Value added time = time taken to( inspect + sort + peeling coring+soaking) + time of mixing + time of adding spice
= 15+15+15+20+15+30 =
= 110 sec.
% value added time = 110x100 /505 = 21.8%
Option 2 is right.
Question 30 (6 points) COMPUTATIONAL PROBLEM - VALUE ADDED ACTIVITIES Graves Mountain Step Type of Activity...
summatize the following info and break them into differeng key points. write them in yojr own words apartus 6.1 Introduction—The design of a successful hot box appa- ratus is influenced by many factors. Before beginning the design of an apparatus meeting this standard, the designer shall review the discussion on the limitations and accuracy, Section 13, discussions of the energy flows in a hot box, Annex A2, the metering box wall loss flow, Annex A3, and flanking loss, Annex...