1) A) 6
2) B) 7
3) C) 8
4) B) 10.
These are the minimum number of size and location dimensions required to completely dimension the views.
please answer all questions Name - puis required to completely Review Activity 9-4 For och drawing,...
please ise image to ander all questions
Review Activity Y- Sketch the dimensions requi If feasible, discuss the indicate whether or not nalues to focus on the mech dimensions required to completely describe the size of the block shown below without over dimensioning. discuss the choice and placement with others to evaluate the available options. Your instructor will Teether or not you should use real number values and measurements or simply use "x" for the number focus on the mechanics...
3rd Angle Projection. Sketch the dimensions without over
dimensioning.
Date Unit 9 Dimensioning 187 Name Class Review Activity 9-1 dad the dimensions required to completely describe the size of the block shown below without over dimensioning. esible discuss the choice and placement with others to evaluate the available options. Your instructor will te whether or not you should use mal number values and metsurements or simply se "X" for the number les to focus on the mechanics and the choice...
Please help with isometric drawing if familiar with AutoCAD.
Thanks. (NOTE: Please ignore the part name, part number and
material as I will indicate them within my title block)
Knurled Nut 38 S/8-18 UNF-28 20 MEDIUM KUR 3X B19 25 10-24 UNC-28 AX 24 EQUALLY SPACED V-BOTTOM Clamp Bolt .06x 45 5/8-11 UNC-2ZA 1.00 2.12 34 7.00 SQUARE 18-23 Chapter 16- Drawing Threads in AutoCAD® DRAWING THREADS IN AUTOCAD PROBLEMS P16-1) Draw and dimension the Knurled Nut using proper dimensioning...
help with all questions
8. Identify the cabinet sizes for the following. A. Sink B. Island C. Oven D.Comer wall cabinet 9. What is the minimum clearance required around all aisles at cabinets, islands, and peninsuias? 10. What type of drywall is required for the garage walls and ceiling? 11. Where is the attic access panel located? 12. What are the "U" values at the following locations? A. 246 brick B. Above garage C. 2x4 frame 13. What is the...
Chapter 7: Dimensioning Name: Date: P7-2) Answer questions about the following drawing a) How many linear dimensions? b) How many diameter dimensions? c) How many angular dimensions? d) How many notes-leader line dimensions? e) On the drawing, identify the three datums. f) What does "THRU" mean? 9) If you were inspecting the overall thickness of this part and find that it measures 1.002 in, would it pass inspection? h) If you were inspecting the diameter of the two big holes...
interpreting engineering drawing. I dont need answer 1
port casting bus 12 What is the height of the shaft support cas machining? QUESTIONS: 1. Calculate distances to 2. How many surfaces require finishing? 3. What tolerance is permitted on dimensions which do not specify a certain tolerance? 4. What type of section view is used on part 17 5. What type of section view is used on part 27 The site of the two holes are to be changed comodate...
Please drawing the front view, top view and side view of this
drafing tools.
+ on the top view, draw a cutting plane AA’ to draw a section
view please.
+ Please drawing the isometric Pictorial drawing also.
Thank you!
t 1305-FINAL PROJECT B" You are showed a machined part, and you are to messure that part using e caliper Then you wil ransfer the neasurement into hand drawings with drafting tooks that you will be creating # for the...
Estimated activity times and precedences are given below: Activity Optimistic Most Likely Pessimistic Required Precedence A 6 7 14 B 8 10 12 C 2 3 4 D 6 7 8 A E 5 5.5 9 B, C F 5 7 9 B, C G 4 6 8 D, E H 2.7 3 3.5 F What is the probability that the project will be completed within: A. 21 Days B. 22 Days C. 25 Days
Parametric Modeling with Autodesk Inventor 11-36 Review Questions: (Time: 25 minutes) 1. List the different symmetrical features created in the Pulley design What are the advantages of using a drawing template? 2. Describe the steps required in using the Mirror Feature command. 3. 4. Why is it important to identify symmetrical features in designs? When and why should we use the Pattern option? 5. What are the required elements in order to generate a sectional view? 6. 7. How do...
please help with worksheet
NAME SECTION PRINT LAST NAME, FIRST NAME Use the graph below to answer questions 6 through 9 Can Openers 14,000 12,000 10,000 8,000 6,000 PHE: 4,000 PHF 2,000 2 3 4 1 8 Drill Presses events would best explain a shift from PPF, to PPF2? Which of the following 6. An increase in rate of unemployment An increase in the size of the labor force A reduction in rate of unemployment A reduction in the size...