Pennywise Construction has just made the winning bid of $4.9 million to construct a new facility for a major corporation. The

Activity List for the Pennywise Construction Co. Project Activity Activity Description Immediate Predecessors Most likely | O

Given all the information in the table, use PERT/CPM to help Mr. Hawthorne address to the following questions.

A. Create the network diagram representing the problem.

B. What is the total time expected to be required to complete the project if no delays occur?

C. What are the earliest and latest start and finish times for the individual activities required to meet the expected project completion time provided in question B (show your method for determining this)?

D. Which are the critical bottleneck activities where any delays must be avoided to prevent delaying project completion?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Based on the given table, we find the expected duration of each activity as shown below:

The expected duration for each activity is found out using formula shown in the duration column. The above table in form of formulas is shown below for better understanding and reference:

A. Based on the duration of each activity, we prepare the project network diagram as shown below:

The above network diagram in form of formulas is shown below for reference and better understanding:

The above project diagram is prepared as per legend shown in top-left corner.

EST = Early start time

LST = Late start time

EFT = Early finish time

LFT = Late finish time

SLK = Slack = LST - EST or Slack = LFT - EFT

The EST of an activity = EFT of previous activity

EFT of an activity = EST + Duration - 1

Similarly LFT & LST are calculated during backward pass. The activity END is added to facilitate backward pass calculations and is only a dummy activity.

There are multiple paths in the diagram:

1. A-B-C-D-G-H-M

2. A-B-C-E-H-M

3. A-B-C-E-F-J-K-N

4. A-B-C-E-F-J-L-N

5. A-B-C-I-J-K-N

6. A-B-C-I-J-L-N

Out of above paths, path A-B-C-E-F-J-L-N is the longest path and has 0 slack. Hence, this is the critical path.

B. As seen from above, the total time expected to be required to complete the project if no delay occur = 44 weeks

C. The earliest start, latest start, earliest finish, latest finish times are shown in the project network diagram. The start and finish dates are shown in the box for each activity as per legend in top left corner of the network diagram.

D. The activities on critical path are bottleneck activities i.e. A,B,C,E,F,J,L,N

Add a comment
Know the answer?
Add Answer to:
Given all the information in the table, use PERT/CPM to help Mr. Hawthorne address to the...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Scenario: Your organisation, ABC construction group has made a winning bid to construct a new manufacturing...

    Scenario: Your organisation, ABC construction group has made a winning bid to construct a new manufacturing plant. The client expects the plant to be functional within a year. You are assigned as the Project Manager to ensure that the whole project stays on schedule. The two important conditions as per the client contract are:- ABC construction group will incur a penalty if the work is not completed by the deadline of 47 weeks from now. ABC construction group will be...

  • F: The activities in the following table describe the construction of a new house. Activity Predecessor(s)...

    F: The activities in the following table describe the construction of a new house. Activity Predecessor(s) Duration(days) A: Clear site B: Bring utilities to site Excavate D: Pour foundation E: Outside plumbing B, C Frame house D G: Do electric wiring H: Lay floor Lay roof F Inside plumbing E, H K: Shingling Outside sheathing insulation F.J M: Install windows and outside doors F Do brick work L, M 0: Insulate walls and ceiling GJ Cover walls and ceiling 0...

  • (30%Juana Pueblo is the owner ofJPPR Construction, a Activity Description company that specializes in the construction of single-family residences and small office buildings. She wants to apply p...

    (30%Juana Pueblo is the owner ofJPPR Construction, a Activity Description company that specializes in the construction of single-family residences and small office buildings. She wants to apply project scheduling techniques to one of the homebuilding project she will be undertaking in the near future, Juana hasRough plur identified each of the major activities required for this projectD Frame and has estimated how much time each activity will require Finis The table at the right summarizes this information along withInstall HVAC...

  • Problem 15-7 Consider the following table of precedence relationships for a portion of a house building...

    Problem 15-7 Consider the following table of precedence relationships for a portion of a house building project: Task Duration Estimates Immediate Predecessor(s) A Prepare Site 3 days None B Install Rough Plumbing 2 days Prepare Site C Pour Concrete Foundation 3 days Install Rough Plumbing D Concrete Curing Time 4 days Pour Concrete Foundation E Preassemble Wall Frames 6 days None F Erect Wall Frames 2 days Preassemble WF, Cure Concrete G Install Roof 1 day Erect Wall Frames H...

  • Use a PERT network to establish the expected duration for the project described in the table...

    Use a PERT network to establish the expected duration for the project described in the table below:    (SHOW the PERT NETWORK) Activity Predecessors Duration a        m       b Exp. Duration Var. Crash Week 1 Crash Week 2 A - 3 6 9 700 100 B A 6 7 14 600 200 C A 4 6 14 400         600 D B, C 4 6 8 200                             600 E B, C 6 9 12 400 300 F C 4 6 14...

  • Orleans Construction Company Case (adapted from Meredith and Mantel) The Orleans Construction Company, a small construction...

    Orleans Construction Company Case (adapted from Meredith and Mantel) The Orleans Construction Company, a small construction company in North Carolina, has been awarded a contract for the construction of a new 25,000 soccer stadium at Greensboro. The City is hoping to use this facility to attract a new soccer franchise. The construction cannot start earlier than March 2, 2020 (because of the availability of bond funds) and must be completed within 1 year (52 weeks). A penalty clause of $13,000...

  • can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was...

    can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT