Question

A water treatment plant will deliver 15.0 million gallons per day 8 PUR(mgd). If the daily peaking factor is 1.5, how many customers carn it serve with an annual average of 150 gped? A 36-inch pipe carries 25 cfs of water for 20 miles. At the starting point, the chlorine concentration is C,4mgl. Compute the 19 Qexpected concentration at the 20-mile point. The time variable is in days and the rate coefficient is k-1.5 day-1. The decay equation is: C-Ce
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
A water treatment plant will deliver 15.0 million gallons per day 8 PUR(mgd). If the daily...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Example 8: A 10 MGD (million gallons per day) surface water treatment plant proposes to use...

    Example 8: A 10 MGD (million gallons per day) surface water treatment plant proposes to use alum coagulation for turbidity reduction using 45 mg/L alum! dosage. The raw water has an alkalinity of 20 mg/L as CaCo,. Commercial alum has the formula Al(SO2)2.144,0 (MW = 594). Determine the daily alum dosage required in kg/d. Z.6 -> EW - 99

  • A water treatment plant operator treats 5 million gallons per day (MGD) of a raw surface...

    A water treatment plant operator treats 5 million gallons per day (MGD) of a raw surface water with 25 mg/L of Aluminum Sulfate (Al2(SO4)3•16H2O) to remove suspended solids in the water. The untreated water contains 20mg/L total suspended solids (TSS). Assuming that the alum removes all but 2 mg/L TSS, determine the weight of sludge which must be removed each day. Assume: - All of the added aluminum sulfate is converted to its solid hydroxide form (Al(OH)3) and captured in...

  • A 50-mgpd (million gallons per day) water treatment plant was proposed in 2017 for Ureka. A...

    A 50-mgpd (million gallons per day) water treatment plant was proposed in 2017 for Ureka. A 60- mgpd plant using the same treatment process was built in 2010 in Vancouver for $50,000,000. Given the following additional information and assumptions: Poor site condition in Vancouver required an additional $3,000,000 for foundations, which is not anticipated for Ureka. Assume the power sizing size exponent = 0.67. Assume inflation will persist at an average 5% per annum. Assume the location index for Vancouver...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT