The batch starts from Step 1.
So total time in step 1 = Set up + run time = 30+2 = 32 minutes

By the time product reaches step 2, step 2 would be already set up for 32 minutes.
So total time is step 2 = Balance set up + Run time = (50-32) + 3 = 21 minutes.

By the time product reaches Step 3, step 3 would be ready after set up.
So total time in step 3 = run time = 5 minutes.

Total throughput time for a batch of 10 units = 32 + 21 + 5 = 58 minutes

Add a comment
Know the answer?
Add Answer to:
Step 1 Step 2 Step 3 Setup: 30 minutes Setup: 50 minutes Run: 2 minutes Run:...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step...

    2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step 3 Step 2 Processing time 1 minute/part Processing time 1.5 minute/part Processing time 2 minute/part Setup time No Setup No Setup 20 minutes Work is processed in batch at each step. Before a batch is processed at step 1, the machine has to be set up. During There are no inventory buffers between steps. a setup, the machine is unable to...

  • Adam (with the same machine) performs tasks 1 and 2. After running a setup on the...

    Adam (with the same machine) performs tasks 1 and 2. After running a setup on the machine, he performs task 1 on every unit in a batch. Then, he runs another setup on the same machine before performing task 2 on every unit in the batch. After that, either Brad or Chloe performs task 3 on the units. Finally, Dorothee does task 4. Tasks 3 and 4 are done by the workers only so they do not require any setups....

  • Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one ta...

    Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one takes an average of 60 minutes to paint each unit. Drying takes place in an oven that can hold up to 100 units and it takes 5 minutes to load each unit. Once all the units are loaded into the oven, it takes 6 hours to dry each load. Assume that the process is capacity constrained (so the demand rate...

  • Consider the following three step process: Step 1 Step 2 Step 3 9 minutes 2 machines...

    Consider the following three step process: Step 1 Step 2 Step 3 9 minutes 2 machines 60% 6 minutes 1 machine 80% yield 10 minutes 1 machine 90% What is the utilization percent at Step 2? Enter your answer in decimal form, e.g, if your answer is 12.34%, enter in 0.1234

  • Consider the following batch flow process consisting of four process steps operated by Anna, Aaron, Emily...

    Consider the following batch flow process consisting of four process steps operated by Anna, Aaron, Emily and Mike. Emily’s step requires set-up. Assume the units in a production batch must be moved together between steps. The activity times and setup time are given below: What batch size would you choose so as to maximize the process capacity? a. 5 b. 10 c. 15 d. 20 e. 25 Process Steps operated by Processing Time in min per unit Setup time Anna...

  • 1. The bottleneck time of the system is - ??? minutes per unit ​(enter your response...

    1. The bottleneck time of the system is - ??? minutes per unit ​(enter your response as a whole​ number). 2. Which Station (1, 2, or 3) is the bottle neck station? 3. The throughput time is - ?????? 4. If the firm operates 11 hours per? day, 5 days per? week, the weekly capacity of this work cell is?....... units? (enter your response as a whole? number). The three-station work cell illustrated in the figure below has a product...

  • Question #2 (15 Points) The result of a detailed study of setup procedure on a molding machine is...

    only question 3 Question #2 (15 Points) The result of a detailed study of setup procedure on a molding machine is shown in Table 1 below. The setup involved removing an old die and installing a new one. Tahle I InternalTime Performed by External?(min) Step# Setup 1 Check in at operation, go to die storage 2 Transfer new die 3 Remove old die 10 Setup person 16 Setup person 20 Setup person 20 Setup persorn 30 Operator 24 Setup person...

  • A.J.'s Wildlife Emporium manufactures two unique birdfeeders (Deluxe and Super Duper) that are manufactured and assembled...

    A.J.'s Wildlife Emporium manufactures two unique birdfeeders (Deluxe and Super Duper) that are manufactured and assembled in up to three different workstations (X, Y, and Z) using a small batch process. Each of the products is produced according to the flowchart below. Additionally, the flowchart indicates each product's price, weekly demand, and processing times per unit. Batch setup times are negligible. A.J. can make and sell up to the limit of its weekly demand and there are no penalties for...

  • Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit with...

    Alpha Assemblies produces a wide variety of products in their central Nebraska facility. Many of these products fit within a line of standard truck and trailer parts. Within this is a set of hitches that can be made in two sizes (1-1/4 and 2) and three strengths (light duty, medium duty, and heavy duty). All of the hitches in this line have "natural" finishes so no additional steps are necessary after they are cast. The machine used to cast these...

  • Bruno Fruscalzo decided to setup a small production facility in Sydney to sell to the local restaurants who want to off...

    Bruno Fruscalzo decided to setup a small production facility in Sydney to sell to the local restaurants who want to offer gelato on their dessert menu. To start simple, he would offer only 3 flavors of gelato: fragola (strawberry), chocolato (chocolate), and bacio (chocolate with hazelnut). After a short time he determined his demand and setup times, as shown in the table below Fragola Chocolato Bacio Demand (kg/hours) 15 Setup time minutes 10 35 25 15 Bruno first produces a...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT