Question

PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume there exists unlimited demand for the product. Resource 1 has a processing time of 2 minutes per unit. Resource 2 has a processing time of 6 minutes per unit. Resource 3 has a processing time of 4 minutes per unit. Resource 1 Resource2 Resource 3 All three resources are staffed by one worker. The flow diagram is shown above. Round Capacity of resource to 3 decimal places and other numbers to whole numbers a. What is the capacity of resource 2? b. What is the bottleneck in the process? c. What is the utilization of resource 2? 0.166 units per minute 2 Resource 3 percent How long does it take the process to produce 182 units starting with an empty system, assuming this is a worker-paced process? d 1,096 minutes

0 0
Add a comment Improve this question Transcribed image text
Request Professional Answer

Request Answer!

We need at least 10 more requests to produce the answer.

0 / 10 have requested this problem solution

The more requests, the faster the answer.

Request! (Login Required)


All students who have requested the answer will be notified once they are available.
Know the answer?
Add Answer to:
PA 3-3 Consider a process consisting of three... Consider a process consisting of three resources. Assume...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Similar Homework Help Questions
  • Consider a process consisting of three activities required to make a cell phone case. Assume there exists

    Consider a process consisting of three activities required to make a cell phone case. Assume there exists an unlimited demand for the cases. • Activity 1 has a processing time of 6 minutes per unit. • Activity 2 has a processing time of 3 minutes per unit. Activity 3 has a processing time of 5 minutes per unit. All three activities are staffed by one worker and each worker gets paid $12 per hour. A. Calculate the cost of direct...

  • Consider a process consisting of five resources that are operated eight hours per day. The process...

    Consider a process consisting of five resources that are operated eight hours per day. The process works on three different products, A, B, and C; Resource Number of Workers Processing Time for A (Min./Unit) Processing Time for B (Min./Unit) Processing Time for C (Min./Unit) 1 2 5 5 5 2 2 3 4 5 3 1 15 0 0 4 1 0 3 3 5 2 6 6 6 Demand for the three different products is as follows: product A,...

  • (Process with Rework) Consider the following three-stage production process of glass ceramics, wh...

    Matching supply with Demand (3rd Edition) - Question 10.2 (Process with Rework) Consider the following three-stage production process of glass ceramics, which is operated as a worker-paced line. Q10.2 Components 6 min./unit 5 min./unit min. /unit Finished Units Rework The process is experiencing severe quality problems related to insufficiently trained work- ers. Specifically, 20 percent of the parts going through operation 1 are badly processed by the operator. Rather than scrapping the unit, it is moved to a highly skilled...

  • 2. Four Step Process with Rework and Scrap - from module 5 slides Consider the following...

    2. Four Step Process with Rework and Scrap - from module 5 slides Consider the following four step assembly operation with quality problems. All resources are staffed with one operator. The first resource has a processing time of 4 minutes per unit The second resource has a processing time of 3 minutes per unit. This process suffers from a high yield loss and 50% of all products have to be scrapped after this step. The third resource also suffers from...

  • Saved 7 Dolls are the flow unit in a process with two resources. The capacities of...

    Saved 7 Dolls are the flow unit in a process with two resources. The capacities of the resources are 15 and 0.99 dolls per minute. Demand occurs at the rate 11 dolls per minute. Instruction: Round your answer to one decimal place. What is the utilization (%) of the second resource? %6 05:59 Dinners are the flow unit in a process with two sequential resources. The processing times for the resources are 0 22 and 0.16 hours. Demand occurs at...

  • 2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step...

    2. Consider the following batch flow process consisting of three process steps performed by three machines: Step 1 Step 3 Step 2 Processing time 1 minute/part Processing time 1.5 minute/part Processing time 2 minute/part Setup time No Setup No Setup 20 minutes Work is processed in batch at each step. Before a batch is processed at step 1, the machine has to be set up. During There are no inventory buffers between steps. a setup, the machine is unable to...

  • OVERWORKED INC has 3 resources (Resource A, Resource B and Resource C) in its production process....

    OVERWORKED INC has 3 resources (Resource A, Resource B and Resource C) in its production process. The production process involves 3 products (Product A, Product B and Product C) being processed through these 3 resources. Currently, there is demand for 800 units of Product A, 1,200 units of Product B and 200 units of Product C per day. The processing times for each product at different resource levels is given in the table below: Product A Product B Product C...

  • The local driver’s license center processes applications for driver’s license renewals through the following three steps....

    The local driver’s license center processes applications for driver’s license renewals through the following three steps. First, the customer registers with the receptionist, who updates the customer’s information in the database. This first step takes 3 minutes per customer. Then, the customer visits one of 1 cashiers to pay the associated fees for the license renewal. This takes 3 minutes per customer because several forms must be printed from the computer and signed by the customer. Finally, the customer visits...

  • HEAVYLOAD INC has 3 resources (Resource A, Resource B and Resource C) in its production process....

    HEAVYLOAD INC has 3 resources (Resource A, Resource B and Resource C) in its production process. The production process involves 3 products (Product A, Product B and Product C) being processed through these 3 resources. Currently, there is demand for 700 units of Product A, 1,200 units of Product B and 200 units of Product C per hour. The following bullets provide information about each resource: At Resource A, the processing time for Product A is 14.112 seconds and for...

  • Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one ta...

    Two-step Process Utilization: A two- used to finish a product: painting and drying. There are 5 workers and each one takes an average of 60 minutes to paint each unit. Drying takes place in an oven that can hold up to 100 units and it takes 5 minutes to load each unit. Once all the units are loaded into the oven, it takes 6 hours to dry each load. Assume that the process is capacity constrained (so the demand rate...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT