3 9 minutes 2 machines...

Consider the following three step process:

Step 1 Step 2 Step 3


9 minutes
2 machines
60%

6 minutes
1 machine
80% yield
10 minutes
1 machine
90%

What is the utilization percent at Step 2?

Enter your answer in decimal form, e.g, if your answer is 12.34%, enter in 0.1234

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
Consider the following three step process: Step 1 Step 2 Step 3 9 minutes 2 machines...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • 2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step...

    2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step 3 Step 2 Processing time 1 minute/part Processing time 1.5 minute/part Processing time 2 minute/part Setup time No Setup No Setup 20 minutes Work is processed in batch at each step. Before a batch is processed at step 1, the machine has to be set up. During There are no inventory buffers between steps. a setup, the machine is unable to...

  • Let us suppose a single product requires a three step process: Stage 1: It takes 25...

    Let us suppose a single product requires a three step process: Stage 1: It takes 25 minutes at this step, there are 10 machines, the machines are 80% available, and the product faces 90% yield. Stage 2: It takes 15 minutes at this step, there are 6 machines, the machines are available 90% available, and the product faces 95% yield. Stage 3: It takes 12 minutes at this step, there are 4 machines, the machines are available 75%, and the...

  • Step 1 Step 2 Step 3 Setup: 30 minutes Setup: 50 minutes Run: 2 minutes Run:...

    Step 1 Step 2 Step 3 Setup: 30 minutes Setup: 50 minutes Run: 2 minutes Run: 3 minutes Consider the following three-step process with setup times and task times: Setup: 40 minutes Run: 5 minutes Refer to the Three-Step Line with Batch Processing Diagram. Assume the batch size is 10. At each station, the worker sets up the machine, runs 10 units through the process, then sets up the machine for the next batch. At the beginning, the worker at...

  • Consider the following production process for manufacturing biscuits. The first step of the process is mixing...

    Consider the following production process for manufacturing biscuits. The first step of the process is mixing where all of the ingredients are combined in the correct proportion to form dough. In the next step of the process, the dough is formed into sheets and cut into pieces in preparation for baking. The cut dough is then baked into biscuits and subsequently must be cooled. The final step of the process is packaging the biscuits for the consumer. The following table...

  • PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume...

    PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has a processing time of 2 minutes per unit. Resource 2 has a processing time of 6 minutes per unit. Resource 3 has a processing time of 4 minutes per unit. Resource 1 Resource2 Resource 3 All three resources are staffed by one worker. The flow diagram is shown above. Round "Capacity of resource" to...

  • QUESTION 1 Consider a firm with a beta of 1.27. If the market risk premium is...

    QUESTION 1 Consider a firm with a beta of 1.27. If the market risk premium is 7.67% and the risk-free rate is 1.97 % , what is the firm's expected return according to the capital asset pricing model? Round your answer to four decimal places, e.g., enter 0.1234 for 12.34% QUESTION 2

  • (Process with Rework) Consider the following three-stage production process of glass ceramics, wh...

    Matching supply with Demand (3rd Edition) - Question 10.2 (Process with Rework) Consider the following three-stage production process of glass ceramics, which is operated as a worker-paced line. Q10.2 Components 6 min./unit 5 min./unit min. /unit Finished Units Rework The process is experiencing severe quality problems related to insufficiently trained work- ers. Specifically, 20 percent of the parts going through operation 1 are badly processed by the operator. Rather than scrapping the unit, it is moved to a highly skilled...

  • An initial time study was done on a process with the following results​ (in minutes). Based...

    An initial time study was done on a process with the following results​ (in minutes). Based on the data obtained so​ far, assuming an allowance of 13 percent of the normal​ time, what do you estimate for the time per customer​ served, based on this preliminary​ sample? ​(Round all intermediate calculations to two decimal​ places.)                     Element   Performance Rating   Obs 1   Obs 2   Obs 3   Obs 4   Obs 5 Element 1 80 6 6 3 5 3 Element 2 120 9...

  • Step 3 of 5: Calculate the estimated variance of slope, s2b1. Round your answer to three...

    Step 3 of 5: Calculate the estimated variance of slope, s2b1. Round your answer to three decimal places. Step 4 of 5: Construct the 80% confidence interval for the slope. Round your answers to three decimal places. Step 5 of 5: Construct the 90% confidence interval for the slope. Round your answers to three decimal places. The data in the table is the number of absences for 7 students and their corresponding grade. 3 6 6 7 Number of Absences...

  • Solve the following using the 5-step process A hose can fill a water tank in 54...

    Solve the following using the 5-step process A hose can fill a water tank in 54 minutes. The drain can empty the water tank in 60 minutes. If the drain is left open, how long would it take to fill the water tank? Instructions: Enter your answer in whole number or fraction form (not as a decimal). When entering units, type the full word without capitals, eg pounds, ounces, gallons, feet, etc. Units It will take Number to fill the...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT